Mathura Vrindavan Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Mathura Vrindavan Development Authority - MVDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Jul 2024
Closing Date11 Jul 2024
Tender Amount₹ 6,63,64,000 
Notes
Download

Costs

Summary

Work No 48 Janpad Mathura Ke Antargat 05 Kundo Ke Jalshodhan Ka Kary

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labor / Machinery charges

4

2200

550

... More
Providing hoe for labor

3

3000

1000

... More
Providing iron pan for labor

3

2850

950

... More
Transportation charges for the culture

178

921

5.18

... More
Nutrient removal by de-sedimentation and desludging Excavation for foundation / pipe trenches in slush muddy / marshy / lushy / soil including use of poclain, labour for dewatering during execution including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and preading as directed, preparing the bed by cleaning the mud, labour equired for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shall be paid separately.

2660

1050700

395

... More
Transporti ng the excavated material from site to 5 km outside including loading unloading etc. complete

2661

833132

313.09

... More
Create benthic system to enhance aquatic biodiversity Ecofert™

1680

1092000

650

... More
Stone Aggregate 20 mm

9

7200

800

... More
Labor / Machinery charges

5

2750

550

... More
Providing hoe for labor

3

3000

1000

... More
Providing iron pan for labor

3

2850

950

... More
Transportation charges for the culture

1680

8694

5.18

... More
Transportation charges for stone aggregates upto 5 km

9

1651

183.5

... More
Skid Mounted Filtration Unit (SMFU) for effective bioremediation of the nutrients in the kunda Ecofert™ 9 QTY 32 X KG X 650 ) Aggregate of size 2.5cm ( QTY 1 X CUM X 80O) Aggregate of size 5cm ( QTY 1 X CUM X 600 )Wooden Bars of bamboo of length 1m, of 1 inch thickness ( QTY 5 X NOS X 100 ) Wooden Bars of bamboo of length 0.5m, of thickness 1 inch ( QTY 5 X NOS X 90 ) Wooden Bars of bamboo of length 0.3mof thickness 1 inch ( QTY 5 X NOS X 80 ) Labor Charges QTY 32 X DAYS X 550 ) Biomat ( QTY 2 X SQ MTR X 1100 ) Plastic Wire mesh/Gabion of opening size 1cm ( QTY 2 X SQ . M X 320 ) Screw & nuts for fitting the structure ( QTY 2 X LUMPSUM X 95 )Transportation charges upto 5 km ( QTY 1 X LUMPSUM X 183.5 ) Transportation charges for the culture ( qty 32 X KG X 5.175 ) Numbers of SMF Units will be used

20

889835

44491.75

... More
Application of advance microbial culture Advance microbial culture

1773

1329750

750

... More
Labor / Machinery charges

32

17600

550

... More
Providing hoe for labor

27

27000

1000

... More
Providing iron pan for labor

27

25650

950

... More
Transportation charges for the culture

1773

9175

5.18

... More
Bank stabilization to control erosion Providing and laying biomat along the periphery of the kunda

1253

1378300

1100

... More
Providing shrub plantation

2505

137775

55

... More
Eco-wall Providing gabion in Nylon net for dry boulders packing

91

955500

10500

... More
Boulders

91

47775

525

... More
Heavy Mazdoor (male)

53

18020

340

... More
Solar aerators Solar charger 48V with Auto timer controller 0.5HP BLDC motor and controller with two paddle wheels and three floats with Solar Panel Fitting Stand Solar Panel - 24 V 325 Watt 2 nos. with 10 meter wire Battery 12V 40AH Solar type with fitting accessories – Solar blitz Other fitting accessoriesInstallation and commissioning charges Packing (Special wooden box), forwarding and Transportation charges

1

405000

405000

... More
Fencing for the drain flowing near the kund Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in osition, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277) A) Galvanized steel crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size of density 3.98 B)ISA 75 x 75 x 5 of density 5.70 Kg/m (Non-DSR)

3.55

248560

70017

... More
Construction and diversion of the flowing drain Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)

78

58890

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

15

17625

1175

... More
Providing and casting in situ C.C. of trap/ granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

13

117117

9009

... More
20mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.

203

21315

105

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

38

38950

1025

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete.

119

41650

350

... More
Mason I Class Skilled

263

144650

550

... More
Plumber With Tools - Skilled

13

6500

500

... More
Mazdoor - Unskilled Heavy Male

221

71825

325

... More
Maistry Skilled / Supervisor / Mate

181

99550

550

... More
Bhisti with Mashak

174

62640

360

... More
Construction and diversion of the flowing drain Periodical maintenance (twice in a year) of treatment system i.e. changing of biomats, Repairing/Replacement of damaged parts, culture addition ( QTY 1 X LUMPSUM X 3855 )Sampling & analysis- monthly one set of untreated & treated samples ( QTY 1 X LUMPSUM X 10000)Experts' visits including travelling, accommodation, man-day ( QTY 1 X MAN-DAYS X 1500) Gardner for maintenance of plants ( QTY 4 X MAN-DAYS X 325 ) TOTAL - 16655 Total Operation Cost per year (for first year)

12

179874

14989.5

... More
For second year

1.1

197861

179874

... More
For third year

1.1

217647

197861.4

... More
For fourth year

1.1

239412

217647.54

... More
For fifth year

1.1

263353

239412.29

... More
Project Management Consultancy

1

350000

350000

... More
Trap the loose soil particles coming from the runoffs Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)

367

277085

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

68

79900

1175

... More
Providing and casting in situ C.C. of trap/ granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M- 250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

62

558558

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

951

99855

105

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

186

190650

1025

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size).Including supply of all materials, water proofing compound, labour T&P etc. complete.

608

212800

350

... More
Aggregate

39

31200

800

... More
Stones

39

23400

600

... More
Complete Labour charges

79

43450

550

... More
Providing hoe for labour

6

6000

1000

... More
Providing spade for labour

6

5700

950

... More
Providing iron pan for labour

6

5700

950

... More
Transportation of construction debris upto 5 km

78

14313

183.5

... More
Reduce excess nutrients coming from the agricultural field through rainwater Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)

67

50585

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

30

35250

1175

... More
Providing and casting in situ C.C. of trap/ granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold,ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

47

423423

9009

... More
Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in osition, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277)

2

140034

70017

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

234

24570

105

... More
Organotreat™

11340

1530900

135

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

29

29725

1025

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete.

171

59850

350

... More
Transportation of the layering material upto 5 Km

111

20368

183.5

... More
Fine Sand

7

14000

2000

... More
Coarse sand

14

39200

2800

... More
Aggregate

27

20250

750

... More
Stones

27

14850

550

... More
Rubbles/boulders

40

21000

525

... More
Local Canna indica or Vetivera plants

747

82170

110

... More
Providing hoe for labour

6

6000

1000

... More
Providing spade for labour

6

5700

950

... More
Providing iron pan for labour

6

5700

950

... More
Complete labour charges

63

34650

550

... More
Transportation charges for the Organotreat™

11340

58684

5.18

... More
Application of initial microbial culture Special purpose microbial culture

287

186550

650

... More
Labor / Machinery charges

5

2750

550

... More
Providing hoe for labor

3

3000

1000

... More
Providing iron pan for labor

3

2850

950

... More
Transportation charges for the culture

287

1485

5.18

... More
Create benthic system Ecofert™

8600

5590000

650

... More
Stone Aggregate 20 mm

15

12000

800

... More
Labor / Machinery charges

5

2750

550

... More
Providing hoe for labor

3

3000

1000

... More
Providing iron pan for labor

3

2850

950

... More
Transportation charges for the culture

8600

44505

5.18

... More
Transportation charges for stone aggregates upto 5 km

15

17625

1175

... More
Solar aerators Solar charger 48V with Auto timer controller 0.5HP BLDC motor and controller with two paddle wheels and three floats with Solar Panel Fitting Stand Solar Panel - 24 V 325 Watt 2 nos. with 10 meter wire Battery 12V 40AH Solar type with fitting accessories – Solar blitz Other fitting accessories Installation and commissioning charges Packing (Special wooden box), forwarding and Transportation charges

