Madhyanchal Vidyut Vitran Nigam Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Eprocure
Opening Date16 Apr 2025
Closing Date28 Apr 2025
Tender Amount₹ 30,78,000
Costs
EMD
₹ 31,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
01/edcb/2025-26
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MVVNL_1027548_1Tender No
01/EDCB/2025-26Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
11 KV 3X300 Sqmm XLPE Cable Box Jointing Kit Outdoor
1
-
-
... More
11 KV 3X185 Sqmm XLPE Cable
0.72
-
-
... More
11 KV 3X185 Sqmm XLPE Cable Jointing Kit Indoor
12
-
-
... More
11 KV 3X185 Sqmm XLPE Cable Jointing Kit Outdoor
12
-
-
... More
11 KV VCB O/G
2
-
-
... More
63 KVA T/F
3
-
-
... More
100 KVA T/F
1
-
-
... More
250 KVA T/F
1
-
-
... More
PCC Pole Support 8.5 Mtr. Long
14
-
-
... More
ST Pole Support 11 Mtr. Long
2
-
-
... More
Top Channel (125x65x2240 mm)
2
-
-
... More
Top Channel (100x50x6, 2400 mm)
4
-
-
... More
S/S Base Angle (75x75x6x2028mm) bolt & Nut
2
-
-
... More
Disc Insulator T&C 45 KN
14
-
-
... More
11 KV Pin Insulator Composite
6
-
-
... More
Bracing Set 4.3x4.3 Mtr Angle Iron 65x65x6 mm with holding Clamp
4
-
-
... More
Earthing of Pole by MS Earthing Rod 20x2500 mm and 6 SWG Earthing wire etc
4
-
-
... More
ACSR Weasal Conductor
10
-
-
... More
Stay Rod (16x1800mm)
3
-
-
... More
Stay Wire (3.15mm 7/10 SWG)
15
-
-
... More
ABC Cable (3x95+1x70+1x16) sqmm
220
-
-
... More
ABC Cable (3x50+1x35+1x16) sqmm
240
-
-
... More
3 Phase Distribution Box
4
-
-
... More
L.T. LEAD LT XLPE Cable 1x240 Sqmm
40
-
-
... More
Dropper Channel (100x50x2028 mm)
1
-
-
... More
Dropper Channel (100x50 mm, 3200 mm Long)
4
-
-
... More
Complete Stay 9GI Stay Rod 20x1800 mm, Stay wire 7/8 SWG, 10 KG, Stay Clamp, Bolt, Nut and Washer with concrete Grouting
8
-
-
... More
LT XLPE Ceble AL.1X400 sq.mm
100
-
-
... More
LT XLPE Cable 3.5 X 240 sqmm.
250
-
-
... More
LT XLPE Cable 3.5 X 120 sqmm.
250
-
-
... More
LT XLPE Cable 3.5 X 50 sqmm.
500
-
-
... More
Armoured LT Service Cable of size 4Cx10 Sq mm
200
-
-
... More
Armoured LT Service Cable of size 2Cx6 Sq mm
1000
-
-
... More
The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom).
-
-
-
... More
Holding Clamp for Top & Dropper Channel, T-Off Channel
38
-
-
... More
Stone Pad (300x300x75 mm)
12
-
-
... More
Danger Plate with clamp and Nut & Bolt
13
-
-
... More
Distribution Box Clamps
2
-
-
... More
Piercing Connector
4
-
-
... More
LT Shackle Insulator
2
-
-
... More
Al. Lugs for 70 KV Sqmm Cable
16
-
-
... More
Al. Lugs for 240 KV Sqmm Cable
4
-
-
... More
Stay Insulator
3
-
-
... More
Stay Clamp
3
-
-
... More
GI Pipe 6" DIA
40
-
-
... More
LT Tailess Unit (600A)
1
-
-
... More
Gland of size 240 sqmm
15
-
-
... More
Gland of size 120 sqmm
15
-
-
... More
Gland of size 50 sqmm
40
-
-
... More
Aluminium Lugs of size 240 sqmm
45
-
-
... More
Aluminium Lugs of size 120 sqmm
60
-
-
... More
Aluminium Lugs of size 50 sqmm
200
-
-
... More
HDPE Pipe l20mm
50
-
-
... More
Aluminium Lugs of size 16 sqmm
100
-
-
... More
Aluminium Lugs of size 10 sqmm
300
-
-
... More
HDPE Pipe l40mm
50
-
-
... More
LT Lockable Distribution Boxes C type
15
-
-
... More
11 KV Fuse Set
4
-
-
... More
Cable Joint Kit/ ST For Cable 3.5 X 240 sqmm.
2
-
-
... More
Cable Joint Kit/ ST For Cable 3.5 X 120 sqmm.
2
-
-
... More
Cable Joint Kit/ ST For Cable 3.5 X 50 sqmm.
5
-
-
... More
Erection of the following support including cutting, making holes fixing of all types of accessories digging of pits complete in all respect as per UPPCL norms.
-
-
-
... More
Single PCC Pole 8.5 Mtr. Long.
2
-
-
... More
Double pole of PCC Pole 8.5 Mtr. Long.
6
-
-
... More
Double ST Pole 11 Mtr. Long.
1
-
-
... More
Grouting of following poles with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/CC & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor).
-
-
-
... More
Single PCC Pole 8.5 Mtr. Long.
2
-
-
... More
Double pole of PCC Pole 8.5 Mtr. Long.
6
-
-
... More
Double ST Pole 11 Mtr. Long.
1
-
-
... More
Erection/Fixing of stay set with stay wire and clamp as per RESSPO norms including binding. climbing, clamping, tightening and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and C.C. and sand etc. as per RESSPO norms. All the grouting material shall be provided by the contractor
3
-
-
... More
Laying, Stringing, Sagging & Jumpring of Following Conductor complete in all respect as per RESSPO Norms.
-
-
-
... More
ACSR Weasal Conductor
10
-
-
... More
Stay Wire (3.15mm 7/10 SWG)
15
-
-
... More
ABC Cable (3x95+1x70+1x16) sqmm
220
-
-
... More
ABC Cable (3x50+1x35+1x16) sqmm
240
-
-
... More
LT XLPE Cable 1x240 Sqmm
40
-
-
... More
A Type LT DB Pannel Doors (A type box having door spacification 700x2000 Sq mm and 900x2000 sq mm, A Box having door spacification 700x1650 Sq mm and 900x 1650 Sq mm with handle, locking arrangement and angle with concreting complete with all respect.)
2
-
-
... More
B Type LT DB Pannel Doors (B type box having door spacification 750x1500 Sq mm and 400x1500 sqmm, B Box having door spacification 900x1000 Sq mm with handle and locking arrangement and angle with concreting complete with all respect.)
4
-
-
... More
C Type LT DB Pannel Doors with handle and locking arrangement and angle with concreting complete with all respect.
20
-
-
... More
Digging & laying of 0.4 KV Cable (Double ckt) in trench with sand & brick and back filling
475
-
-
... More
Laying of 11 KV Cable in Air
40
-
-
... More
Making of J/kit
9
-
-
... More
Road Restoration Charge (Pakka Road) if Requried
780
-
-
... More
Laying of HDPE Pipe PE-80, PN-6, DN-200mm dia Pipe for laying of 0.4KV, 3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying for Road crossing (If required)
50
-
-
... More
Underground Laying of 11 KV 3x300 sq.mm XLPE cable in Single circuit (including cost of digging, bricks, sand along with road restoration) complete in all respect as per UPPCL Norms.
0.04
-
-
... More
Fixing of 11 KV 3x300 Sq.mm XLPE Cable Inoutdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
1
-
-
... More
Fixing of 11 KV 3x300 Sq.mm XLPE Cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
1
-
-
... More
Underground Laying of 11 KV 3x185 sq.mm XLPE cable in double circuit (including cost of digging, bricks, sand along with road restoration) complete in all respect as per UPPCL Norms.
0.24
-
-
... More
Underground Laying of 11 KV 3x185 sq.mm XLPE cable in single circuit (including cost of digging, bricks, sand along with road restoration) complete in all respect as per UPPCL Norms.
0.2
-
-
... More
Fixing of 11 KV 3x185 Sq.mm XLPE Cable Inoutdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
12
-
-
... More
Fixing of 11 KV 3x185 Sq.mm XLPE Cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
12
-
-
... More
Hoisting of 3x185 mm2 11 KV XLPE cable on double pole with GI pipe of size 6” dia including its jumpering complete with Clamps nut and bolts (Clamp, Nut & Bolts shall be provided by the contractor through approved vendor of UPPCL, Approx. 10 Mtr. Per Hosting). (for double circuit).
4
-
-
... More
Fixing of danger board on each location and G.I. barbed wire including proper clamping as per UPPCL Norms. (Danger Board shall be provided by the contractor as per RESSPO Norms) complete in all respect.
13
-
-
... More
Erraction/Fixing of Tailess Unit (600 A) (Tailess Unit shall be provided by the contractor as per UPPCL Norms). complete in all respect as per
1
-
-
... More
Errection and commissioning of 3 Phase Distribution Box on the LT Poles (All the material required shall be arranged by the contractor for errection and commissioning of distribution boxes except distribution box).
4
-
-
... More
Dismentaling of old & damaged 11 VCB as per norms complete in all respect
2
-
-
... More
Erection/Installation of following 11 KV Panel (VCB) in control room and cable joint of the panel to pole including earthing, grouting of Anchor bolt of Panel and making/repairing of pocket for cable to insert in panel from trench and fixing, taping of bus bar with wiring for PT. AC, DC connection including providing of AC & DC Supply.
2
-
-
... More
Pipe Earthing of 11 KV VCB (By boring of 4 inch diameter 20 m deep, 40 mm diameter A Class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE).
2
-
-
... More
Dismentaling of following Transformer as per norms complete in all respect
-
-
-
... More
11/0.4 KV 25 KVA T/F
3
-
-
... More
11/0.4 KV 63 KVA T/F
1
-
-
... More
11/0.4 KV 100 KVA T/F
1
-
-
... More
Construction of 250 KVA T/F plinth (2x2x1.15 M) for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per UPPCL Norms.
1
-
-
... More
Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
1
-
-
... More
Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A Class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE).
2
-
-
... More
Mounting of following T/F,s as per norms complete in all respect -
-
-
-
... More
11/0.4 KV 63 KVA T/F
3
-
-
... More
11/0.4 KV 100 KVA T/F
1
-
-
... More
11/0.4 KV 250 KVA T/F
1
-
-
... More
Erraction/Fixing of 11 KV Fuse Set as per UPPCL Norms). complete in all respect as per
4
-
-
... More
Safe back carriage of Following item (if any) from work site to Store Center, Nawada, Budaun approx distance upto 0-70 Km including loading & unloading.
-
-
-
... More
11 KV VCB O/D Damage
2
-
-
... More
100 KVA T/F
1
-
-
... More
63 KVA T/F
1
-
-
... More
25 KVA T/F
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements