Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date1 Oct 2024
Closing Date9 Oct 2024
Tender Amount₹ 5,00,000
Costs
EMD
₹ 5,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_961541_1Bid Award Id
ViewTender No
71/E.D.C./Unnao/2024-25Tender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Erection of new PCC/ST Pole fitting of X-Arms, brackets insulators and other hardware fittings.
15
-
-
Erection of Double Pole Strecture including digging of pit and fitting of all accessories complete .
2
-
-
Placement of 11/0.433 KV T/F on Duble Pole and Installation cable termenation and commissioning Distribution Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required.
2
-
-
Dismantling re-usable Old Pole from site to site and their errection and fitting of X-Arms, brackets insulators and other hardware fittings etc.
15
-
-
Dismentalling/ Laying / Reparieng of Aearial Bunched Cable from L.T.O/H line (to be replaced/damaged)
150
-
-
Digging of cable trunch aprox 1200x1200 mm by JCB/kachha road/pakka road for sutable size for damaged cable joyents/ new cable laying
50
-
-
Cable hosting /Making of cable box for 11 KV / 33 KV out door cable jointing kit/cable box.
4
-
-
Opening and reconnection of consumer connections for shifting or replacement of pole.
50
-
-
Re-sagging of conductor, on old line after erection/repair of pole, binding of conductor etc.
50
-
-
Opening of H.T. / LT Jumpers/ Re-Jumpering from the exiting H.T.O.H./ L.T. O.H. line for erection work.
20
-
-
Replacement and Installation testing and commissioning New/old 11 KV / 33KV CT/PT unit and all related work
2
-
-
Opning the Connection of Distribution Transformer and shifting beside and starting the tamporary Transformer while keeping shafty in mind.Dismantling the old damaged Distribution Transformer plinth macking new transformer plinth same place as per norms as per side condition and Re-shifting of T/F on new Plinth macking all connection / cable termenation and proper earthing T/F body and netrual.
1
-
-
New Earthing for Transformers LV side neutral and one for body of transformer 40 ft.deep GI pipe of size 50 mm. making connections to transformer neutral/body by GI strip of size 35X5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
1
-
-
A.-General checking and preventive maintenanance of 33 KV/ 11 KV switchgear and Power Ttansformer .B.-In case if any fault occurs shall be attendby highly technically qualified and experienced staff within three hours after information to the contractor. C.- If required any spare of 33and 11 KV Switchgear/ Power Transformer provid by department and required joot, oil, greece availablity by the contractor for the overhauling trali and busbar and other.
2
-
-
Supply and Fixing Holding clamps for PCC/STP with Nuts & Bolts.
10
-
-
Supply and Fixing Stay clamps for PCC/STP with Nuts & Bolts.
6
-
-
Supply and Fixing F Clamps clamps for PCC/STP with Nuts & Bolts.
10
-
-
Excavation of foundation and taken out the damaged pole/pole to be shifted from the ground.Repairing of rotted bottom of STP by welding MS sheet /3 nos, MS angles of size 45X45X6 MM 750 MM long as per site condition.
5
-
-
Grouting of pole with cement brick ballast and coarse sand as per standard specifications.
15
-
-
Fabrication/ Modifications of MS Items/Nuts & Bolts as per requirement of site conditions.
15
-
-
Fixing of Stay Rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
2
-
-
Choping of tree branches lying in the route of exiting line touching the tree branches to the phase line conductor as per requirement of site.
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements