Lucknow Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Lucknow Development Authority - LDA Tender
Eprocure
Opening Date17 Dec 2021
Closing Date27 Dec 2021
Tender Amount₹ 1,01,89,000
Costs
EMD
₹ 2,03,800Document Cost
₹ 4,366Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_LDAUP_657076_1Bid Award Id
ViewTender No
52/E-TENDER/CE2021-22/02Tender Authority
Lucknow Development Authority ViewPurchaser Address
-Website
http://http://www.ldalucknow.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
GOMTI NAGAR YOJNA PHASE 2 VIKALP KHAND 3 STHITH PANCHSHEEL APARTMENT ME A-2 BLOCK KE BATHROOM SE HO RAHE CEAPAGE KE NIRAKARAN AND PARK KA NIRMAD KARYA
GOMTI NAGAR YOJNA PHASE 2 VIKALP KHAND 3 STHITH PANCHSHEEL APARTMENT ME A-2 BLOCK KE BATHROOM SE HO RAHE CEAPAGE KE NIRAKARAN AND PARK KA NIRMAD KARYA
GOMTI NAGAR YOJNA PHASE 2 VIKALP KHAND 3 STHITH PANCHSHEEL APARTMENT ME A-2 BLOCK KE BATHROOM SE HO RAHE CEAPAGE KE NIRAKARAN AND PARK KA NIRMAD KARYA
BOQ Items
... More
Supply of P.V.C band 75 mm dia. (PWD SOR Chapter -1 S.N-17{35})
150
-
60
... More
Supply of P.V.C Socket 75 mm dia. (PWD SOR Chapter -1 S.N-17{38})
450
-
31
... More
Supply of P.V.C. Pipe 110 mm dia 6 kg. pressure I.S.I mark. (PWD - 2019 Chapter-1 S.I No- 17(31))
1350
-
495
... More
Supply of P.V.C band 110 mm dia. (DSR-2018 Vol-2 Basic rate code-72090
300
-
61.95
... More
Supply of P.V.C Socket 100 mm dia. (PWD SOR Chapter -1 S.N-17{37})
250
-
30
... More
Enggagment of Plumber in complete work.
1210
-
400
... More
Enggagment of Beldar in complete work.
2200
-
325
... More
Supply of White glazed earthen ware Pan 580 mm dia (Orrisa Pan) Jaquar ESSCO, cera, hindware. (PWD SOR Chapter -22 S.N-1)
300
-
1230
... More
Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. ( Vol-1 DSR -2018 (11.37A)
2610
-
1021
... More
White glazed earthen ware (European Type) W.C. Pan 505 mm dia with seat cover Jaquar ESSCO, Cera, Hindware (PWD SOR Chapter -22 S.N-3)
200
-
1490
... More
Supply and fixing Plan G.I "T" in all complete work. (PWD SOR Chapter -21 S.N-8)
1750
-
59.06
... More
Supply and fixing G.I Elbow 15 x 20 mm in all complete work. (PWD SOR Chapter -17 S.N-8)
4100
-
33.69
... More
Supply and fixing G.I. Socket 20 mm in all complete work. (PWD SOR Chapter -17 S.N-22)
1750
-
30.62
... More
Wall Tiles in all complete work. (PWD SOR Chapter -10 S.N-7(8.31))
250
-
895
... More
S/F of murga jali (PWD SOR Chapter -13 S.N-3)
250
-
50.4
... More
12 mm plaster in 1 : 4 for 15 mm plaster in all complete work. (PWD SOR 2020-21 Chapter -15 S.N-3(13.5)
1000
-
217
... More
Engagemnt of Sweeper for basement in all complete work.
50
-
368.5
... More
Excavation in Foundation in ordinary Soil (loam clay or sand) including Lift up to 1.5 meter (5 ft.) and lead up to 30 m (100 ft) and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30m (100 ft) from the foundation trenches. UPPWD SORS.No (251)
200
-
120
... More
Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SOR - 281
130
-
6099
... More
First Class Brick work in 1:4 (1 cement : 4 Coarse sand)mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. UPPWD SOR-2021 (307) (6.1.1)
180
-
6715
... More
12mm thick plaster with cement mortar in proportion of 1:3 Cement & Coarse Sand. UPPWD SOR-2020-21 (13.7.1)
650
-
208
... More
Providing and Applying of Birla Putty including supply of allmaterial, Labour T&P etc. required for the proper completion of the work. (PWD SOR S.No-13.80)
650
-
99
... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade. New work (Two or more coats applied @ 1.43 ltr/10 Sqm over and including priming coat of exterior primer applied @ 2.20 Kg/10 Sqm) (apex ultima, weather coat all quard) asian, berger.(PWD SOR 2020-21 S.No-13.47.1)
650
-
123
... More
Mild steel or iron work in heavy size such as trusses, build up gates, door frames, record racks, roof work, gates etc wrought to required from including drilling holes, rivetting or welding where necessary and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work. (SOR - 503) (2019)
6
-
8680
... More
Excavativng supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5Km also including ramming and watering of the earth in layiers not exceeding 20 cm in trenches, plinth sides of foundation etc. complete (PWD SOR 2020-21 Chapter No-7 S.No-5(2.25(a)))
75
-
103
... More
Supply and Fixing of Rubber Moulded 80 mm. Thick cement grey/ordinary red Interlocking Tiles including cost of material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-Charge. (PWD SOR 2020-21 Chapter No-25 S.No-34(MORD 1500 (6.7)))
300
-
980
... More
Cement concrete with 2 cm gauge approved stone ballast, coarse sand & cement in the proportion of 1:2:4 including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of work. (PWD SOR 2020-21 S.No-(4.1.21)
2
-
6990
... More
Supply and fixing Swing duble 04 seater in all complete work.
3
-
58450
... More
Supply and fixing Benches in all complete work.
20
-
23180
... More
Painting roofs or other iron work in large area with one coat of ready mixed priming paint with Two coat of approved paint (ANTISOL) including supply of all materials, labour and T&P etc. required for proper completion of work. Paint to be used should confirm ISI no. 103-1950 (Cost of area of 650 sq.ft.) (SOR 644 + 645)
100
-
82
... More
Providing and laying in position ready mixed M-25 Grade concrete for reinforced cement concrete work. All works above plinth level upto floor 5th level. (PWD SOR 2020-21 (5.37.2)
24
-
8214
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. SOR - 504
20
-
6350
... More
Centring and shuttring including stutting, proping etc and removal of from for walls any thickness (PWD SOR 2020-21 (5.9.2)
200
-
328
... More
Cartage upto 10 Km distance in all complete work.
130
-
257.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements