Lucknow Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Lucknow Development Authority - LDA Tender

Works
Civil And Construction
Eprocure
Opening Date10 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 1,42,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil..(DSR No. 2.8.1 )

89.1

18318

205.6

... More
Providing and laying in position cement concrete of specified grade excludingthe cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) .(DAR No. 4.1.8 )

20

107623

5381.15

... More
Class-150 (Non Modular) brick work in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work . Cement mortar 1:4 (1 cement : 4 coarse sand).. .(DAR No.6.1.1)

108.5

631730

5822.4

... More
Providing and laying in posotion cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:2:4 (1 cement : 2 coarse sand {zone-III} : 4 graded stone aggregate 20mm nominal size). .(DAR No.4.1.3)

6.1

37963

6223.6

... More
12 mm cement plaster of mix :. Cement mortar 1:4 (1 cement : 4 coarse sand).. .(DAR No.13.4.1)

693

195564

282.2

... More
Less of materials.

-

-

-

... More
(a) Bricks Class -150

48825

-402806

-8.25

... More
(b)Brick ballast 40mm Gauge

70

-103950

-1485

... More
Road

-

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating eachdeposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.. Including cartage upto 10 km. distance as per directed by E/ISOR-2020-21/SI No-15 Page No-48

3614

929520

257.2

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. For Grading I Material (GSB-I)

380

1442100

3795

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per MORT&H specification-501.6 & 501.7 complete in all respects.

372

1547520

4160

... More
Providing, laying and rolling of open - graded primix surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregated either using penetration grade bitumen of cut back of emulsion to required line, graded and level to serve as wearing course on a previously prepared base, Including mixing in a suitable plant, laying an rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including cost of Tack coat & Seal coat

1895

373315

197

... More
Providing and applying Primer coat with Emulsion on prepared surface of granular base. Including cleanning of road surface and spraying primer @ 0.60 kg./sqm. Using mechanical means. (as per MORTH Specification - 502)

878

16682

19

... More
Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg. per square metres on the prepared bitumenous /granuler surface cleaned with mechanical broom. (as per MORTH Specification - 503)

1756

18789

10.7

... More
Bituminous Macadam (Grade-II) providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average of 75 tonnes per hour, using specified grading, premixed with Bituminous binder@ 3.3% mix to work at site as per MORT&H specification-501.6 & 501.7 complete in all respects. Unit=cum Taking Output = 205 cum (450 tonne)

97

373450

3850

... More
Semi-Dense Bituminous Concrete (Using Waste Plastic) providing and laying Semi-Dense Bituminous Concrete with 100-120 TPH batch type HMP producing ab average of specified grading, premixed with Bituminous binder@ 5.0% mix to work at site as per MORT&H specification-508 complete in all respects. (Reducing Bituminous Quanity by 8% and replacing it by Plastic waste as per IRC: SP: 98-2013) Unit=cum Taking Output = 195 cum (450 tonne)

51

226695

4445

... More
Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. DSR 16.62

97

57297

590.7

... More
Drain & Culvert

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trench or drain (not xceeding 1.5 m in width or 10 sqm on plan) excavated soil and disposal of surplus excavated soil as directed within a lead of 50m including dressing of sides and ramming of bottoms lift up to 1.5m including including getting out the all kinds of soil (SOR No-2.8.1)

688

141452

205.6

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)DSR 4.1.8

109

586545

5381.15

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 5.1.2

222

1586345

7145.7

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete.DSR 5.9.1.

287.5

89038

309.7

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Walls (any thickness) including attached pilasters, butteresses, plinth and stringcourses etc. DSR 5.9.2.

1696.7

1129153

665.5

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not wrought to included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured upto floor two level. as per S.I. No. 504.

21784

1742720

80

... More
Park

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. DSR 2.8.1.

26.5

5448

205.6

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1Cement : 4 coarse sand (zone-III) derived from natural sources : 8 gradedstone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8

3

16143

5381.1

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 5.1.2

19.5

139341

7145.7

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) DSR 5.2.2.

25

214333

8573.32

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not wrought to included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured upto floor two level. as per S.I. No. 504. App.Rate.

4367

349360

80

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete.DSR 5.9.1.

39.5

12233

309.7

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR 5.9.2.

370

246235

665.5

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts and Struts. DSR 5.9.6.

61

46317

759.3

... More
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) DSR 13.44.1

460

42458

92.3

... More
Providing and applying white cement based putty of average thickness 1 mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 13.80.

460

56672

123.2

... More
Sewer Work

-

-

-

... More
Excavation for depth below ground level for laying sewers, manholes, gully pits, chambers, sump etc. in ordinary soil (earth sand, loam and clay) including cutting of joints pits, trimming, dressing, levelling, refiling of trenches in 20 cm layers watering and ramming the same including removal of surplus earth or other dismantled materials upto a distance of 50 m from the centre of trenches.