1

405000

405000

... More
Skid Mounted Filtration Unit (SMFU) Ecofert™ ( QTY 32 X KG X 650 ) Aggregate of size 2.5cm ( QTY 1 X CUM X 800 ) Aggregate of size 5cm ( QTY 1 X CUM X 600 ) Aggregate of size 5cm ( QTY 1 X CUM X 600 ) WWooden Bars of bamboo of length 1m, of 1 inch thickness ( QTY 5 X NOS X 100 ) ooden Bars of bamboo of length 0.5m, of thickness 1 inch ( QTY 5 X NOS X 90 ) Wooden Bars of bamboo of length 0.3m of thickness 1 inch ( QTY 5 X NOS X 80 ) Labor Charges ( QTY 32 X DAYS X 550 ) Biomat ( QTY 2 X SQ M X 1100 ) Plastic Wire mesh/Gabion of opening size 1cm ( QTY 2 X SQ M X 320 ) Screw & nuts for fitting the structure ( QTY 2 X LUMPSUM X 95 ) Transportation charges upto 5 km ( QTY 1 X LUMPSUM X 1175 ) Transportation charges for the culture ( QTY 32 X KG X 5.75 ) TOTAL 45520.600 Numbers of SMF Units will be used

55

2495214

45367.54

... More
Afforestation in the premises. Neem Tree (Azadirachta indica)

4

440

110

... More
Karanja (Millettia pinnata)

2

220

110

... More
Bidi leaf tree (Bauhinia racemosa)

2

220

110

... More
Malsari (Mimusops elengi)

2

220

110

... More
Amla (Phyllanthus emblica)

2

220

110

... More
Indian laburnum / Amaltaas (Cassia fistula)

2

220

110

... More
Shirish (Albizia lebbeck)

4

440

110

... More
Raintree (Samanea saman)

2

220

110

... More
Jamun (Syzygium cumini L)

2

220

110

... More
Kadamba (Neolamarckia cadamba)

4

440

110

... More
Saptaparni (Alstonia scholaris)

4

440

110

... More
Rugtoora (Spathodea campanulata)

2

220

110

... More
Jaru (Lagerstroemia indica)

2

220

110

... More
Akash Neem (Millingtonia hortensis)

2

220

110

... More
Yellow Gulmohor (Peltophorum pterocarpum)

2

220

110

... More
Nupur/ blue Gulmohor (Jacaranda mimosifolia)

2

220

110

... More
Gajga/Kalinga (Caesalpinia bonduc)

2

220

110

... More
Badam (Terminalia catappa)

2

220

110

... More
Goolar (Ficus racemosa)

2

220

110

... More
Peepal (Ficus religiosa)

4

440

110

... More
Banyan (Bargad) (Ficus benghalensis)

4

440

110

... More
Ber (Ziziphus mauritiana)

2

220

110

... More
Cheel (Melaleuca quinquenervia)

2

220

110

... More
Khejri (Spunge tree) (Prosopis cineraria)

3

330

110

... More
Kaner (Oleander) (Nerium oleander)

3

330

110

... More
Arka (Gaint Indian Milkweed) (Calotropis gigantean)

3

330

110

... More
False Ashoka (Polyakthia longifolia)

3

330

110

... More
Gum Arabic tree (Acacia nilotica)

3

330

110

... More
Khas (Vetivera)

404

44440

110

... More
Soil Scape Filter (SSF) Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering,excluding backfilling, etc. complete. (Bd-A- 5/259

18

13590

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2

2350

1175

... More
Providing and casting in situ C.C. of trap/ granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in- charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

5

45045

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

51

5355

105

... More
Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in osition, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277)

1

70017

70017

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete.

28

9800

350

... More
Manhole cover

3

12000

4000

... More
Level controller

2

10000

5000

... More
Soil Scape Filter Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A- 5/259)

8

6040

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

4

4700

1175

... More
Providing and casting in situ C.C. of trap/granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in- charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

6

54054

9009

... More
Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in osition, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete. (Bd-C-6/277)

1

70017

70017

... More
Providing 20 mm thick plastering in cementmortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

44

4620

105

... More
Organotreat™

788

118200

150

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

10

10250

1025

... More
Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete.

