Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date29 Nov 2024
Closing Soon4 Dec 2024
Tender Amount₹ 21,84,000
Costs
EMD
₹ 21,900Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_978466_1Tender No
51/EWSC/LKO/2024-25Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cutting/Opening of top cover plates & lifting of the transformers, draining of its oil & Detanking of core & coil Assembly.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Dismantling of core & coil Assembly and cleaning of core and tank (inside) by using warm old oil and hot air making it dirt free/sludge free.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Reconditioning of L.V leg coils strips including removing of old DPC covering then providing double paper covering and making of LV Leg coils of same size and No. of turns and dimensions as old one.
-
-
-
10 KVA
720
-
-
16 KVA
528
-
-
Making of L.V leg coils from new DPC strips, of same size and No. of turns and dimensions as old one.
-
-
-
10 KVA
1080
-
-
16 KVA
792
-
-
Reconditioning/Making of H.V leg coils from new DPC or SE wire of same size and No. of turns and dimensions as old one.
-
-
-
10 KVA
3600
-
-
16 KVA
2420
-
-
Assembly of core, channel (duly painted by zinc chromatic paint) & coil and fitting of other parts requiring replacements such as press board making supports between adjacent section by insulating spacers & tapping etc.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Shifting and keeping the assembled core& coil etc. in OVEN from the repairing area
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Dragging of transformer tank to washing area and cleaning of rust/dirt etc from outer surface by using caustic soda & water solution.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.
-
-
-
10 KVA
90
-
-
16 KVA
44
-
-
Completely drying & Cleaning of T/F tank (inside and outside) by using hot air/cotton waste/sand paper etc completely and making it ready for painting
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Dragging/shifting out empty tank after painting to assembly area.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Taking out core and coils assembly from the OVEN and shifting to repairing area & again tightening the assembly.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Welding/fixing the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer and filling of oil.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Spray painting of transformer tank from outside with super enamel synthetic Grey paint in two coats after providing primer of red oxide paint
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Punching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Unique number, (II) Capacity (III) Name of workshop (IV) Date of repair
-
-
-
10 KVA
450
-
-
16 KVA
220
-
-
Part-B REPAIRING OF ROUND BODY SINGLE PHASE 10 KVA TO 16 KVA DAMAGED T/F AT BUDAUN WORKSHOP
-
-
-
Handling and Dragging of damaged Transformer from stacking yard to repairing hall with accessories
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Cutting/Opening of top cover plates & fittings of the transformers, draining of its oil & Detanking of core & coil Assembly.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Dismantling of core & coil Assembly and its cleaning.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Dismantling of Shell Core and coil assembly. Removing of HV and LV Leg coils for assessing its reuse, reuse of major insulating material if possible, checking and recording of physical dimensions of coil.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Making of complete HV & LV leg Alu. Leg coils identical to original one with same number of turns, weight etc providing super enameled/DPC conductor/Strip confirming to IS 1971 153 in place of old and damage coil. Alu. coil, wire strip will be provided by the department. All coil assembly of identical voltage shall be interchangeable without requiring any special equipment. Shell Coil shall be supported between adjacent sections by insulations (flick Paper) Paper, spacers, beamers and other insulations. Rewinding shall be arranged to ensure free circulation of oil to reduced hot spots in winding. The insulation of coil shall be treated with suitable insulating, varnish or equivalent compound to develop the full electrical strength of.
-
-
-
10 KVA
3240
-
-
16 KVA
1960
-
-
Assembly of Shell core (Three Limbs) coils and fitting of top and other parts. Replacement of insulation such as press board, craft paper, making support between adjacent section by insulating spacers and wrapping etc. shifting of repaired core coil assembly and placement inside the oven for proper dry out.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Shifting and keeping the assembled core& coil etc. in OVEN from the repairing hall
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Dragging of transformers tank from the repairing hall to washing area and its complete washing, cleaning, removing of rust and carbon etc.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.
-
-
-
10 KVA
54
-
-
16 KVA
28
-
-
Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Dragging/shifting out completely dried empty tank after painting to repairing hall.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Taking out core and coils assembly from the OVEN and shifting to repairing hall.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Welding/Tightening the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer and filling of oil.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Spray painting of transformer tank from outside with supper enamel synthetic Grey paint in two coats after providing primer of red oxide paints.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Punching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Job number, (II) Capacity (III) Name of workshop (IV) Date of repair
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Package rate per transformer of supply item to be provided by the Contractor for repairing of transformer. Details of supply items are annexed hereto.
-
-
-
10 KVA
270
-
-
16 KVA
140
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%