Kushinagar Special Area Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kushinagar Special Area Development Authority Tender

Works
Civil Works Others
Eprocure
Opening Date6 Jan 2020
Closing Date13 Jan 2020
Tender Amount₹ 29,79,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work with cement approved coarse sand and 2cm gauge stone girt dala in the proportion of 1:1.5:3 m-20 in column footing excluding supply of reinforcement and its bending but including fixing and bending the same with 24BWGGI banding wire and including necessary cemtering and shuttring etc & also including supply of all materials, labour and T&P etc required for proper completion of work as per s no 287.

41.64

-

7180

... More
RCC work with cement approved coarse sand and 20MM gauge nominal size dall stone aggregate in proportion of 1:1.:3 m-20 in RCC column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work s.no 289

37.73

-

9550

... More
RCC work with cement approved coarse sand and 20MM gauge nominal size dall stone aggregate in proportion of 1:1.:3 m-20 in RCC plinth beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24BWGGI binding wire and as required supply of all materials, labour centering and shuttering and removal of the same after completion of work s.no 283A

35.1

-

7900

... More
Mild steel or iron work in plain work such as reinforced cement concrete when not included in over all rate wrought to required shape as necessary including bending for proper completion of work supply of steel all labour etc required and including wastage bend hooks and authorised overlappling shall be measured as per s no 504.

139.79

-

4700

... More
M-150 class brick work in 1:4 and C/sand mortar in super structure including necessary cutting and moulding of bricks required and also including honeycomb brick work, supply of all materials, labour tools and plants etc. required for proper completion of work but thickness of wall is one brick 230mm 305+309+310

143.52

-

5130

... More
12mm thick plaster wih cement mortar inproportionof 1:4 cement and c sand over brick work minimum thickness not to be less than 10mm including supply of all materials labour and T&P etc. required for proper completion of work as per 584A.

663

-

135

... More
12mm thick plaster wih cement mortar inproportionof 1:4 cement and c sand over brick work minimum thickness not to be less than 10mm including supply of all materials labour and T&P etc. required for proper completion of work as per 584A+596.

663

-

149

... More
Finising walls with waterproof cement paint of approved make and on new work with 3 coat to give an even shade including supply of all materials labour and tools and plants etc. required for proper completion of work s.no. 660+661.

1685.69

-

62

... More
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grese dirt and other foreign matter and scoured with wire brushes, fine steel .wood scrappers sand paperingand knotting including cost of all materials, labour and T&P etc. required for proper completion of work s.no 1chapter 15 new item.

179.4

-

19

... More
Painting first coat over priming coat but excluding cost of priming coston wood or steel and other metal surface with superia=or synthetic enamel standard make brusing to give an even shade and finish and including cleaning the surface of all dirt dust and other foreign matter and papering and stripping including cost of all material, labour, T&P etc required for the proper completion of work but for every subseuent coat after first coat on wood or steel surface withpaint of !!! superialr quality s.no 2+4chapter 15. New item.

179.4

-

50



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.