Kushinagar Special Area Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kushinagar Special Area Development Authority Tender
Paints and Enamels
Housekeeping Services
Eprocure
Opening Date31 Dec 2018
Closing Date7 Jan 2019
Tender Amount₹ 1,04,36,000
Costs
EMD
₹ 7,22,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_KSADA_289579_1Bid Award Id
ViewTender No
255/256Tender Authority
Kushinagar Special Area Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.C.C work with cement approved coarse sand and 2cm gauge stone girt(dala) in the proportin of 1:1.5::3 (M-20) in Column footing excluding supply of reinforcement and its bending but including fixing and blending the same with 24 BWGGI bandiung wire and including necessary centering and shuttering etc and also including supply of all materials, labour and T&P etc, required for proper completion of work As per S.No 287A.
144.55
982940
6800
... More
RCC work with cement approved coarse sand and 20mm gauge nomial size dalla stone aggregate in the proportion of 1:1.5:3 M-20 in RCC Column excluding supply of re inforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire and as required supply of all materials, labour centering and shuttering and removsal of the same after completing of work s no 288A.
204.63
1780281
8700
... More
RCC work with cement approved coarse sand and 20mm gauge nomial size dalla stone aggregate in the proportion of 1:1.5:3 M-20 in RCC Column excluding supply of re inforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire and as required supply of all materials, labour centering and shuttering and removsal of the same after completing of work s no 285A.
0.77
6545
8500
... More
RCC work with cement approved coarse sand and 20mm gauge nomial size dalla stone aggregate in the proportion of 1:1.5:3 M-20 in RCC Column excluding supply of re inforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire and as required supply of all materials, labour centering and shuttering and removsal of the same after completing of work s no 288A.
4.54
39498
8700
... More
RCC work with cement approved coarse sand and 20mm gauge nomial size dalla stone aggregate in the proportion of 1:1.5:3 M-20 in RCC slab laid Monolithik with beam Column excluding supply of re inforcement and its bending but including its fixing and binding the same with 24BWGGI binding and as required supply of all materials, labour centering and shuttering and removsal of the same after completing of work s no 288A.
10.82
94134
8700
... More
Mild steel or iron work in plain work such as reinforced cement concrete when not included in over all rate wrought to required shape as necessary including bending for proper completion of work, supply of steel and lobour etc. required and including wastage bend, hooks and authorised over lappling shall be measured as per s. no 504.
322.46
1644546
5100
... More
M150 brick work in 1:4 cement and c sand mortar in foundation and plinth including supply of all materials. labour and toolsand plants etc required for proper completion of work s no 305A.
112.36
542137
4825
... More
M150 brick work in 1:3 cement and approvel coarse sand in super structure and plinth including supply of all material labour and tools and plants etc. required for proper completion of work. but in super structure including necessary cutting and moulding of brick work, thikness of wall more than one break and for extra labour to above items. but walls of half brick 115mm thick add for extra labour over item no s.no 37+309.
148.18
789799
5330
... More
12MM thick plaster with cement mortar inproportion of 1:4 cement and sand of 1.25 FM over brick work minimum thickness not be less than 10mm including suply of all materials, labour and T&P etc. required for proper completion of work as per s.no 584.
210.2
26485
126
... More
Providing and laying flamed finish granite stone flooring in required desing and patterns, in linear as well as curvillinear portion of the building all complete as per the architectural drawings with 18mm thick stone slab over 20 mm average thick base of cement mortar 1:4 laid and jointedwith cement slurry and pointing with while cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the engineer in charge. flamed finish granite stone slab jet black, cherry red, elite brown, cat eye or equivalent DSR8.12.
84.73
274893
3244.35
... More
Stone tile polished work for wall lining over 12mm thick bed of cement mortar 1:3and cement slurry @3.3kg/sqm including pointing in white cement complete. granite of aly colour and shade DSR8.9.1.2.
41.41
79583
1921.85
... More
Precast terrazo tiles 22mm thick with graded marble chipsof sixe upto 12mm laid in floors, and landing, jointed with heat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete on 20mm thick bed of cement mortar 1:4 light shade pigment using white cement CPWD 11.16.1 chapter 14.
56.28
44179
785
... More
40mm thick fine dressed stone flooring over 20mm agerage thick base of cement mortar 1:5 with joints finished flush. Red sand stone S.No 11 CPWD11.28chapter 14.
850.14
255042
300
... More
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of files, including rubbing and cleaning etc, complete on 22mm thick bed of cement mortar 1:4 light shede pigment using white cement s, no. 12 CPWD 11.20.1. chapter 14.
846.38
423190
500
... More
Fabrication and supply of MS grill as per approved design and drawing including the stair case railling etcv. with square bars , m/s. angleiron and m.s. flat iron as per direction of engineer in charge supply of steel and its wastae cutting drilling holes and welding joints where necessary including each joint tube perfectaly welded and jointed and grinded to smooth finish. As per NSN 2 chapter 10.
122.66
699162
5700
... More
Mild steel or iron work in heavy sixes such as trusses, built up gates, record racks, roof work, gates etc. wrought to required form, including drilling holes reverting or welding where necessary and their fixing, required for proper completion of work. As per S.No 503.
2
11800
5900
... More
Painting or vernishing new iron work in small areas or new wood work with one coat of ready mixed primming paint and two coats of approved superior quality ready mixed synthetic enemal paint of approved brand such as British Paint, shalimar , asian or equipment ISI approved paint including supply of all material, labour etc. complete paint of be used should be confirm hte ISI no 103-195. As per sN0 641+642.
184
16118
87.6
... More
Finishing wallls with water proof cement paint of approved make and on new work with 3 coat to give an even shade including supply of all material labour and tool and plant etc. required for proper completon of work S.No 660-661.
545.35
35665
65.4
... More
One primary coat of cement primer paint and 2 coats of oil distemper of approved brand and manufacture to give an even shade including supply of material labour and TP etc. required for proper completion of work. As per SNo-6499-650.
61.62
4094
66.45
... More
S/o Hand rail and Balustrade modular system passive SS-304 grade decorative railing system comprising of hand rail 50MM and 1.5MM thick of equal spacing with balustrade of SS Pipe of 38MM and 1.5mm thick @1200 mm C/C of passivated SS304 grade and fix duly on the floor with specially design rivet expansion bolt and finish the surface food and covering with steel shoe, with all visible stainless steel metal of 304grade in stain finish height of railing is 900mm as per detailed specification Sno-20 chapter 1 material.
63.28
284760
4500
... More
cement concrete with 20mm gauge dalla stone aggregate approved chopan coarse sand and cement in the proportion of 4:2:1 in hold fast including supply of all material, labour and tools and plants etc. Required for proper completion of work. As Per S.No 279A.
0.43
2730
6350