If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Eprocure
Opening Date6 Nov 2024
Closing Date12 Nov 2024
Tender Amount₹ 14,09,880
Costs
EMD
₹ 15,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
42/se/ewc/ayo/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_971109_1Bid Award Id
ViewTender No
42/SE/EWC/AYO/2024-25Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M.S. Angle 65x65x6 mm Bracing, 4300 mm
6
-
-
33 KV Lightening Arrestor
6
-
-
GI Wire 6 SWG
8
-
-
33 KV Pin Insulator polymer type
18
-
-
ACSR Dog Conductor
0.3
-
-
Line Isolator
2
-
-
33 KV Single T/F control pannel
1
-
-
33 KV VCB 800A, 750 MVA
1
-
-
C.T. O/D 33 KV CTR 400/200/1-1A
3
-
-
Cost of 33 KV 3x300 sq mm XLPE Cable
400
-
-
33 KV Outdoor jointing Kit for 3x300 sq mm XLPE Cable
8
-
-
33 KV S/T Jointing kit 3x300 xlpe cable
2
-
-
M.S. Channel 125x65x6 (for structure )
1215.51
-
-
M.S. Angle 75x75x6 (for structure)
446
-
-
Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Expoure Double pole for 33 KV Line on 11.0 Mtr STP Pole with fitting of necessary clamp & other acessories like 3 No Top channel of 125x65x6 mm size 3200 mm , Bracing angle 1 set., and 9 No. Pin insulator as per norms. (Contractor shall provide all necessary clamps, Nut - Bolts&washer and e-bracket if required etc)
2
-
-
Earthing by way of boring and lowering the "B" class GI pipe of 55 mm dia from ground upto water level not less than 20 mtr. As per standard practice . The G.I pipe which laid down below the railway crossing and C.T, L.A, VCB etc. structure will be connected with G.I strip 50x6. (All material will be supplied by the contractor)
4
-
-
Cable stand Structure
Fabrication & erection of 33 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.)
2
-
-
Stringing, sagging, binding and Jumpering of ACSR Dog conductor. 3 Phase (each phase includes 11.5 km conductor) of 33 KV Line including fixing, mounting of P.G.clamp suitable for Dog Conductor at sectional point. (Contractor shall provide necessary PG clamps etc & quality of conductor include extra 5% of jumerping, sagging, cutting etc)
0.3
-
-
Shifting carefully and installation of 33 KV single/Double / FDR pannel in control room including grouting of above and its proper connection.
1
-
-
Installation of line Isolators
Assembling and installation of line isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
2
-
-
Line solator Structure
Fabrication of line isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075x0.9x0.3 mtr 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc. except steel)
2
-
-
Lightening Arrestor Structure
Fabrication of Lightening Arrestor structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.9 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Plinths of all the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor except steel)
6
-
-
Installation of Lightening Arrestors
Assembling and installation/ mounting of .Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required.
6
-
-
Installation of CTs Installation of CTs of ratio 400/200/1A on the CTs structure. The work includes fabrication for proper fixing if required.
3
-
-
Installation of 33 KV VCB
Installation of 33 KV 750 MVA 800 Amp VCB on 33 KV VCB structure along with earthing by G.I. strip 50x6 mm size with main earthmat of Switchyards complete in all respect including commissioning.
1
-
-
C.T.Structure
Fabrication of C.T structure per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x0.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr X 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure's in proper allingment level and plumb. Both plinths of the structure shall be properly finished with champering of edges etc.(All the material will be supplied by the Contractor except steel)
1
-
-
Plinth for 33KV VCB
Construction of plinth of size 2.0x1.5x0.9 (Mtr) suitable for erection of super structure for 33 Kv VCB including grouting of Anchor bolts in proper allingment and level. Scope of work includes excavation of foundation base concreting in CC 1:6:12 ( cement, fine sand and brick ballast) 1st class brick work in cement mortor of ratio 1:4 CC in Ratio 1:4:8 and RCC work in ratio 1:2:4 ( Cement, coarse sand and stone grit of 20 mm gauge) as per Drawing
1
-
-
Supply and fixing of P.G clamp for dog and connector
15
-
-
Laying & Dressing of 3x300 sq. mm XLPE Cable underground Double Circuit.
Laying of single circuit 3x300 sq .mm XLPE Cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required materials, as 1st class Bricks, Stone slabs and fine sand. Providing 150 mm fine sand cusion beneath, and 150 mm sand cusion above the cable. The cable shall be duly protected by Bricks, sand and stone slab. The inter axial spacing between two cables should be in between 0.25 to 0.04 M. After laying the cable refilling and ramming of the left out soil,closing the trench and leveling.
340
-
-
Installation of Heat Shrinkable Type cable jointing kits of following types/sizes for 33 XLPE Cable.
1
-
-
(a) Fixing of 33 KV 3x300 sq. mm Straight Through joints. (jointing kit supplied by dept.)
2
-
-
(b) Fixing of 33 KV 3x300 sq. mm Outdoor End Terminations (jointing kit supplied by dept.)
8
-
-
High Pressure testing to which 33 KV Line & cable to be stand for duration of 5 minutes after completion of Laying, Stringing, sagging, binding and Jumpering of ACSR Dog conductor. ( Testing equipment will be arranged by the contractor)
4
-
-
Hoisting of 33 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x300 sq mm cable fixing of proper support and its clamping, providing long barral lugs 6 nos and P.G. Clamps & "Y" shape jumpering properly and 02 nos. supporting angle 65X65X6, 2240 mm long and making connection including supply of jumpering cable ,mounting clamps as per RESSPO Norms. (All material will be supplied by the contractor like M.S Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2240 mm and jumpering cable suitable for 33 KV jumper, clamps etc).
4
-
-
Grouting of following structure by digging of pit 1.5 Mtr/1.83 Mtr deep for 9.0 Mtr PCC / 11 Mtr STP respectively, placing stone pad at bottom 450x450 size foundation is provided with help of steel or wooden formers, groutung with 1:4:8 Ratio cement, sand & first class brick ballast 0.268/0.285 cu mtr for 9.0 mtr PCC Pole & 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering.
1
-
-
11 Mtr ST Poles
4
-
-
Supply and fixing of a stone pad of size 300x300x75 mm at PCC/STP Bottom of the pit ( Contractor shall provide all materials)
4
-
-
Fabrication, Erection and grouting of route marker and marking 33 KV line by painting after grooving on the stone. (Contractor shall provide all materials)
5
-
-
Nozeling and grouting of stay (All the civil material and 33 kv G.I stay set 20x1800 , stay clamp will be arranged by the contractor except stay wire)
4
-
-
Fixing of barbed wire on pole
Supply and fixing of barbed wire on the pole above 2750 mm ground level. Barbed wire wrapped for a distance of 0.9 mtr. with a pitch of 13.mm at a height. (All materials supplied by the contractor)
4
-
-
Fixing of Danger board .
Supply and fitting of Danger board of size 250x200x2 mm 3650 mm above ground level with the help of proper size of nuts, Bolts , washers and clamps as per Respo norms. RESPO Drawing No-55 (All materials supplied by the contractor)
4
-
-
Fixing of Number plate .
Supply and fitting of Number plate of size 250x200x2 mm 3650 mm above ground level with the help of proper size of nuts, Bolts , washers and clamps as per Respo norms. RESPO Drawing No-55 (All materials supplied by the contractor)
4
-
-
Earthing of Pole
Earthing of Pole STP/PCC by 6 SWG Wire by providing and fixing of 20 mm dia' earthing rod 2.550 Mtr. long as per norms complete in all respect. (Contractor shall provide all the material Like Earthing rod, Earthing clamps and nut & bolt etc.)
4
-
-
Laying of Double circuit cable through HDD method
Laying of cable and pipe by HDD method . The cable be laid at the depth not less than 1 mtr from the under surface in HDPE pipe (200 mm. dia.) casing.
60
-
-
Providing of G.I Pipe 6" Dia B class pipe for Railway Crossing, Road crossing or any other kind of Underground crossing
20
-
-
Laying of cable & G.I Pipe
Laying of Double circuit 33 KV 3x300 Sq mm XLPE cable and G.I Pipe by HDD method below Railway line, NHAI etc. The cable be laid at the depth of 3 mtr from the under surface in G.I. pipe (200 mm. dia.) casing.
20
-
-
NOC will be granted from Central/ state Electrical safety department.( Final settlement of the payment will be done after providing receipt, agreement and permission paper).
1
-
-
restoring the road as it is before after completion of work
100
-
-
Inspection Pit will be digged as per the direction and supervision of JE/AE/EE.
6
-
-
Painting of poles Painting of poles with one coat of red oxide, two coats of enamel paint ISI mark. (All required material will be supplied by the contractor)