Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Eprocure
Opening Date15 Aug 2024
Closing DateCancelled
Tender Amount₹ 7,44,000
Costs
EMD
₹ 7,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_946341_1Tender No
13/SE/EWC/AYO/2024-25Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
33 KV bus Isolator
1
-
-
Double T/F control panel
1
-
-
90 lbs rail PCs for T/F (44.64 kg/m)
6.92
-
-
11 KV 3 Core Cable 3x300 mm XLPE
200
-
-
11 KV cable jointing kit indoor 3x300 sq.mm. XLPE
2
-
-
11 KV cable jointing kit outdoor 3x300 sq.mm. XLPE
2
-
-
24 Volt Battery Bank & Battery charger with cabinet
1
-
-
ACSR Dog Conductor
0.05
-
-
M.S. Channel 125x65 (for Structures)
180
-
-
M.S. Angle 75x75x6 (for Structures)
32.01
-
-
Opening of all the 33 KV Jumpers, Neutral connections, cable connections, opening of earth strips and then shifting of 5 MVA T/F from plinth to Other side in yard.
1
-
-
Shifting 33 KV Jumpers, from actual position to the new shifted place along with 11 KV cable and other accessories and ensure shifted 05 MVA T/F must be at temporary plinth and energised with full protection system (Activate WTI,OTI,E/F,O/C,Buchole etc ) in the presence of supervise division representative. Test report/certificate that 05 MVA T/F is energised with protection system will be provided to JE (W) afterwards maintain and restore the s/s supply.
1
-
-
Plinth of 10 MVA, 33/11 KV T/Fs constructions Plinth of size 3.46x3.46 Mtr for 10 MVA T/F having 0.4 Mtr above ground level. The work includes Excavation of foundation, Base concreting in C.C. 1:6:12 ratio ( cement,fine sand and Brick ballast) 1ST Class bricks work in cement mortar of ratio 1:4 foundation, C.C. in 1:4:8 ratio( cement, fine sand and brick ballast) and RCC working ratio 1:2:4 ( cement, coarse sand and stone grit of 20 mm gauge) using MS Bars of 10 mm Dia (Tor) in reinforcement including its cutting, bending and binding in required shape. The work also includes laying of 2 Nos. 3.46 mts long each rail pieces complete with cutting, welding and proper fitting etc. The plinth will be made as per Drawing and shall be plastered/ finished on Top and Side of the plinth. (All the material will be supplied by the Contractor except rail Piece)
1
-
-
H.T. Cable Laying
Laying & dressing of 11 KV, 3x300LPE cable underground from 10 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor)
160
-
-
Erection and Installation of 33/11 KV 10 MVA Transformer
Dragging of 33/11KV 10 MVA T/F from Dump site to road site and shifting of the T/F from road site to new constructed plinth distance about 150mtr ,along with loading, unloading and carriage, fixing and fitting of all the accessiories and filling of T/F oil to the desired level and insuring that there is no leakage. Erection and installation of 33/11 Kv, 10 MVA Transformer in a leveled position on the plinth.
1
-
-
Installation of Post Insulator Installation of post insulator on the post insulator structure . The work includes fabrication for proper fixing if required.
9
-
-
Installation of Lightening Arrestors
Assembling and installation/ mounting of Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required.
3
-
-
Installation of Bus Isolators Assembling and installation of Bus isolator on the Isolator structure , adjusting of opening mechanism in proper alignment and grising and oiling so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
1
-
-
Installation of Heat Shrinkable Type cable jointing kits indoor and O/D end Termination and S/T Joint suitable for 11 KV 3x300 XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
4
-
-
Cable stand Structure
Fabrication & erection of 11 KV Cable Stand made of 02 No. M.S chanel 125x65x6 mm 3 Mtr. Jointed to each other by M.S Channel horizontally and also jointed to each other by means of 05 No. M.S Strip (m.s flat) 50x6 mm of size 200 mm long each by welding at actual distance interval as per norms. And grouting in block of 300x300x700 completely providing 02 no. cable clamps also and eathing by G.I strip 50x6 mm size with the earth mat of switchyard both side of legs and provideing clamps , post/ pin insulator for holding cable. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.)
1
-
-
Neutral stand
Fabrication and grouting of M.S Channel 125x65 mm L shape & in proper size and allignment to provide support for the two separate earthing strips for pwer T/F neutral including supply & fixing of two No.Flexible copper bonds for neutral earthing. (All the materials will be arranged by the contractor such that clamps nut bolts and civil materials except M.S channel.)
1
-
-
Supply & Laying of 6x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor)
200
-
-
Supply & Laying of 2x2.5 sq.mm. armoured. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor)
300
-
-
Supply & Laying of 4x2.5 sq.mm. armourd control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor)
200
-
-
Special Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor)
2
-
-
delta type Earthing of Power T/F Neutral delta boring type Earthing by way of 3 nos boring and lowering of "B" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level , and it will be connected to the G.I. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor)
1
-
-
Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor)
33
-
-
Painting of All switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect.
1
-
-
Installation of 24 Volt Battery(210 AH) & Battery charger with cabinet. With its proper connection. (cabinet will be supplied by contractor)
1
-
-
33 KV Bay Bus Bar & Stringing.
Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor/panther including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor except dog conductor)
1
-
-
Shifting carefully and installation of Single/double Transformer Control pannel in control room and earthing of pannel on side and do proper connection.
1
-
-
Commissioning of 10 MVA T/F and its eqipments installed in switchyards and 11 KV Incoming and Outgoing Pannels complete in all respect upto energising
1
-
-
Supply and fixing of P.G clamp for dog and connector
15
-
-
Providing of Rubber matting one side chequered and other side plane size1800x900x12 mm
2
-
-
providing of Hand gloves As per IS 4770 and tested potential 33 Kv.
1
-
-