Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date3 Nov 2022
Closing Date9 Nov 2022
Tender Amount₹ 20,60,000
Costs
EMD
₹ 2,06,000Document Cost
₹ 900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPMID_743918_1Bid Award Id
ViewTender No
1151/M.I./AC/Enivida notice/2017-18 DATE 20.10.22Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(iii lift) Making Diversion drain With o/soil up to 1.80 m. to 2.10 m. lift & 30m. lead i/all complet.
42
-
85.4
(i lift) Earth work excavation in ordinary soil / kanker mixed hard soil I/c Up to 1.50 m. lift and 30 m. lead
491.34
-
81
(ii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.50 m. to 1.80 m lift and 30 m. lead
136.91
-
83.2
(iii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.80 m. to 2.10 m lift and 30 m. lead
155.13
-
85.4
(iv lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 2.10 m. to 2.40 m lift and 30 m. lead
173.45
-
87.6
(v lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 2.40 m. to 2.70 m lift and 30 m. lead
192.12
-
89.8
(vi lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 2.70 m. to 3.00 m lift and 30 m. lead
70.03
-
92
Removal of slush from nala bed before excavation s.soil Up to 2.40 m. to 2.70 m lift and 30 m. lead
21.75
-
115
Earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. Beyond 1.50 lift and 30 m. lead
378.26
-
117.5
P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
111.61
-
5537.45
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation.
39.02
-
6038.89
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
51.7
-
6038.89
R.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
73.55
-
5164.55
P.C.C. Work with 1:2:4 (cement,c/sand & 10-20 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
27.53
-
7333.13
Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
37.85
-
233.03
Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
80.35
-
145.2
Laying of C/Sand in inverted filter including cost of material, labour etc.
3.17
-
3345
Laying of Gravel/Mooram in inverted filter including cost of material, labour etc.
3.17
-
1159
Laying of 20-40 Sballast in inverted filter including cost of material, labour etc.
3.17
-
2243
Laying of dry stone boulder filling in inverted filter including cost of material, labour etc.
15.85
-
1982
(i) Removal of cofferdam up to 1.50 m. lift.
173.09
-
81
(ii) Removal of cofferdam Beyond 1.50 m. to 1.80 m lift.
38.21
-
83.2
(iii) Removal of cofferdam Beyond 1.80 m. to 2.10 m lift.
37.41
-
85.4
(iv) Removal of cofferdam Beyond 2.10 m. to 2.40 m lift.
71.68
-
87.6