If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Meerut Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date26 Sep 2023
Closing Date16 Oct 2023
Tender Amount₹ 2,71,59,000
Costs
EMD
₹ 5,44,000Document Cost
₹ 5,700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MDAUP_843286_1Bid Award Id
ViewTender No
01_543 Dated 22 September 2023Tender Authority
Meerut Development Authority ViewPurchaser Address
-Website
http://https://mdameerut.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and sparying primar at the rate of 0.5 kg per sqm with mechanical means.(A.R.)
5495
198369
36.1
... More
Providing and laying bituminous macadam
(BM) with 60-90 TPH hot mix plant producing an average output at 25 cum per hour crushed aggregate of specified grading premixed woth bituminous binder @3.40%transported to site finisher to the required grade, level and sligment and rolled as per clauses,501.6 and 501.7 to achieve the desired completion.(A.R.)
549.5
4374239
7960.4
... More
Providing and applying tak coat with bitumen emulsion slow setting using spray set including cleaning of road surface and sparying primar at the rate of 0.25 kg per sqm with mechanical means.(A.R.)
5495
103855
18.9
... More
Providing and laying bituminous concrete (BC) with 60-90 TPH hot mix plant using crushed of specified grading premixed with bituminous binder @5.00% transported to site. land over a preiously prepared surface with paver finisher to the required grade, level and alignement and rolled as per clauses,508 to achieve the desired completion.(A.R.)
198.8
2051814
10321
... More
Road Marking thermoplastic compound with
reflectorising Glass Beds on Bituminius surface
,Providing and laying of Hot applied
thermoplastic compund 2.5 mm thick including
reflectorising. New item-7 SOR 22
117.75
73005
620
... More
supply and Laying 80mm thick pre cast cement
concrete I shape Interlocking Paver block with
isi mark confiring to is : 15658-2006 with top
Layersof minimum 5 mm thickness having Plain
dimension 200x(160+120) mm of OPC smooth
High Gloss Vibro Compression mechanisim.SOR/22/New item-014
2748
2088480
760
... More
PART (B) DRAIN WORK
-
-
-
... More
Excavation in foundation in ordinary soil including dressing Section to the required grade Camber & Side slopes & Conveying the Excavated materials with all Lift & Lead upto 1.50 m and lead up to 30.00 m& Spreading for embankment or stacking as directed etc complete.SOR/22/251
565.2
50868
90
... More
Concrete with 4cm gauge brick ballast ,Fine sand of 1.25 F.M and cement, in proportion of 8:4:1 in foundations and under floors,including supply of all materials, labour,tools & plants etc. required for proper completion of the work.SOR/22/275
117.75
382687
3250
... More
M-150 Brick work in 1:4 (1 cement : 4 coarse sand)in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.SOR/22/ 305(a)
216.66
996636
4600
... More
12mm thick plaster with cement and coarse sand and in 1 : 4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SOR/22/584a
942
150720
160
... More
Cement concrete with 2 cm gauge approved stone grit , approved coarse sand and cement in the proportion of 4:2:1 including supply of all material , labour and T&P etc. required for Proper completion of work as directed by the Engineer-in-charge as per SI. No (279a). (Rates are including all taxes,freight etc but excluding GST). SOR/22
29.83
168539
5650
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in slab 2 cm gauge including the cost of centering, shuttering, finishing and excluding
reinforcement - All work up to plinth level in :1:1.5:3 (1
cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm
nominal size)SOR/22/284a
18
131400
7300
... More
M.S (Tor steel plain or plain) in plain work such as R.C.C or R.B work including cost of binding wire SI. No (504). work for drain slab
-
-
-
... More
cross bar 12Ø
9.35
78782
8425.94
... More
main bar 16Ø
12.09
101948
8432.43
... More
PART (C) WATER LINE WORK
-
-
-
... More
Exeavation in Foundation in ordinary soil (clay or sand) including
lift upto 1.50m and lead upto 30m. And including filling
watering and ramming of excavated earth into the trenches or into space
between the building and the sides of foundation trenches or into
the plinth and removal and disposal of surplus earth as directed
by the engineers-in-charges upto a distance of 30m from the
foundation trenches. PWD SOR 251
1059.75
95377
90
... More
Supply of the following size of pipes including loding unloding &cartage up to the site.
-
-
-
... More
PVC pipe (6 kg/cm2) 110 mm PWD shude. (30A) SOR
785
157000
200
... More
Supply of specials for PVC pressuri pipes
-
-
-
... More
PVC pipe specials 5% of item no. 18A
7850
7850
1
... More
Carting &laying and jointing of the foolowing sizes of pipes inclunding lowering them into the trenches including the cost of all jointing material labour T&P etc complete
-
-
-
... More
PVC pipe (6 kg/cm2) 110mm UPJAL NIGAM
785
30332
38.64
... More
Supply of the following size of sluice valves in cluding loding unloding at the site. AS per is 780-1960
-
-
-
... More
sluice valve 110 mm dia UPJAL NIGAM
8
137200
17150
... More
Supply of scour Valve 110 mm dia UPJAL NIGAM
8
137200
17150
... More
Supply of fire Hydrant 80 mm dia UPJAL NIGAM
8
73160
9145
... More
Carting & laying and jointing of the foolowing sizes of sluice valves inclunding lowering them into the trenches including the cost of all jointing material labour T&P etc complete. Sluice valv 200 mm dia.
-
-
-
... More
sluice valve 110 mm dia UPJAL NIGAM
8
11906
1488.35
... More
Supply of scour Valve 110 mm dia UPJAL NIGAM
8
11906
1488.35
... More
fire Hydrant 80 mm dia UPJAL NIGAM
8
8852
1106.55
... More
D joint 5" dia PVC
60
33000
550
... More
Socket 5" dia PVC
60
9000
150
... More
Constructing masonry chamber 0.90x0.90x1.50 mtr inside in brick work in cement morter 1:3 (1 cement ,3 coarse sand) for sluice valve with RCC cover with with frame,footrest and RCC top slab 1:2:4 mix (1 cement ,2 coarse sand 4 graded stone aggreagate 20 mm nominal size) i/c necessary excavation foundation concregate 40 mm nominal size) and inside plastring with cement mortar 1:3 (1 cement ,3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : with common burnt clay F.P.S. (non modular) bricks of class designation 7.5(AR)scour Valve, Air valve, fire Hydrent chambers Masonry type. (A.R.)
8
179365
22420.67
... More
PART (D) SEWER LINE WORK
-
-
-
... More
Excavation of earth of sewer line including lift upto 1.50m and lead upto 30m. And including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into main holes and connecting chamber the plinth and removal and disposal of surplus earth as directed by the engineers-in-charges upto a distance of 30m from the. 251(A)
-
-
-
... More
1(A) 0.00-1.5m B.G.L.
1766.25
377924
213.97
... More
1(B) 1.50-3.00m B.G.L.
1177.5
314157
266.8
... More
Supply of 350 mm dia RCC hume pipes NP-3 class socket and spigot type of standard mark as per direction of E/I
785
855650
1090
... More
Carting and laying of hume pipe NP-3 class & specials from store to the working site to work. Lowering the same into trenches,true to alignment,cauking the joints with with rubber ring, & joint with 1:2 cement mortar below invert level of pipe, coast of all jointing materials,testing etc complete.(A.R.)
-
-
-
... More
3(A) 0.00-1.5m B.G.L.
261.55
147252
563
... More
3(B) 1.50-3.00m B.G.L.
523.33
313474
599
... More
Constructing masonry chamber 1.0x1.2x3 mtr inside in brick work in cement morter 1:3 (1 cement ,3 coarse sand) for sluice valve with RCC cover with with frame,footrest and RCC top slab 1:2:4 mix (1 cement ,2 coarse sand 4 graded stone aggreagate 20 mm nominal size) i/c necessary excavation foundation concregate 40 mm nominal size) and inside plastring with cement mortar 1:3 (1 cement ,3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : with common burnt clay F.P.S. (non modular) bricks of class designation
28
1028860
36745
... More
Construction of Brick main hole of regulating shift(1.0m*1.2m*3.0m) size -----as per direection of E/I
28
-200100
7146.43
... More
Open timbering in trenches for depth up to 3.00 mtr BGL and consisting of 40 mm thick approved country wood plank all complete as per direction of E/I. (Analyzes RATE)
1570
510250
325
... More
Cement Concrete with 4 cm gauge approved stone grit,
coarsesand &cemenl in the proportion of 8:4:1 including
supply of all male als, labour, Tools & plants etc.
required for proper completion of the work.
176.63
844291
4780