Lucknow Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Lucknow Development Authority - LDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Nov 2022
Closing Date1 Dec 2022
Tender Amount₹ 23,34,439 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Gomti Nagar, Vikrant Khand me Isthit Parijat Apartment me Basement hetu Ramp ko Shift karne ka karya.
Gomti Nagar, Vikrant Khand me Isthit Parijat Apartment me Basement hetu Ramp ko Shift karne ka karya.
Gomti Nagar, Vikrant Khand me Isthit Parijat Apartment me Basement hetu Ramp ko Shift karne ka karya.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Deduct the cost of serviceable material received from demolishing.

22

-

-9595

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (measurements to be taken of the face area timbered). Depth exceeding 1.5 m but not exceeding 3m. PWD SOR 2020-21/2.16.2

60

-

144

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. (UPPWD SOR SI No. 504)

151

-

9595

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level. 1:4:8 (1 Cement : 4 Coarse sand (zone-III) : 8 graded stone aggregate 40 mm (nominal size). PWD SOR 2020/DAR No. 4.1.8

8

-

6099

... More
Providing and laying in position of specified grade of reinforced cement concrete excluding the cost of centering and shuttering, finishing and reinforcement. All work upto plinth level. 1:1.5:3 (1 Cement : 1.5 Coarse sand (zone-III) : 3 graded stone aggregate 20 mm (nominal size). PWD SOR 2020/DAR No. 5.1.2

21

-

7664

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) PWD SOR 2020/DAR No. 5.2.2

55.2

-

8536

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves. chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement. with 1:1.5: 3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). PWD SOR 2020-21/DAR NO. 5.3

19.8

-

8623

... More
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached plasters, butteresses, plinth and string courses etc. PWD SOR 2020/DAR No. 5.9.2

245

-

328

... More
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. PWD SOR 2020/DAR No. 5.9.3

54

-

368

... More
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work (1st quality (Royal sild, Asian/Berger). PWD SOR 2020-21/DAR No. 13.60.1

245

-

106

... More
Shifting of existing steel structure ramp shade.

1

-

50000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.