Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date11 Sep 2024
Closing Date18 Sep 2024
Tender Amount₹ 34,44,000
Costs
EMD
₹ 3,45,000Document Cost
₹ 854Tender Fee
Refer Documents
Summary
Deeping And Rennovation Of Pond Village Dattiyana Block Simbhawali Distt Hapur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPMID_954466_1Bid Award Id
ViewTender No
245/EE Dt. 31-08-2024 (E-44/2024-25)Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Digging of Pond upto 3.00m deep By Excavator Machine (Poclain) and Including Shifting of excavated soil to Bund of Pond by Tractor Trolley.
8311.86
-
-
Earth work in manual dressing & Profile making of bund including remming and dressing the surface to required levels and slopes.(15.0% Earth actual qty for Bund) As per IDS. Chapter-V Item no 4
709.12
-
-
Dewatering Before and during the digging earth work, by diesel pumpset.
246
-
-
Construction work of Inlet 3 nos :-
-
-
-
E/W in digging in foundation in ordinery soil.
34.8
-
-
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
14.94
-
-
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
37.5
-
-
(ii) Laying and jointing of 900mm dia Hume pipe in position, jointed with jute and stiff mixture of cement morter in 1:2 cement and fine sand including testing of joints complete, labour and T&P etc. required for proper completion of work.
37.5
-
-
First class Brick work in 1:4 Cement, Sand mortar including all.
20.07
-
-
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
1.71
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
75
-
-
Construction work of Outlet :-
-
-
-
E/W in digging in foundation in ordinery soil.
24.62
-
-
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
4.08
-
-
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
12.5
-
-
(ii) Laying and jointing of 900mm dia Hume pipe in position, jointed with jute and stiff mixture of cement morter in 1:2 cement and fine sand including testing of joints complete, labour and T&P etc. required for proper completion of work.
12.5
-
-
First class Brick work in 1:4 Cement, Sand mortar including all.
6.58
-
-
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
0.32
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
25.85
-
-
Construction work of Ramp :-
-
-
-
E/W in digging in foundation in ordinery soil.
60.14
-
-
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
13.79
-
-
First class Brick work in 1:4 Cement, Sand mortar including all.
14.07
-
-
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
5.68
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
17.75
-
-
Construction work of Ghat :-
-
-
-
E/W in digging in foundation in ordinery soil.
30.22
-
-
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
12.42
-
-
First class Brick work in 1:4 Cement, Sand mortar including all.
20.29
-
-
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
3.58
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
55.25
-
-
Construction work of Pacca Benches and other work in pond:-
-
-
-
E/W in digging in foundation in ordinery soil.
3.78
-
-
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
3.49
-
-
First class Brick work in 1:4 Cement, Sand mortar including all.
13.12
-
-
Brick on edge 1:6 cement, sand morter .
250
-
-
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
0.63
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
52.56
-
-
Supply and Fixing of steel Sing Board
-
-
-
Sing Board
1
-
-