Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Civil And Construction
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date16 Mar 2024
Closing Date5 Apr 2024
Tender Amount₹ 42,36,000
Costs
EMD
₹ 42,360Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_918009_1Bid Award Id
ViewTender No
115/EDCB/2023-24Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
AB Cable 3x50 sqmm
13775
-
-
AB Cable 3x120 sqmm
235
-
-
11/0.4 KV 3 Phase 250 KVA T/F
26
-
-
11/0.4 KV 3 Phase 100 KVA T/F
1
-
-
11/0.4 KV 3 Phase 63 KVA T/F
6
-
-
11/0.4 KV 3 Phase 25 KVA T/F
34
-
-
LT Cable 1x120 sqmm
224
-
-
LT Cable 1x240 sqmm
980
-
-
LT Cable 3.5x70 sqmm
340
-
-
Other Line material i.e., 33 KV & 11 KV pin insulater/stay/earthing complete/Disc Fitting/Disc Insulators/Dropper Channel/Crossing Bracing/ Top Channel/Binding Wire/Danger Board/Barbed Wire/numberplate/stone pad/Control Cable etc
124
-
-
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect
26
-
-
Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
26
-
-
Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE)
44
-
-
Dismentaling of 100 KVA Transformer as per norms complete in all respect
21
-
-
Dismentaling of 160 KVA Transformer as per norms complete in all respect
1
-
-
Dismentaling of 16 KVA Transformer as per norms complete in all respect
9
-
-
Dismentaling of 10 KVA Transformer as per norms complete in all respect
20
-
-
Mounting of 250 KVA T/F Transformers as per norms complete in all respect -
26
-
-
Mounting of 100 KVA T/F Transformers as per norms complete in all respect -
1
-
-
Mounting of 63 KVA T/F Transformers as per norms complete in all respect -
6
-
-
Mounting of 25 KVA T/F Transformers as per norms complete in all respect -
34
-
-
Installation of 11 KV Fuse set unit to be installed on midway of 11 KV Double Pole Structure Complete in all respect
453
-
-
Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
-
-
-
PCC Pole 8.5 Mtr (Single)
124
-
-
PCC Pole 8.5 Mtr (Double)
45
-
-
Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
-
-
-
PCC Pole 8.5 Mtr (Single)
61
-
-
PCC Pole 8.5 Mtr (Double)
31
-
-
Laying of LT Cable 1x120 sq mm complete in all respect
224
-
-
Laying of LT Cable 1x240 sq mm complete in all respect
980
-
-
Laying of LT Cable 3.5x70 sq mm complete in all respect
340
-
-
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
137
-
-
Laying, Stringing & Sagging of Following Conductor complete in all respect
-
-
-
ACSR Weasal Conductor
6.2
-
-
AB Cable 3x50 sqmm
13.78
-
-
AB Cable 3x120 sqmm
0.24
-
-
The work of digging of pits, erection of Stay Clamp, Insulator etc.
124
-
-
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
124
-
-
Fixing of 3 Pahse Distribution Box complete in all respect
51
-
-
Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost)
-
-
-
Stone Pad 300x300x75 mm
210
-
-
Danger Board With Clamp
47
-
-
Barbed Wire
93
-
-
Aluminium Lug 70 sqmm with Nut&Bolt
516
-
-
Aluminium Lug 120 sqmm with Nut&Bolt
28
-
-
Aluminium Lug 150 sqmm with Nut&Bolt
44
-
-
Aluminium Lug 240 sqmm with Nut&Bolt
104
-
-
Tailless Unit 600 Amp
26
-
-
Holding Clamp for S/s
411
-
-
Holding Clamp for LT T-Off
29
-
-
Distribution Box Clamp
36
-
-
Stay Clamp
29
-
-
LT Clamp with Nut & Bolt
158
-
-
Stay Insulator
29
-
-
PG Clamp
88
-
-
Piercing Connector
181
-
-
LT Shackle Insulator
163
-
-
Cost of Nut & Bolt for Shackle Insulator
46.5
-
-
Earthwire Clamp
83
-
-
LT T-Off
16
-
-
X Arm Holding Clamp
27
-
-
F Clamp With Nut & Bolt
27
-
-
Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 85 Km including loading & unloading.
-
-
-
11/0.4 KV 3 Phase 100 KVA T/F
21
-
-
11/0.4 KV 3 Phase 160 KVA T/F
1
-
-
11/0.4 KV 3 Phase 16 KVA T/F
9
-
-
11/0.4 KV 3 Phase 10 KVA T/F
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements