Lucknow Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Lucknow Development Authority - LDA Tender
Civil And Construction
Eprocure
Opening Date2 Dec 2024
Closing Date9 Dec 2024
Tender Amount₹ 50,70,234
Costs
EMD
₹ 1,01,400Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_LDAUP_979365_1Bid Award Id
ViewTender No
81/E-NIVIDA/C.E./2024-25/17Tender Authority
Lucknow Development Authority ViewPurchaser Address
-Website
http://http://www.ldalucknow.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Gomati Nagar Vistar Yojna sthit gangotri vihar phase 2 me khargapur me gangotri park ki boundrywall ka nirman wa anya vahya vikash karya.
Gomati Nagar Vistar Yojna sthit gangotri vihar phase 2 me khargapur me gangotri park ki boundrywall ka nirman wa anya vahya vikash karya.
Gomati Nagar Vistar Yojna sthit gangotri vihar phase 2 me khargapur me gangotri park ki boundrywall ka nirman wa anya vahya vikash karya.
BOQ Items
... More
Providing and laying in reinforment position cement concrete of specified grade excluding the cost of cantering and shuttering-all work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) (DAR No. 5.1.2 SOR 2020-21)
18.25
7145
130408.84
... More
R.C.C. work with cement approved coarse sand and 2cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in Columns excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of materials, labour and T and P etc. required for proper completion of the work. Bindind wire cost being included in the. (DAR No. 5.2.2 SOR-2020-21)
40
8573
342932.8
... More
Centring and shutring In Raft & PCC including strutting, propping etc. and removal of form for foundations, footings bases of columns etc for mass concrete 5.91
69.84
309
21630.84
... More
Centring and shutring In Wall including strutting, propping etc. and removal of form for foundations, footings bases of columns etc for mass concrete 5.9.2
90.72
665
60376.88
... More
Centring shifting in colum DSR 5.9.6 9
119.71
759
90904.18
... More
Centring and shutring In Suspended Floor & Roof including strutting, propping etc. and removal of form for foundations, footings bases of columns etc for mass concrete 5.9.3
145.65
732
106685.71
... More
Mild steel or fron in plain work such as reinforced concrete or reinforcement brick work (When not wrought to included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured up to floor two level.
47.1
8000
376800
... More
Brick work with common burnt clay F.P.S. (non modularj bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement: 4 coarse sand) DSR 6.1.1
35.48
5822
206581.24
... More
Brick work with common burnt clay (non modular) bricks of class 150 in superstructure above plinth level up to floor V level in all shapes and sizes in :: Cement mortar 1:4 (1 cement: 4 coarse sand) PWD SOR 2020-21/6.4.1
49.31
7381
363984.72
... More
Steel Work in built up tubular (round, square or rectangular hollow tubes etc. trusses etc. including cutting hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished samless type tubes DSR 2023
665.37
163
108455.31
... More
12mm thick plaster 1:4 cement and coarse sand mortar supply of all material labour T&P ete all complete work. 13.4.1
702.06
282
198177.5
... More
Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer over the plastered wall surface to prepare the surface even and smooth complete. (DSR No 13.80
702.06
123
86535.92
... More
Wall painting with plastic emulsion paint of approved brand and manufacture to give and even shade: Two or more coats on new work (Ist Quality) (Royal, Silk, Asian/Berger) DAR 13.60.1
702.06
112
79192.37
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade 13.62.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture DSR 13.621
21.6
178
3855.82
... More
S/S of Good Earth For Devlopment of Lowar Sanction Rate cartage
613.29
338
207598.66
... More
Supply & fixing of MS benches including cost of benches (shape & size attached with estime) fixing the wave slide including excavation PCC 1:4:8 cement, coarse sand and 40 mm nominal grit with CC 1:2:4 cement, coarse sand and 20 mm guage stone grit including all material & labour required fixing and orienting ete all complete under the direction of the E/I. Sanctioned Rate.
6
15000
90000
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rota vator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. For Grading | Material (GSB-1) Sanction rate
258.03
3795
979223.85
... More
S/F of 80 mm thick Providing and laying of interlocking concrete block pavement having thickness 80mm as per drawings and technical specifications clause 1504. (Exclusuive G.S.B.) 16.91.2
1720.18
862
1483192.53
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements