Meerut Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Meerut Development Authority Tender

Works
Civil And Construction
Eprocure
Opening Date14 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 65,11,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying sepreading wet mix Macadam (WMM) to thick including Mechanically compaction etc. complete.(A.R.)

149

598980

4020

... More
Providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and sparying primar at the rate of 0.5 kg per sqm with mechanical means.(A.R.)

660

37620

57

... More
Providing and laying bituminous macadam (BM) with 60-90 TPH hot mix plant producing an average output at 25 cum per hour crushed aggregate of specified grading premixed woth bituminous binder @4.5%transported to site finisher to the required grade, level and sligment and rolled as per clauses,501.6 and 501.7 to achieve the desired completion.(A.R.)

33

321618

9746

... More
Providing and applying primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and sparying primar at the rate of 0.5 kg per sqm with mechanical means.(A.R.)

660

8580

13

... More
Providing and laying bituminous concrete (BC) with 60-90 TPH hot mix plant using crushed of specified grading premixed with bituminous binder @5.40% transported to site. land over a preiously prepared surface with paver finisher to the required grade, level and alignement and rolled as per clauses,508 to achieve the desired completion.(A.R.)

18

201006

11167

... More
supply and Laying 80mm thick pre cast cement shape Interlocking Paver block with isi mark confiring to is : 15658-2006 with top Layersof minimum 5 mm thickness having Plain dimension 200x(160+120) mm of OPC smooth High Gloss Vibro Compression mechanisim.SOR/22 /New item-014

408

310080

760

... More
PART (B) DRAIN WORK

-

-

-

... More
Excavation in foundation in ordinary soil including dressing Section to the required grade Camber & Side slopes & Conveying the Excavated materials with all Lift & Lead upto 1.50 m and lead up to 30.00 m& Spreading for embankment or stacking as directed etc complete.SOR/22/251

98

8820

90

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors,…. work.

22

71500

3250

... More
M-150 Brick work in 1:4 (1 cement : 4 coarse sand)in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.SOR/22/ 305(a)

47

216200

4600

... More
12mm thick plaster with cement and coarse sand and in 1 : 4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.SOR/22/584a

194

31040

160

... More
Cement concrete with 2 cm gauge approved stone grit , approved coarse sand and cement in the proportion of 4:2:1 including supply of all material , labour and T&P etc. required for Proper completion of work as directed by the Engineer-in-charge as per SI. No (279a). (Rates are including all taxes,freight etc but excluding GST). SOR/22

6

33900

5650

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in slab 2 cm gauge including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)SOR/22/284a

9

65700

7300

... More
M.S (Tor steel plain or plain) in plain work such as R.C.C or R.B work including cost of binding wire SI. No (504).AR

8

63840

7980

... More
PART (C) Water Line Work

-

-

-

... More
Exeavation in Foundation in ordinary soil (clay or sand) including lift upto 1.50m and lead upto 30m. And including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineers-in-charges upto a distance of 30m from the foundation trenches. PWD SOR 251

736.2

66258

90

... More
Supply of the following size of pipes including loding unloding & cartage up to the site. (30A) SOR

160

32000

200

... More
Supply of specials for PVC pressuri pipes specials 5% of item no. 20

160

1600

10

... More
Carting &laying and jointing of the foolowing sizes of pipes inclunding lowering them into the trenches including the cost of all jointing material labour T&P etc complete PVC pipe (6 kg/cm2) 110mm UPJAL NIGAM

160

6182

38.64

... More
Supply of the following size of sluice valves in cluding loding unloding at the site. AS per is 780-1960 sluice valve 110 mm dia UPJAL NIGAM

3

51450

17150

... More
Carting & laying and jointing of the foolowing sizes of sluice valves inclunding lowering them into the trenches including the cost of all jointing material labour T&P etc complete. Sluice valv 200 mm dia. sluice valve 110 mm dia UPJAL NIGAM

3

4465

1488.35

... More
Constructing masonry chamber 0.90x0.90x1.50 mtr inside in brick work in cement morter 1:3 (1 cement ,3 coarse sand) for sluice valve with RCC cover with with frame,footrest and RCC top slab 1:2:4 mix (1 cement ,2 coarse sand 4 graded stone aggreagate 20 mm nominal size) i/c necessary excavation foundation concregate 40 mm nominal size) and inside plastring with cement mortar 1:3 (1 cement ,3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : with common burnt clay F.P.S. (non modular) bricks of class designation 7.5(AR)scour Valve, Air valve, fire Hydrent chambers Masonry type. (A.R.)

3

67262

22420.67

... More
PART (D) SEWER LINE WORK

-

-

-

... More
Excavation of earth of sewer line including lift upto 1.50m and lead upto 30m. And including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into main holes and connecting chamber the plinth and removal and disposal of surplus earth as directed by the engineers-in-charges upto a distance of 30m from the. 251(A) 1(A) 0.00-1.5m B.G.L.UPJAL NIGAM

754.04

190229

252.28

... More
Excavation of earth of sewer line including lift upto 1.50m and lead upto 30m. And including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into main holes and connecting chamber the plinth and removal and disposal of surplus earth as directed by the engineers-in-charges upto a distance of 30m from the.1(B) 1.50-3.00m B.G.L.UPJAL NIGAM

443

140789

317.81

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors including suppl of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR 22/273

62

181660

2930

... More
Supply of 350 mm dia RCC hume pipes NP-3 class socket and spigot type of standard mark as per direction of E/I. New item SOR - 22/page no - 09

265

288850

1090

... More
Carting and laying of hume pipe NP-3 class & specials from store to the working site to work. Lowering the same into trenches,true to alignment,cauking the joints with with rubber ring, & joint with 1:2 cement mortar below invert level of pipe, coast of all jointing materials,testing etc complete.(A.R.) 3(A) 0.00-1.5m B.G.L. for sever line UPJAL NIGAM

200

223916

1119.58

... More
Carting and laying of hume pipe NP-3 class & specials from store to the working site to work. Lowering the same into trenches,true to alignment,cauking the joints with with rubber ring, & joint with 1:2 cement mortar below invert level of pipe, coast of all jointing materials,testing etc complete. 3(B) 1.50-3.00m B.G.L. Rate above serial no 30 @ 4.45% Add Extra = 1119-58 +201.52 = 1321.10 (UP Jal Nigam)

200

264220

1321.1

... More
Constructing masonry chamber 1.0x1.2x3 mtr inside in brick work in cement morter 1:3 (1 cement ,3 coarse sand) for sluice valve with RCC cover with with frame,footrest and RCC top slab 1:2:4 mix (1 cement ,2 coarse sand 4 graded stone aggreagate 20 mm nominal size) i/c necessary excavation foundation concregate 40 mm nominal size) and inside plastring with cement mortar 1:3 (1 cement ,3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : with common burnt clay F.P.S. (non modular) bricks of class designation

48

1763760

36745

... More
Construction of Brick main hole of regulating shift(1.0m*1.2m*3.0m) size -----as per direection of E/I. Subtrucption diffrence (3 - 2.25 Mt. =0.75 Mt.)

16.5

-117916

7146.43

... More
Open timbering in trenches for depth up to 3.00 mtr BGL and consisting of 40 mm thick approved country wood plank all complete as per direction of E/I. ((UP Jal Nigam))

1092

516363

472.86

... More
dismantling brick work or stone work lime or cement mortar and including stacking of matelials as directed bey the engineer in charge within a distance of 60 meter (200 feet). SI No . 12.02

143

57200

400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.