-

-

-

... More
0.00 - 1.50 m

646

131138

203

... More
1.50 - 3.00 m

60

15060

251

... More
Supply & Laying of Double wall corrugated (DWC) pipes made of PP confirming to IS 16098 P-2 (Make Astral / Rex, Alom, Supreme) For leak proof Joints “Double Wall Corrugated (DWC) Pipe above 150mm ID ( in all the stiffness classes ) , should be supplied with Integral non-detachable socket having a minimum ring stiffness of 4 KN/m2 when tested individually according to Annexure C of IS-16098 Part I. For proper and leak tight jointing, Pipes of 200 & above sizes shall be joined with the help of Jacks only - to be provided by the pipes suppliers . No manual jointing is permitted for 200mm sizes. DWC pipes Manufacturer /or its group company should have at least 3 years’ experience of production of any type/ specification of Double Wall corrugated ( DWC ) pipes. The Elastomeric Rings used must be of ISI mark only. The manufacturer of the pipes should also have valid accreditation for ISO 9001 & ISO 14001.(Technical Requirements / amendments required In line with the Standard – 16098)

-

-

-

... More
250 mm ID Sn8

255

184186

722.3

... More
300 mm ID Sn8

240

260544

1085.6

... More
Construction of 1.00x1.20x1.50 m internal size manhole as per standard dsign and specification of LDA & including 30 cm thick cement concrete 1:4:8 base & channel (with 40 mm stone ballast, coarse sand & cement), brick work one & half brick work thick in 1:4 cement & coarse sand mortar & with neat cement finish including 16 mm dia M.S. bar foot rest embedded with 1:2:4 cement concrete at 23 cm centre to centre and 15 cm thick RCC slab with 1:1.5:3 cement, coarse sand and 2 cm guage stone grit with including Circular Shape 560mm dia Precast R.C.C. Manhole Cover with Frame (EHD-35), floor with 1:2:4 cement concrete all complete as per Engineer in charge of work (height will be measured from invert of pipe to bottom of the slab (analysis rate).

25

866250

34650

... More
Addition/ subtraction Masonry shaft 1.00x 1.20 m size as per slandard design & specification of LDA having one and half B/W in 1:4 cement & coarse sand mortar 12 mm thick cement plaster in 1:4 cement & coarse sand mortar with neat cement finished & including 16 mm dia MS bar foot rest embedded with 1:2:4 cement concrete as 23 cm. centre to centre all complete as per of Engineer in charge of work. (analysis rate)

3.6

53215

14782

... More
Construction of 0.60x0.60x1.50 m internal size connecting chamber as per standard design and specification of LDA & including 15 cm thick cement concrete 1:4:8 base & channel (with 40 mm stone ballast, coarse sand & cement), brick work 23 cm thick brick work thick in 1:4 cement & coarse sand mortar 12 mm thick cement plaster in 1:4 cement & coarse sand mortar & with neat cement finish including 16 mm dia M.S. bar foot rest embedded with 1:2:4 cement concrete at 23 cm centre to centre with including Circular Shape 560mm dia Precast R.C.C. Manhole Cover with Frame (EHD-35), floor with 1:2:4 cement concrete all complete as per of Engineer in charge of work (height will be measured from invert of pipe to bottom of the slab) (analysis rate).

15

201735

13449

... More
Addition/ subtraction Masonry shaft 0.60x 0.60 mtr size as per slandard design & specification of LDA having one brick work in 1:4 cement & coarse sand mortar 12 mm thick cement plaster in 1:4 cement & coarse sand mortar with neat cement finished & including 16 mm dia MS bar foot rest embedded with 1:2:4 cement concrete as 23 cm. centre to centre all complete as per of Engineer in charge of work. (analysis rate)

1

6254

6254

... More
Provide and fix open timbering in (covering 1/3 of surface area by plank) in trenches for the depth upto 3m below grond level consisting of 40mm thick approved country wood planks for polling boards. 125 mm x 75 mm Indian sal wood wallers and 100 mm dia sal ballies for struts at 1.5m percent including removal after laying of sewers.(Both sides of trenches will be taken as one side for the purpose of payments and measurements i.e. area equal to length x depth of trench)Dismantled timbering materials will be the property of the contractor.

-

-

-

... More
0.00-3.00M

205

69700

340

... More
Water Line

-

-

-

... More
Excavation for Pipe Line, ordinary soil (Loan clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 50 m & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 50 m from the foundation trenches. (0.00 to 1.50 m B.G.L.)

369.5

75008

203

... More
Supply & Laying of the following of sizes of AC/ HDPE pipe with all jointing materials confirming to latest relevant IS 1592 & IS 4984:1995 or its latest amendment with coupiers including complete in all respect F.O.R destination including all comlete of the work.

-

-

-

... More
110mm dia HDPE Pipe

390

89700

230

... More
160mm dia HDPE Pipe

75

35512

473.5

... More
Supply for specials for above HDPE pipe @ 5% of Item No- 2

-

-

-

... More
110mm dia HDPE Pipe

7.8

1794

230

... More
160mm dia HDPE Pipe

3.75

1775

473.5

... More
Providing Cast Iron Detachable (C.I.D.) Joints to PVC Pipe/ Asbestos Cement Pressure Pipes and Plain Ended C.I. Specials of the following nominal diameter with Collar, Rubber Ring, Flanges, Bolts and Nuts complete including testing of Joints.

-

-

-

... More
150 mm dia

4

2848

712

... More
Providing and fixing spindle Fire Hydrant with 200 mm outlet complete with components (80 x 65 mm)

1

6870

6870

... More
Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete (The tail pieces, tapers etc. if required wil be paid separately) (150 mm dia)

2

20118

10059

... More
Construction of Sluice Valve (S.V.), Air Valve Chamber (1.00x1.20x1.20m) internal size including excavation of foundation and concrete base with 1:4:8 (cement, coarse sand & 40 mm stone ballast) 15mm thick, M-150 B/W (1:4) cement, coarse sand including plaster 12mm thick 1:4 cement & coarse sand with neat cement finish, RCC cover 15 cm. thick in 1:1.5:3 (cement, coarse sand & 20 mm stone grit) complete in all respect as per LDA specifications.

3

58005

19335



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.