Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Electrical and Electronics
Eprocure
Opening Date29 Nov 2024
Closing Date13 Dec 2024
Tender Amount₹ 5,750
Costs
EMD
₹ 5,750Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_978150_1Tender No
T-55/EUDCB/2024-25Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
11 KV XLPE cable (3X70 sqmm)
95
-
-
Cable Jointing Kit(3X70 sqmm) I/D, O/D
2
-
-
25 KVA New T/F
1
-
-
ACSR Weasal Conductor
50
-
-
Top Channel
4
-
-
11 KV Pin Insulator with Pin
12
-
-
M.S Erathing Rod
1
-
-
G.I. Wire (10 SWG)
14
-
-
Erection Work
-
-
-
Erection of PCC D/ Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete
1
-
-
Mounting of 25 KVA T/F on Newly erected D/pole alongwith making all connections.
1
-
-
Earthing of 25 KVA T/F water level neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
1
-
-
Under ground Laying of 11 KV XLPE cable (3X70 sqmm)
60
-
-
Filling 11 KV Cable Jointing Kits O/D (3x70sqmm)
2
-
-
Hoisting of 35 meter 11 KV XLPE Cable (3x70 Sqmm) on double pole boat including the jumpering complete with clamps , nut and bolts.
1
-
-
Erthing of ST Poles by MS Earhing Rod.
1
-
-
Laying of ACSR Weasal Conductor
50
-
-
Fixing 11 KV Pin Insulator With Pin
12
-
-
Fixing of Top Channel .
4
-
-
Supply & Fixing of Clamps with Nut & Bolts
7
-
-
Supply & Fixing of Stone Pad .
2
-
-
For the work of Shifting of 250 KVA T/F of m/S Arjun Kr. Agarwal,near Gupta Nursary, Bareilly Full deposited fund-2024-25 under EUDD-II, Bareilly..
-
-
-
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
-
-
-
ST Pole (11 Mtr. Long)
3
-
-
AB cable (3X120 sqmm)
50
-
-
Top Channel
6
-
-
T-Off Channel
2
-
-
11 KV Pin Insulator with Pin
21
-
-
M.S Erathing Rod
4
-
-
11 KV Disc Insulator with Fiffting
6
-
-
Erection Work
-
-
-
Erection of ST D/ Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete
1
-
-
Erection of ST Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete
1
-
-
Laying of AB cable (3X120 sqmm)
50
-
-
Construction of plinth complete (2.0m*2.0m*1.5m) by providing first class bricks as per RESPO norms (Material will be supplied by contractor)
1
-
-
Work of fabrication /construction and grouting of wire mesh fencing of 16 mtr running length/as per site requirement in rectangular shape height 2 mtr with angle size of 50*50*5 mm including gate at one side as per RESPO norms (Material will be supplied by contractor)
1
-
-
Dismentling of Exisiting 250 KVA T/F alongwith all accessroies .
1
-
-
Installtion of 250 KVA T/F of Newly Constructed Plinth along with making all connecions
1
-
-
Erthing of ST Poles by MS Earhing Rod.
3
-
-
Earthing of 250 KVA T/F water level Body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
4
-
-
Fixing 11 KV Pin Insulator With Pin
21
-
-
Fixing of Top Channel .
6
-
-
Fixing of T-off Channel
2
-
-
Fixing of 11 KV Disc Insulator with Fiffting
6
-
-
Supply & Fixing of Suspention Clamps
4
-
-
Supply & Fixing of Dead End Clamps
2
-
-
Supply & Fixing of Clapms with nut & Bolts .
10
-
-
Supply & Fixing of Tail Less Unit (500 Am,p.)
1
-
-
Supply & Fixing of Al. Lug (400 Sqmm.)
16
-
-
Supply & Fixing of Barbed Wire
1
-
-
Supply & Fixing of Stone Pad .
3
-
-
Supply & Fixing of Danger Board
2
-
-
For the work of Giving New Coonction ogf 02 KW (LMV-1) of Mr. Ajay Simngh Yadav, near Krishna Countary Apartment , Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
-
-
-
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
-
-
-
ST Pole (11 Mtr. Long)
2
-
-
PCC Pole (8.5 Mtr Long)
3
-
-
New 25 KVA T/F
1
-
-
M.S Erathing Rod
1
-
-
AB cable (3X50 sq,mm)
70
-
-
11 KV Disc Insulator with Fiffting
3
-
-
11 KV Pin Insulator with Pin
12
-
-
03 Phae Distribution Box
1
-
-
Erection Work
-
-
-
Erection of ST.D/ Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
1
-
-
Erection of PCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
3
-
-
Laying of AB cable (3x50 sqmm)
70
-
-
Mounting of 25 KVA T/F on Newly erected D/pole alongwith making all connections.
1
-
-
Earthing of 25 KVA T/F water level neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
1
-
-
Erthing of ST Poles by MS Earhing Rod.
1
-
-
Fixing of 11 KV Disc Insulator with Fiffting
3
-
-
Fixing 11 KV Pin Insulator with Pin
12
-
-
Fixing of 03 Phae Distribution Box making all connections .
1
-
-
Supply & Fixing of Clapms with nut & Bolts .
6
-
-
Supply & Fixing of Suspention Clamps
3
-
-
Supply & Fixing of Dead End Clamps
2
-
-
For giving new Electric Connection to Mr. Gajendra Bhaskar , at Math Laxmipur Road, Bareilly under under Full deposited fund-2024-25 under EUDD-II, Bareilly
-
-
-
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
-
-
-
AB cable (3X120sqmm)
40
-
-
03 Phae Distribution Box
1
-
-
PCC Pole (8.5 Mtr Long)
3
-
-
New 25 KVA T/F
1
-
-
Top Channel
4
-
-
11 KV Pin Insulator with Pin
12
-
-
M.S Erathing Rod
2
-
-
11 KV Disc Insulator with Fiffting
6
-
-
Erection Work
-
-
-
Erection of PCC D/ Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
1
-
-
Erection of PCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
1
-
-
Mounting of 25 KVA T/F on Newly erected D/pole alongwith making all connections.
1
-
-
Earthing of 25 KVA T/F water level neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
1
-
-
Erthing of PCC Poles by MS Earhing Rod.
2
-
-
Laying of AB Cable (3X120 sqmm)
40
-
-
Fixing of 03 Phae Distribution Box making all connections .
1
-
-
Fixing of Top Channel
4
-
-
Fixing of 11 KV Pin Insulator with Pin
12
-
-
Fixing of 11 KV Disc Insulator with Fiffting
6
-
-
Supply & Fixing of Clapms with nut & Bolts .
4
-
-
Supply & Fixing of Suspention Clamps
1
-
-
For giving new Electric Connection(28 KVA )(LMV-6) to M/S Avon Enterprises, at Bandiya Road ,Parsakhera , Bareilly under under Full deposited fund-2024-25 under EUDD-II, Bareilly
-
-
-
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
-
-
-
ST Pole (11 Mtr. Long)
5
-
-
ACSR Weasal Conductor
180
-
-
New 63 KVA T/F
1
-
-
11 KV XLPE Cable (3X70 sqmm)
60
-
-
Cable Jointing Kits (3X70 sqmm) O/D
2
-
-
11 KV Cross Arm (V Type )
3
-
-
Top Channel
2
-
-
11 KV Pin Insulator with Pin
18
-
-
S/ s Base Angle
2
-
-
M.S Erathing Rod
3
-
-
T-Off Channel
2
-
-
Stay Set Complete
1
-
-
11 KV Disc Insulator With Fitting
6
-
-
Erection Work
-
-
-
Erection of ST D/ Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
1
-
-
Erection of ST Pole(11 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete.
3
-
-
Laying of U/G 11 KV XLPE Cable (3X70 sqmm).
30
-
-
Hoisting of 30 meter 11 KV XLPE Cable (3x70 Sqmm) on double pole boat including the jumpering complete with clamps , nut and bolts
1
-
-
Filling 11 KV Cable Jointing Kits O/D (3x70sqmm)
2
-
-
Erthing of PCC Poles by MS Earhing Rod.
3
-
-
Laying of ACSR Weasal Conductor
180
-
-
Mounting of 63 KVA T/F on Newly erected D/pole alongwith making all connections.
1
-
-
Earthing of 63 KVA T/F water level Body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
2
-
-
Fixing of Top Channel
2
-
-
Fixing of 11 KV Pin Insulator with Pin
18
-
-
Fixing of S/ s Base Angle
2
-
-
Fixing of T-Off Channel
2
-
-
Fixing of Stay Set Complete
1
-
-
Fixing of 11 KV Disc Insulator With Fitting
6
-
-
Fixing of 11 KV Cross Arm (V Type )
3
-
-
Supply & Fixing of Clamps with nut & Bolts .
4
-
-
Supply & Fixing of Cross arm holding Clamps
3
-
-
Supply & Fixing of Stone Pad .
5
-
-
For the work of Shiting of LT Line of Mr. Amber Gangwar at math Laxmipur ,Bareilly under under Full deposited fund-2024-25 under EUDD-II, Bareilly
-
-
-
Safe Carriage of following materials from E.S.CS store C.B Ganj to work sites including loading & unloading .
-
-
-
PCC Pole (8.5 Mtr. Long)
1
-
-
AB Cable (3X50 sqmm)
20
-
-
11 KV Pin
1
-
-
Erection Work
-
-
-
Erection of PCC Pole(8.5 Mtr. Long) including digging of pit & grouting work complete and fitting of all accessories complete
1
-
-
Laying of AB cable (3X50 sqmm)
20
-
-
Fixing of 11 KV Pin
1
-
-
Supply & Fixing of Suspension Clamps
1
-
-
Supply & Fixing of Dead End Clamps
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%