Madhyanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Madhyanchal Vidyut Vitran Nigam Limited - MVVNL Tender
Eprocure
Opening Date18 Jun 2024
Closing Date24 Jun 2024
Tender Amount₹ 7,74,000
Costs
EMD
₹ 7,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MVVNL_929653_1Bid Award Id
ViewTender No
14/2024-25/EDC BARABANKITender Authority
Madhyanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://www.mvvnl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
ACSR Weasal Conductor.
8
-
-
3-Ø T/F 16/25/63 KVA (Vide P-2 of RESSPO Cost Schedule 2018-19)
10
-
-
Outdoor 33 or 11 KV CT/PT compact unit.
2
-
-
Loose line and other miscellaneous Line materials.
18
-
-
AB cable Single Phase.
2
-
-
AB cable Three Phase.
1
-
-
11 KV XLPE cable 3X70 mm2/3X120 mm2/ 3X185 mm2
50
-
-
Indoor 33 KV and 11 KV Pilfer resistant metering cubical.
2
-
-
Dragging of PCC Pole from Dump Site to pit site.
75
-
-
Dragging of ST Pole 11 mtr. Long from Dump Site to pit site.
8
-
-
Fabrication and Erection of 11 KV Single Pole Support on PCC Pole complete in all respect as per Respo norms. (Vide P-28 of RESSPO Cost Schedule 2018-19)
40
-
-
Fabrication and Erection of LT Single Pole Support on PCC Pole complete in all respect as per RESPO NORMS.
25
-
-
Fabrication and Erection of 11 KV Double Pole Support on PCC Poles complete in all respect as per RESPO NORMS.Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
10
-
-
Fabrication and Erection of Single Pole STP 11 Mtr Support complete in all respect as per RESPO NORMS.
8
-
-
Grouting of PCC/STP using cement with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories as per RESPO Norms, complete in all respect. (Vide P-28 of RESSPO Cost Schedule 2018-19).
83
-
-
Stringing and binding and jumpering of ACSR Conductors for H.T. Lines complete in all respect. Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
5
-
-
Sagging of Single Phase AB Cable for L.T. Lines. as per norm. Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
2
-
-
Sagging of Three Phase AB Cable for L.T. Lines. as per norm. Stay insulator and likewise items which are not available in ESC will be provided by the contractor on his own cost.
1
-
-
Installation and Mounting of 11/0.4 KV 16/25/63 KVA 3-Ø Transformers on double pole structure with the help of HYDRA crane on T/F Base channel including its connection in between 11 KV , providing Crimping type Aluminum lugs of required sizes (All the Material except transformer will be provided by the Contractor) (Vide P-2 of RESSPO Cost Schedule 2018-19)
8
-
-
Neutral grounding (Earthing) of T/F by using pre fabricated earthing kit cantaining 10 fit long, chemical filed metallic cylinder having 50 mm dia. Drilling of bore will be done by the contractor. Earthing will be treated complete after filling 25 KG chemical surrounding the earthing cylinder in side the 10 fit deep bore. All the connections etc, including testing using earth tester will be done by the contractor. There must be earth resistance within accepted limits, failing which payments shall not be made. Earthing work should be complete in all respect.
2
-
-
Earthing of H.T Poles and T/F Body with M.S. Earthing Rod of size 20x2500 mm and 6 SWG Earthing wire etc. as per Specification. (Vide P-28 of RESSPO Cost Schedule 2018-19).
40
-
-
33 KV or 11 KV Cabling work from DP Top to meter Room, ensuring that the whole cable remains visible from out side including jointing box work at both ends, complete in all RESPECTS.
1
-
-
Installation and connection of 33 or 11 KV outdoor CT/PT compact unit on D/P situated outside meter room complete in all RESPECTS.
1
-
-
Guarding of 11 KV or 33 KV road X-ing including material.
3
-
-
Installation and commissioning of indoor 33 KV and 11 KV Pilfer resistant metering cubical including masonary work of plinth, cable trench, proper laying of H.T cable, sealing of entry and exit points of cable in the meter room, fixing of cable jointing boxes at both ends complete in all respect. All the materials except store items will be provided by the contractor.
3
-
-
Providing 6" Dia GI pipe as per reqirment and fixing it at D/P pole base in Order to Raise 11 or 33 KV cable for lifting it up to D/P top. complete in all RESPECTS.
30
-
-
Erection of Stay set as per requirement by digging of pit of size 0.4x0.6x1.6 m. Grouting of stay set in the Ratio of 1:3:6 cement concrete, providing loop insolator, anchor plate as per norm. All the material except store item will be provided by the contractor. (Vide P-30 of RESSPO Cost Schedule 2018-19)
32
-
-
Dismantling of old H.T/ L.T Pole with assesrise etc.
1
-
-
Dismantling of old H.T/ L.T line.
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements