Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Jul 2024
Closing Date25 Jul 2024
Tender Amount₹ 2,72,000
Costs
EMD
₹ 27,000Document Cost
₹ 677Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPMID_939357_2Bid Award Id
ViewTender No
284/MI/Nivida/24-25 Dated 11-07-2024Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
200 mm dia boring drilling charges suitable confirming IS standard.
40
-
-
preparation of lowering of 150 mm 6 kgf PVC assembly
40
-
-
150 mm 6 kgf/cm2 PVC plain pipe
6
-
-
150 mm 6 kgf PVC perforated/slotted pipe
34
-
-
150 mm MS clamp including nut & bolt
1
-
-
150 mm PVC end cap
1
-
-
Solvent cement
1
-
-
Nylon mesh
34
-
-
Nylon dori 5 mm.
50
-
-
Development of Boring
10
-
-
Around pipe pea gravel "(πD1^2/4-πD2^2/4
1
-
-
Providing and fixing 110 mm dia P.V.C Pipe confirming to I.S STD make working pressure 6 kg per sqm including labour T&P all completion of work.
140
-
-
110 MM P.V.C bend
20
-
-
110 mm dia iron clamp
35
-
-
UPVC--T (110 mm) DIA
35
-
-
Fastner
70
-
-
Earth work Excavation in foundation in ordinary soil (Loam, Clay or
Sand) including lift upto 1.50 m and lead upto 30m and
including filling watering and ramming of excavated earth
into the trenches or into the space between the building and
the sides of foundation trenches or into the plinth and
removal and disposal of surplus earth as directed by the
Engineer In-charge upto a distance of 30m from the
foundation trenches
51.72
-
-
Dismentling cement concrete or brick or granolithic floors including stacking or dismantled marerials as directed by engineer in charge all completion of work.
1
-
-
Providing and laying cement concrete in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal
size) and curing complete, Including cost of form work. In Foundation and floors.
2.19
-
-
Class-150 (Non Modular) brick work in 1:4 cementand Coarse sand mortar in foundation and plinthincluding supply of all materials, labour and T&P etc.required for proper completion of the work.
11.48
-
-
12mm Cement plaster with cement mortar inproportion of 1:4 cement & coarse sand of single coatfor interior plastering upto floor two level includinginternal rounded angles chamfers, and roundedangles not exceeding 80mm in girth and finished evenand smooth.
34.47
-
-
RCC work Providing and laying in position specified grade of rein forced cement concrete, including the cost of centering shuttering finishing and excluding reinforcement - All work up to plinth level : 1:2:4 (with 10 to 20 mm stone aggregate in size with all com. of work
1.91
-
-
Mild steel or iron work in plain work such asreinforced concrete or reinforced brick work (When notincluded in and an over all rates) brought to requiredshape as necessary including bending for propercompletion of the work and excluding the supply ofsteel and its waistage Bend, hooks, binding wire andauthorized over lapping shall be measured upto floorto leve
1.5
-
-
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominalsize) and curing complete, Including cost of form work.
1.83
-
-
Brick ballast 20 to 40 mm filling in layar
10.85
-
-
10 to 20 mm stone aggrigate filing in layer
3.25
-
-
Nylon mesh for filter layer 1.40 micron
10.85
-
-
Coarse sand filling in layer
3.25
-
-
Painting of storage chamber and filter chamber all completion of work
1
-
-
Photographs
20
-
-
RCC lid cover(cap) with iron frame including fixing all complete work.
1
-
-
C.I.B BOARD
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements