Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department - UPMID Tender
Civil And Construction
Excavation
Eprocure
Opening Date31 Jul 2023
Closing Date7 Aug 2023
Tender AmountRefer Documents
Costs
EMD
₹ 6,08,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPMID_825275_1Bid Award Id
ViewTender No
334(E-85/23-24)Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in slush and lahel including disposal of excavated slush / lahel up to 2 km. distance
25155.95
-
-
... More
Dressing of E/W on Bund (100%)
3613.37
-
-
... More
Compaction of E/W on Bund (100%)
3613.37
-
-
... More
CONSTRUCTION OF INLET
-
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
18.6
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
9.27
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
19.56
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
28.98
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
1.41
-
-
... More
S/F 600 mm Dia hume pipe NP-3
15
-
-
... More
CONSTRUCTION OF OUTLET
-
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
1.3
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
2.68
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
2.75
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
12
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
0.31
-
-
... More
S/F 600 mm Dia hume pipe NP-3
5
-
-
... More
CONSTRUCTION WORK OF RAMP
-
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
11.55
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
11.25
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
19.57
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
21.6
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
0.37
-
-
... More
CONSTRUCTION OF DESILTING CHAMBER
-
-
-
... More
EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C ALL COM.
45
-
-
... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS.
2.7
-
-
... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.
13.4
-
-
... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
32
-
-
... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
0.76
-
-
... More
M.S OR IRAN WORK OF SMALL SIZE AND SECTION I/C PROPER COMPLETION OF THE WORK (TOP COVER / ZAL AND TWO SIDE ZALI WITH OPENING ARRANGEMENT FACILITY )
4
-
-
... More
Painting roofs or othar iron work in large areas with one coat priming and one coat of approved (above one Sq.Metre) paint (British antesol or equivalent) including supply of all materials labour Tools & plants etc. required for proper completion of the work. Paint to be used ISI Marked. as per
24.02
-
-
... More
CONSTRUCTION OF FLAG HOSISTING WORK
-
-
-
... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS
1
-
-
... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK
2.81
-
-
... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
3.68
-
-
... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
0.3
-
-
... More
SUPPLY AND FIXING OF IRON ROD 63 MM SIZE FOR FLAG HOISTING,PAINTING WORK OF FLAG HOISTING PLATFARM ETC. I/C ALL COMPLETE
4
-
-
... More
S/f RCC HUME PIPE 350 MM DIA I/C ALL COMP
7.5
-
-
... More
DEWATERING BEFORE AND DURING DIGGING
879
-
-
... More
PHOTOGRAPHY AND VIDEO GRAPHY ( 03 STAGE ) BEFORE, DURING AND AFTER COMLETION OF WORK
1
-
-
... More
S/F OF M.S IRON SIGN BOARD
1
-
-