Lucknow Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Lucknow Development Authority - LDA Tender

Works
Housekeeping Services
Eprocure
Opening Date22 Jun 2019
Closing Date1 Jul 2019
Tender Amount₹ 11,05,287 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scraping old white or colour wash including disposal of refuse material as directed by Engineer-in-charge with a distance of 60 met.(200 feet)LDA SOR 2018-19/708

1180

11800

10

... More
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour and T&P etc. required for proper completion of work. LDA SOR 2018-19/660+661

2358

161523

68.5

... More
Supply of still bench Approved rate

15

347700

23180

... More
Excavation in foundations in ordianary soil (Loan clay or sand) including lift upto 1.5 m (5 fts) amd ;ead i[tp 30 m (100 ft) & including filling, watering and ramming of excavated earth into the trenches of into the space between the building and teh sides of foundation trenches or into the plinth adn removal and disposal of surplus earth as directed by the Engineer - in charge upto a distance of 30 m (100fts) from the foundation trenches.LDA SOR 2018-19/251

19

2090

110

... More
Providing and laying Cement concrete 1:5:10 (1 cement : 5 fine sand : 10 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. LDA SOR 2018-19/274

7.5

21375

2850

... More
First Class brick work in 1 : 4 cement and coarse sand of 2.60 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.LDA SOR 2018-19/305 b

5.4

21870

4050

... More
Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:2:4, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all other materials, labour and T & P etc. required for proper completion of the work.LDA SOR 2018-19/282

1.4

10101

7215

... More
Mild steel or iron work of small size and sections such as holding down bolts, hold fast, tie rods, grating etc,(when not included in an overall rates) wrought to required form, including supply of steel, bolts, nuts and wastage etc. and their fixing required for proper completion of work LDA SOR 2018-19/502

0.65

3640

5600

... More
Painting or Varnishing on Iron works in small areas or new wood work one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work. Paint to be used should confirm to the ISI no. 103-1950LDA SOR 2018-19/641+642

16.5

1575

95.5

... More
Providing Tractor with Trolly including Driver & POL.LDA SOR 2018-19/10.7

100

45750

457.5

... More
Engagement of labour for required work as per directed by E/I PWD SOR 2016

100

29600

296

... More
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soilLDA SOR 2018-19/2.19

2370

22278

9.4

... More
Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly leveling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). LDA SOR 2018-19/2.1

711

22041

31

... More
Rough dressing the trenched ground including breaking clods (DAR 2016 hort - LDA SOR 2018-19/2.5

2370

1422

0.6

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). LDA SOR 2018-19/2.17

65

12577

193.5

... More
Fine dressing of the ground. LDA SOR 2018-19/2.7

2370

3436

1.45

... More
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). LDA SOR 2018-19/2.8

59

1250

21.2

... More
Supplying & stacking of selection NO.1 Doob grass at site fressh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. and as per direction of officer in charge. LDA SOR 2018-19/2.23

176

7673

43.6

... More
Grassing with selection No.-1 including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and earth shall be paid for separately). A-2.10.1 in rows 5 cm apart in both directions LDA SOR 2018-19/2.10.1

1757

12299

7

... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) : D-Holes 45 cm dia, and 45 cm deep. LDA SOR 2018-19/2.14d

141

1318

9.35

... More
Supply & Stacking 30.50% IP LDA SOR 2018-19/11.6

3

7761

2587

... More
Supply and stacking of Eugenia jambolana (Jamun) plant of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. DAR ITEM NO. 10338 Analysis Rate

30

1740

58

... More
Supply and stacking of Quisqualis indica plant of height 30 cm to 45 cm. in 20 cm size of Earthen pots / Plastic pots & as per direction of the officer-in-charge. (DAR 2016HORT-9.12 based) Analysis Rate

30

615

20.5

... More
Supply and stacking of Delonix regia (Gulmohar) plant of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge.v (DAR 2016HORT-7.24 based) Analysis Rate

30

1485

49.5

... More
Supply and stacking of Tabebuia sp. plant of height 150-165 cm. in big polybags of size 25 cm as per direction of the officer-in-charge. (DAR 2016HORT-7.84 based) Analysis Rate

30

1980

66

... More
Supply and stacking of Grevillea robusta (Silver Oak) plant of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. (DAR 2016HORT-7.45 based) Analysis Rate

30

1245

41.5

... More
Supply and stacking of plant Ficus blackii (F.vivion) of height 45-60 cm. with 6-8 branches healthy foliage in earthen pots of size 25 cm as per direction of the officer-in-charge. (DAR 2016HORT-8.21 based) Analysis Rate

30

2730

91

... More
Supply and stacking of Ficus benjamina (green) plant of height 120-135 cm. with 6-8 branches and lush green foliage in g. bags of size 25 cm as per direction of the officer-in-charge. (DAR 2016HORT-7.26 based) Analysis Rate

30

2490

83

... More
Supply and stacking of Plumeria alba plant of height 120-135 cm. with 2-3 branches in bags of size 30 cm as per direction of the officer-in-charge. (DAR 2016HORT-7.69 based) Analysis Rate

30

2985

99.5

... More
Plantation of tree , shrubes, & hedge at site , watering & removal of unservicebal materials as per direction of officer-in -Charge LDA SOR 2018-19/2.30 Tree plants

240

691

2.88

... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide ,Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.) 2.40.1 Prestigious works / H.M. house & officers entitled to free LDA SOR 2018-19/2.40.1

28440

55458

1.95

... More
Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/ edge bed watering, manureing & apply insecticides & fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge.LDA SOR 2018-19/2.24

1968

13185

6.7

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). LDA SOR 2018-19/2.17

7

1354

193.5

... More
Supplying and stacking of good earth at site including royalty and carriage upto 15 km. complete (earth measured in stacks will be reduced by 20% for payment).LDA SOR 2018-19/2.2

7

2369

338.5

... More
Supply & stacking Urea 40% Nitrozen LDA SOR 2018-19/11.1

94

643

6.85

... More
Supply & stacking DAP LDA SOR 2018-19/11.2

29

655

22.6

... More
Supply & stacking Bonemeal/ Oil cake LDA SOR 2018-19/11.3

29

913

31.5

... More
Providing Tractor with Trolly including Driver & POL.LDA SOR 2018-19/10.7

63

28822

457.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.