24

8400

350

... More
UPVC pipe ( this includes honeycomb water distribution network)

252

25200

100

... More
Elbows/tee

32

1600

50

... More
End cap

32

960

30

... More
Channel for holding the Pipe network

1

70017

70017

... More
Lead of the layering material upto 5 km

8

1468

183.5

... More
Fine Sand

1

2000

2000

... More
Coarse sand

1

2800

2800

... More
Aggregate

2

1500

750

... More
Stones

2

1100

550

... More
Rubbles/boulders

3

1575

525

... More
Local Canna indica plants

48

5280

110

... More
Providing hoe for labour

11

11000

1000

... More
Providing spade for labour

11

10450

950

... More
Providing iron pan for labour

16

15200

950

... More
Mason I Class Skilled Day

37

20350

550

... More
Plumber With Tools - Skilled Day

11

5500

500

... More
Mazdoor - Unskilled Heavy Male Day

32

10400

325

... More
Maistry Skilled / Supervisor / Mate Day

29

15950

550

... More
Bhisti (Mixing / Curing) - Semi Skilled Day

28

10080

360

... More
Transportation charges for the culture

788

3546

4.5

... More
Treated Water Tank Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A- 5/259)

8

6040

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2

2350

1175

... More
Providing and casting in situ C.C. of trap/granite/ quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in- charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

2

18018

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

19

1995

105

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

5

5125

1025

... More
Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete.

9

3150

350

... More
Water Lifting Pump

3

19500

6500

... More
Operation & Maintenance Expenditure for Lalita Kund Periodical maintenance (twice in a year) of treatment system i.e. changing of biomats, Repairing/Replacement of damaged parts, culture addition ( 1 X LUMPSUM X 4497) Sampling & analysis- monthly one set of untreated & treated samples ( 1 X LUMPSUM X 10000) Experts' visits including travelling, accommodation, man-day Gardner for maintenance of plants ( QTY 1 X MAN DAY X 1500 ) Gardner for maintenance of plants ( qty 4 X MAN DAYS X 325 ) TOTAL 17297 Total Operation Cost per year (for first year)

12

186807

15567.3

... More
For second year

1.1

205488

186807.6

... More
For third year

1.1

226037

205488.36

... More
For fourth year

1.1

248640

226037.2

... More
For fifth year

1.1

273505

248640.92

... More
Project Management Consultancy

1

3843443

3843443

... More
1. Application of initial microbial culture Special purpose microbial culture

626

406900

650

... More
Labor / Machinery charges

11

6050

550

... More
Providing hoe for labor

5

5000

1000

... More
Providing iron pan for labor

5

4750

950

... More
Transportation charges for the culture

626

3239

5.18

... More
2. Nutrient removal by de-sedimentation & desludging Excavation for foundation / pipe trenches in slush muddy / marshy / lushy / soil including use of poclain, labour for dewatering during execution including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and preading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shall be paid separately.

6260

2472700

395

... More
Transporting the excavated material from site to 5 km outside including loading unloading etc. complete

6260

1959943

313.09

... More
Numbers of SMF Units will be used

120

5079720

42331

... More
4. Application of advance microbial culture for enhancement of biodiversity Advance microbial culture

2100

1575000

750

... More
Labor / Machinery charges

4

2200

550

... More
Providing hoe for labor

4

4000

1000

... More
Providing iron pan for labor

3

2850

950

... More
Transportation charges for the culture

2100

10867

5.18

... More
5. Bank stabilization to control erosion Providing and laying biomat along the periphery of the kunda

1529

1681900

1100

... More
Providing shrub plantation

3058

168190

55

... More
6. Installation of Ecoscade to treat domestic wastewaterGrit Chamber Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)

11

8305

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2

2350

1175

... More
Providing and casting in situ C.C. of trap/ granite/ quartzite / gneiss metal of approved quality for RCC works asper detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, ManiKgad, Rajashree, etc. cement is per mitted.) (Excluding M.S. or Tor reinforcement)

2

18018

9009

... More
20mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.

21

2205

105

... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.

3

3075

1025

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete.

8

2800

350

... More
Complete Labour Charges

2

1100

550

... More
For three Filtration Units-B

3

1303242

434414

... More
7. Operation & Maintenance Expenditure for Saubhari Kund Periodical maintenance (twice in a year) of treatment system i.e. changing of biomats, Repairing/Replacement of damaged parts, culture addition ( QTY 1 X LUMPSUM X 5689 ) Sampling & analysis- monthly one set of untreated & treated samples ( QTY 1 X LUMPSUM X 10000 ) Experts' visits including travelling, accommodation, man-day ( QTY 1 X DAY X 1500 ) Gardner for maintenance of plants ( QTY 4 X DAY X 325 ) TOTAL - 18489 Total Operation Cost per year (for first year)

12

203040

16920

... More
For second year

1.1

223344

203040

... More
For third year

1.1

245678

223344

... More
For fourth year

1.1

270246

245678.4

... More
For fifth year

1.1

297270

270246.24

... More
Project Management Consultancy

1

4180000

4180000

... More
1. Cleaning the water body with de-weeding De-weeding of pond manually

32

17600

550

... More
Transporting the excavated material from site to 5 km outside including loading unloading etc. complete

16

2936

183.5

... More
1. Cleaning the water body with de-weeding Special purpose microbial culture

114

85500

750

... More
Labor / Machinery charges

2

1100

550

... More
Providing hoe for labor

1

1000

1000

... More
Providing iron pan for labor

1

950

950

... More
Transportation charges for the culture

114

589

5.18

... More
1. Cleaning the water body with de-weeding Ecofert™

788

512200

650

... More
Stone Aggregate 20 mm

6

4800

800

... More
Labour / Machinery charges

2

1100

550

... More
Providing hoe for labour

1

1000

1000

... More
Providing iron pan for labour

1

950

950

... More
Transportation charges for the culture

788

4077

5.18

... More
Transportation Charges for stone aggregates upto 5 km

6

1101

183.5

... More
1. Cleaning the water body with de-weedingMicrobial Culture ( 32 X KG X 650 ) Aggregate of size 2.5cm ( QTY 0.05 X KG X 650) Aggregate of size 5cm ( QTY 0.05 X CUM X 600 )Wooden Bars of bamboo of length 1m, of 1 inch thickness ( QTY 4 X NOS X 100 ) Wooden Bars of bamboo of length 0.5m, of thickness 1 inch ( QTY 4 X NOS X 90 ) Wooden Bars of bamboo of length 0.3mof thickness 1 inch ( QTY 4 X NOS X 80 ) Labor Charges QTY 32 X DAYS X 550 ) Biomat ( QTY 1 X SQ MTR X 1100 ) Plastic Wire mesh/Gabion of opening size 1cm ( QTY 2 X SQ . M X 320 ) Screw & nuts for fitting the structure ( QTY 1 X LUMPSUM X 95 )Transportation charges upto 5 km ( QTY 0 X LUMPSUM X 183.5 ) Transportation charges for the culture ( qty 32 X KG X 5.175 ). NO. OF SMFU WILL BE INSTALLED - 41551 Numbers of SMF Units will be used Numbers of SMFU will be installed

22

913924

41542

... More
5. Application of advance microbial culture Special purpose microbial culture

1140

855000

750

... More
Labour / Machinery charges Providing 500 lit prefabricated tanks Mechanical spray with electrical pump

7

3850

550

... More
Providing hoe for labour

2

2000

1000

... More
Providing iron pan for labour

2

1900

950

... More
Transportation charges for the culture

1140

5899

5.18

... More
6. Solar aerators Solar charger 48V with Auto timer controller 0.5HP BLDC motor and controller with two paddle wheels and three floats with Solar Panel Fitting StandSolar Panel - 24 V 325 Watt 2 nos. with 10 meter wireBattery 12V 40AH Solar type with fitting accessories – Solar blitz Other fitting accessories Installation and commissioning charges Packing (Special wooden box), forwarding and Transportation charges

1

405000

405000

... More
Collection tank Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A-5/259)

14

10570

755

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2

2350

1175

... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap / granite /gneiss / quartzite metal for R.C.C. fins of required thickness in position as shown on the drawings or as directed by Engineer-in-charge including steel centering, plywood / steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement, including cover block) Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)

3

27027

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts

45

4725

105

... More
Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete

0.3

21005

70017

... More
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete.

24

8400

350

... More
Mainhole Cover

2

8000

4000

... More
Level Controller

1

5000

5000

... More
Soil Scape Filter Tank Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A- 5/259)

6

4530

755

... More
Providing dry/trap/granite/quartzite/gneiss rubble stone soiling 15 cm to 20 cm, thick including hand packing and compacting complete. Spec. No.: Bd. A 12 Page No. 264

3

3525

1175

... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap / granite /gneiss / quartzite metal for R.C.C. fins of required thickness in position as shown on the drawings or as directed by Engineer-in-charge including steel centering, plywood / steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement, including cover block) Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

4

36036

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts

38

3990

105

... More
Organotreat™

497

74550

150

... More
Providing second class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1:4 including scaffolding, racking out joints and watering etc.in pillar of curved shapes as shown in the drawing or as directed complete

8

8200

1025

... More
Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete

19

6650

350

... More
UPVC pipe ( this includes honeycomb water distribution network

226

22600

100

... More
Elbows/tee

25

1250

50

... More
End cap

25

750

30

... More
Channel for holding the Pipe network

0.1

7001

70017

... More
Lead of the layering material upto 5 km

5

917

183.5

... More
Fine Sand

0.3

600

2000

... More
Coarse sand

1

2800

2800

... More
Aggregate

1

750

750

... More
Stones

1

550

550

... More
Rubbles/boulders

2

1050

525

... More
Local Canna indica plants

28

3080

110

... More
Providing hoe for labour

53

53000

1000

... More
Providing spade for labour

53

50350

950

... More
Providing iron pan for labour

53

50350

950

... More
Mason I Class Skilled Day

32

17600

550

... More
Plumber With Tools - Skilled Day

1

500

500

... More
Mazdoor - Unskilled Heavy Male Day

26

8450

325

... More
Maistry Skilled / Supervisor / Mate Day

21

11550

550

... More
Bhisti (Mixing / Curing) - Semi Skilled Day

21

7560

360

... More
Extra Pumps

4

26000

6500

... More
Transportation charges for the culture

473

2447

5.18

... More
Treated Water Tank Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. (Bd-A- 5/259)

7

5285

755

... More
Providing dry/trap/granite/quartzite/gneiss rubble stone soiling 15 cm to 20 cm, thick including hand packing and compacting complete. Spec. No.: Bd. A 12 Page No. 264

1

1175

1175

... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap / granite /gneiss / quartzite metal for R.C.C. fins of required thickness in position as shown on the drawings or as directed by Engineer-in-charge including steel centering, plywood / steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement, including cover block) Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade

1

9009

9009

... More
Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts

18

1890

105

... More
Providing second class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1:4 including scaffolding, racking out joints and watering etc.in pillar of curved shapes as shown in the drawing or as directed complete

5

5125

1025

... More
Providing and laying damp proof course 50 mm thick in M20 cement concrete layer and bitumen / using cement with waterproofing compound curing, formwork etc. complete

8

2800

350

... More
Pumps

2

13000

6500

... More
Periodical maintenance (twice in a year) of treatment system i.e. changing of biomats, Repairing/Replacement of damaged parts, culture addition ( QTY 1 X LUMPSUM X 3947 ) Sampling & analysis- monthly one set of untreated & treated samples ( QTY 1 X LUMPSUM X 10000 ) Experts' visits including travelling, accommodation, man-day ( QTY 1 X DAY X 1500 ) Gardner for maintenance of plants ( QTY 4 X DAY X 325 ) TOTAL OPERATION COST PER MONTH - 16747 Total Operation Cost per year (for first year)

12

184224

15352

... More
For second year

1.1

202646

184224

... More
For third year

1.1

222911

202646.44

... More
For fourth year

1.1

245202

222911.08

... More
For fifth year

1.1

269722

245202.19

... More
Project Management Consultancy

1

98000

98000

... More
Excavation and Bank Stabilization in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in a wet or dry condition for Head Works .e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5M and lead of 150 M including barricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer- incharge, etc. complete excluding refilling.

2625

393750

150

... More
Treaming of the stream using JCB

37.8

46834

1239

... More
Supplying barricading Grills with Angle Iron Frames etc. complete for screen

1

346071

346071

... More
Providing plantation along the stream

1312.5

78750

60

... More
Providing garden soil along the stream for plantations

11.11

27777

2500

... More
Providing labour for plantation

48

15600

325

... More
Providing and laying biomat along the slopes of the stream

1575

1732500

1100

... More
Providing hoe for labour

11

11000

1000

... More
Providing spade for labour

11

10450

950

... More
Providing iron pan for labour

11

10450

950

... More
Green Bridge- for 3.24m

6

2291880

381980

... More
Green Bridge- for 5.13m

4

5042200

1260550

... More
Eco-cascade

3

47253

15751

... More
Metal Screen

1

328405

328405

... More
Green Bridge for 5.13 m width Rough stone dry packing in approns and revetments with hard granite stone (15 cm to 30 cm) etc. all complete.(10.13*500) Providing gabion in Nylon net for dry stone packing( 55.78*463) Rough stone dry packing in approns and revetments with hard granite stone (15 cm to 30 cm) etc. all complete. (rectangular portion (3.23*500) Rough stone dry packing in approns and revetments with hard granite stone (60 cm thick) etc. all complete. (J Hook) 7.18*500 Providing sand bed(4.41*2800) Providing and laying bio mat on sand bed and on top of ecofert (2 nos.) 18.38*1100 Providing and laying ecofert for filling pores between Stones 1764* 650 Planting saplings on top of bio mat (6/Sq. m) 44.1*60 Providing liquid culture in ecofert 36.75*850 Lead of 5 km for loading, unloading, for aggregate, stones 24.95*183.5 Mazdoor heavy for filling boulder, eco-fert in th 21*325 Rough stone dry packing in approns and revetments with hard granite stone (15 cm to 30 cm) etc. all complete.2280*500Providing gabion in Nylon net for dry stone packing 15.54*463 Rough stone dry packing in approns and revetments with hard granite stone (15 cm to 30 cm) etc. all complete. (rectangular portion) 1.020*500Rough stone dry packing in approns and revetments with hard granite stone (60 cm thick) etc. all complete. (J Hook2.270*500 Providing sand bed1.320*2800 Providing and laying bio mat on sand bed and on top of ecofert (2 nos.)5.510*1100 Providing and laying ecofert for filling pores between Stones 529.2*650 Planting saplings on top of bio mat (6/Sq. m) 13.650 * 60Providing liquid culture in ecofert 11.030*850Lead of 5 km for loading, unloading, for aggregate, stones 6.890*183.5 Mazdoor heavy for filling boulder, eco-fert in th 21*325 Total length of channel section ISMC75 Total length of angle section 50x50x5 Length of screen bar MS 12mm (Fe=500) Total area of metal sheet(MS Chequered Plate) 1mx1mx0.05m Steel wok in built up tubular (round,square or rectangular hollow tubes etc.) truses etc. including cutting. Hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. (Hot finised welded type tubes. Welder Charges Rough stone dry packing in approns and revetments with hard granite stone at quarry (15 cm to 30 cm) Transportation form stone quarry lead in 5 km Nylon Gabion Heavy MazdoorPerson for routine operations to remove solid waste from screen Periodical maintenance of treatment system i.e. changing of biomats, Repairing/Replacement of damaged parts, culture addition Sampling & analysis- monthly one set of untreated & treated samples Experts' visits including travelling, accommodation, man-day Total Operation Cost per year (for first year)

12

783205

65267.1

... More
For second year

1.1

861525

783205.2

... More
For third year

1.1

947678

861525.72

... More
For fourth year

1.1

1042446

947678.29

... More
For fifth year

1.1

1146690

1042446.12

... More
Less 5% as per Govt. Approoval

0.05

-3492840

69856800.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.