Madhyanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date19 Dec 2024
Closing Soon28 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

68/edc(h)/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
11 KV XLPE cable of size 3x70 sq.mm.

400

-

-

... More
11 KV XLPE cable of size (3X120, 3x185, 3X300 sqmm)

400

-

-

... More
LT XLPE Cable Aluminum 3.5×240mm2

200

-

-

... More
LT XLPE Cable Aluminum 3.5×400mm2

200

-

-

... More
LT XLPE Cable Aluminum 1×240mm2

200

-

-

... More
LT XLPE Cable Aluminum 1×400mm2

200

-

-

... More
G.I Wire

210

-

-

... More
Stay Set Complete

70

-

-

... More
33, 11 KV Pin with Net

240

-

-

... More
Disc insulator With fitting (B&S) 70KN

138

-

-

... More
MS Earthing Rod (2540x20 mm) With Fitting

70

-

-

... More
11 KV Indoor Metering cubicle

5

-

-

... More
11/0.4 KV T/F 250/400/630 KVA

2

-

-

... More
11/0.4 KV T/F 100 KVA

2

-

-

... More
11/0.4 KV T/F 63 KVA

5

-

-

... More
11/0.4 KV T/F 25/16/10 KVA

10

-

-

... More
11 KV outdoor, pole mounted CT/PT. unit.

5

-

-

... More
ACSR Weasel Conductor

5000

-

-

... More
Dog/Rabbit conductor

1000

-

-

... More
ABC (1X16+1X25)Sqmm

2000

-

-

... More
ABC (3X50+1X35+1X16)Sqmm

1000

-

-

... More
ABC (3X95+1X70+1X16 Sqmm)

200

-

-

... More
ABC (3X120+1X95+1X16 Sqmm)

100

-

-

... More
Line Meterial

8

-

-

... More
Cable box (3X70/3X120/3X185/3X300) Indoor & Outdoor

20

-

-

-

-

-

... More
Erection of PCC 8.5 mtr long dingle pole with Grouting & with all accessories

55

-

-

... More
Erection of PCC 8.5 mtr long double pole with Grouting & with all accessories

15

-

-

... More
Erection of STP 11 mtr long single pole with Grouting & with all accessories

25

-

-

... More
Erection of STP 11 mtr long double pole with Grouting & with all accessories

8

-

-

... More
Fabrication & Erection of cable stand made of two nos MS Channel 100x50x3 mtr. Long jointed to each other by means of 5nos MS Strip 50x6mm of size 150mm long each by welding at equal distance interval as per norms and grouting in block of 300x300x700 completely providing two nos cable clamps also. all the materials i.e. clamps nut bolts will provide by contractor.

15

-

-

... More
Grouting and Nozzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor.

70

-

-

... More
Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor.

70

-

-

... More
Complete jumpering with help of GI pipe as per RESPO norms GI pipe and other required material shall be supplied by contractor.

35

-

-

... More
Laying of 11KV 3x70 sqmm single XLPE cable by digging of trench size 500 mm wide 900 mm after laying of brick, sand and stone slab.

400

-

-

... More
Laying of 11KV (3X120, 3X185, 3X300 sqmm) single XLPE cable by digging of trench size 500 mm wide 900 mm after laying of brick, sand and stone slab.

400

-

-

... More
Stringing & Sagging of LT XLPE Cable Aluminum 1×400mm2

200

-

-

... More
Stringing & Sagging of LT XLPE Cable Aluminum 3.5×400mm2

200

-

-

... More
Stringing & Sagging of LT XLPE cable (1×240)sq.mm.

200

-

-

... More
Stringing & Sagging of LT XLPE cable (3.5×240)sq.mm.

200

-

-

... More
Installation of 11 KV CT/PT double metering unit of constructed double pole structure as per RESPO norms. Only 11 KV CT/PT unit shall be supplied by department.

5

-

-

... More
Fixing & commissioning of 11 KV pilfer Resistance meter (25/5Amp.) All material except pilfer Resistance metering cubical shall be supplied by the contractor.

5

-

-

... More
Earthling by way of Boring and lowering the "B" class GI pipe (Gindal ) of 50mm dia from ground upto water level not less than 20mtr as per standard practice

2

-

-

... More
Construction of T/F plinth of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor).

2

-

-

... More
Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 100/250/400/630 KVA T/Fs of T/F Plinth and including jumpering with the system ( All the required martial for above job shall be provided by contractor except T/Fs)

2

-

-

... More
Fabrication erection & commissioning of 100 KVA T/F on Double pole with all accessories. All material except 100 KVA T/F shall be supplied by the contractor.

2

-

-

... More
Fabrication erection & commissioning of 63 KVA T/F on Double pole with all accessories. All material except 63 KVA T/F shall be supplied by the contractor.

5

-

-

... More
Fabrication erection and commissioning of 25/16/10 KVA T/F on double/single pole with all accessories. All material except 25/16/10 KVA T/F shall be supplied by the contractor.

10

-

-

... More
Stringing & Sagging of three phase 11 kv line

4500

-

-

... More
Stringing & Sagging of ACSR Dog/Rabbit Conductor 33 KV Line

1000

-

-

... More
Stringing & Sagging ABC (1X16+1X25)Sqmm

2000

-

-

... More
Stringing & Sagging ABC (3X50+1X35+1X16)Sqmm

1000

-

-

... More
Stringing & Sagging ABC (3X95+1X70+1X16 Sqmm)

200

-

-

... More
Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm)

100

-

-

... More
Installation & commissioning of Distribution Box for ABC Bunch Conductor

50

-

-

... More
Construction of toe wall around the 11/0.4 kv S/S, fuse unit size 0.75 Mt. At Base and 0.23 Mt. At top as per RESSPO Norms by lst class bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4.& fabrication of fencing with wire mesh 10SWG(37mmx50mm)(all material to be arranged by contractor).

32

-

-

... More
Instalation of cable box 11 KV Indoor & Outdoor

20

-

-

... More
Installation of 33KV 3X120, 3x300 sq mm Out door End Terminations( Provided by department)

2

-

-

... More
Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site (Approx 3 Km).

130

-

-

... More
Dismantling of old & used (Existing) material and loading, Carriage & unloading from site to JE Dump store / store centre, Hardoi.

-

-

-

... More
Dismentling of line (Scrap conductor)

5

-

-

... More
PCC 8.5 mtr long single pole with all accessories

8

-

-

... More
PCC 8.5 mtr long double pole with all accessories

3

-

-

... More
STP 11 mtr long single pole with all accessories

8

-

-

... More
STP 11 mtr long double pole with all accessories

3

-

-

... More
TRANSFORMER 250/400/630, KVA

2

-

-

... More
100 KVA T/F on Double pole with all accessories.

2

-

-

... More
63/25 KVA T/F on Double pole with all accessories.

2

-

-

... More
Carriage of material pit site to Hardoi store Je dump store/store center of Hardoi.

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.