Meerut Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Meerut Development Authority Tender
Civil And Construction
Eprocure
Opening Date7 Dec 2018
Closing Date12 Dec 2018
Tender Amount₹ 11,59,000
Costs
EMD
₹ 24,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_MDAUP_280875_4Bid Award Id
ViewTender No
1564/CE/MDA/2018-19 Dt 28-11-2018 SBTender Authority
Meerut Development Authority ViewPurchaser Address
-Website
http://https://mdameerut.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Concrete with 4 cm guage brick ballast, fine sand of 1.25 F.M. & cement proportion of 12:6:1 in foundation. [S.I. No. 273]
23
59800
2600
... More
P/F open timbering including supply of all materials as plank, ballies, Wallar, Labour and T&P complete in all respect.
170
55292
325.25
... More
Supply of 300 mm R.C.C. hume pipe NP-2 class socket and spiget type of standard make as per direction of E/I/C.
130
55900
430
... More
Carting and laying of R.C.C. hume pipe NP-2 class & specials from stone to the working site of work, lowering the same into trenches, true to algnments. caulking the joints with rubber ring, & jointing with 1:2 cement mortar in coarse sand including excevationi of earth below invert level of pipe cost of all jointing materials, testing etc. complete.
-
-
-
... More
(a) 300mm Dia (0.0-1.5) M.BGL
65
24635
379
... More
(b) 300mm Dia (1.5-3.0) M.BGL
65
26221
403.4
... More
Construction of Main Hole of (1.00x1.20x3.00) m. internal size including base concrete of M-20 mix 1:2:4 of 15 cm. thick & P.C.C. 1:5:10 base conc. thickness 20cm with B.B. brick work in 1:3 cement & coarse sand mortar as per drawing R.C.C. slab of (1.21x1.21x0.15)m size of M-20 mix. including R/F upto 0.26 qtls in each M.H. and also including foot steps of PVC seethed cast iron. I No.s plastering the walls with 12 cm thick dedo plaster in 1:3 cement & coarse sand mortar and fixing charges of M.H. Cover excluding cost of cover, complete in all respect as per dir. of E/I/C
10
311750
31175
... More
Construction of Main Hole regulating shaft (1.00x1.20)m size including E/W in excavation brick work in 1:3 cement & coarse sand mortar & 3 Nos. PVC sheethed cast iron foot steps in per meter length, plastering the wall surface with & coarse sand mortar completer in all respect as per dirction of E/I/C
12
75936
6328
... More
R.C.C. Work with cement, approved coarse and & 2 cm gauge approved stone grit in proportion of 1:1.5:3 in slabs exluding supply of reinforcement and its bending but including its fixing and winding the same with 24 BWGGI binding wire and including necessary centering and suttering etc. and supply of all materials, labour, T & P etc. rqed. for proper completion of the work including cost of binding wire. [S.I. No. 284(a)]
28
184800
6600
... More
M.S. (tor steel or plain) in plain work such as R.C.C. work including bending for proper shape and including supply of steel and its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. [S.I. No. 504]
33
184800
5600
... More
M-150 Brick work in 1:4 (one cement and four coarse sand) mortar in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper complition of the work. [S.I. No. 305a]
8
32000
4000
... More
12 mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. [S.I. No. 584]
53
7685
145
... More
Cement Concrete with 2.00 cm guage appd. stone grite, coarse sand and cement in proportion of 4:2:1 including supply of all material labour T & P etc. all complete. [S.I. No. 279(a)]
3
15150
5050
... More
Making Connection of Sewer Line with existing Main Hole.
14
4824
344.6
... More
Providing 5 HP Pump at site on hire (Rate of One Hours).
64
6784
106
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements