Lucknow Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Lucknow Development Authority - LDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Feb 2024
Closing Date13 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,00,400Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_LDAUP_892404_1Bid Award Id
ViewTender No
98/ENIVIDA/CE/2023/02Tender Authority
Lucknow Development Authority ViewPurchaser Address
-Website
http://http://www.ldalucknow.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying & stacking of selection NO.1 grass at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. and as per direction of officer in charge. (DAR 2020 Hort - 2.35) based
2525
98222
38.9
... More
Grassing with selection No.-1 including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and earth shall be paid for separately). in rows 5 cm apart in both directions DSR 2018 Horti - SI No. 2.10
25253.28
174247
6.9
... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.) Play grounds / Public parks Per Sqm (as per yard stick 1Mali =2.00Acre). DSR (Hort) 2018/2.40.5
2020262.4
2626341
1.3
... More
Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/ edge bed watering, manureing & apply insecticides & fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge.
DSR (Hort) 2018/2.36
139776
1174118
8.4
... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage with all lead and lifts complete (cattle manure measured in stacks will reduced by 8% for Payment). DSR (Hort) 2018/2.25
499.2
100838
202
... More
Supplying and stacking of good earth at site including royalty and carriage upto 15 km. complete (earth measured in stacks will be reduced by 20% for payment). (DAR 2018 HORT-2.2 based)
499.2
167232
335
... More
Supply & stacking Urea 40% Nitrogen @ 160 kg per acre (as per yard stick of CPWD LDA SOR 2018-19/11.1
6656
45593
6.85
... More
Supply & stacking DAP 50 kg per acre/year. LDA SOR 2018-19/11.2
2080
47008
22.6
... More
Arrangement of Tractor Trolly including loading unloading of stacked kuda & malwa including all complete of work. Sanctioned Rate
384
222720
580
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements