Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Electrical and Electronics
Eprocure
Opening Date10 Oct 2023
Closing Date23 Nov 2023
Tender AmountRefer Documents
Costs
EMD
₹ 13,500Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KESCO_848962_1Bid Award Id
ViewTender No
22/EUDC-II/2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Loading, Carriage and unloading of poles from store to work site.
60
-
-
Loading, Carriage and unloading of damaged poles from work site to store.
60
-
-
Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification.
60
-
-
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
60
-
-
Erection of Same for Old pole Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
10
-
-
Erection of old partialy damiged S.T. Pole for H.T./L.T. pole by excavation & removed of Polesand then refxing of pole inchanging proper concreting and dismentaling & refixing of all acuerreny
15
-
-
Concreting of all newly ereeted(New/Old) S.T. pole of H.T/L.T. line With pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
60
-
-
Erection of double pole structure including fixing of T.P.M.O. (Old/New) (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.
3
-
-
Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)
3
-
-
Erection of four pole structure including fitting of channels etc. as well as proper alignment of structure.
1
-
-
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.
30
-
-
Fixing of stay rod and its erection by fitting of Old/New stay clamp. Stay wire and its proper binding and tightening etc.
20
-
-
Line Work (Conductor)
-
-
-
Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
1800
-
-
Loading, carriage and unloading of conductor from store to work site and vice versa
400
-
-
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
110
-
-
Laying, stringing, tensioning and binding of Weasal conductor old/new for H.T./L.T. O.H.
1800
-
-
Laying, stringing, tensioning and binding of Dog conductor old/new for H.T./L.T. O.H.
1800
-
-
Fixing of guarding angle/guarding channel for laying of guarding wires
30
-
-
Laying, stringing, tensioning & final sagging for guarding wire old/new
1100
-
-
Cross lacing of guarding by G.I. wire old/new (approximate 5 lacing of each span)
18
-
-
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
6
-
-
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
6
-
-
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.
1
-
-
Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.
1
-
-
Fabrication/modifications of M.S. Items as per requirement of site conditions.
30
-
-
Jumpering of H.T. Lines from the existing H.T.O.H. line.
10
-
-
Jumpering of L.T. Lines from the existing L.T.O.H. line.
10
-
-
Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.
5
-
-
Making proper clearance of betwean House & line Conducter to avoid accident by providing & flaxing Angle/Channel on pole, and shifing Line on Angle/Channel. (MS item provided by contractor)
5
-
-
Line Work (AB Cable)
-
-
-
Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.
1800
-
-
Removal of AB Cable to replaed damige pole by Old/New pole and its proper Laying & resagging on poles including proper fxing of Distribution boxand making connectionCnchuding providing board & frixing new Eye Hook in place of damiged
100
-
-
Loading, carriage and unloading of Aearial Bunched Cable from store to work site and vice versa.
2000
-
-
Laying of Aearial Bunched Cable old/new for Erection of L.T. O/H Line.
2000
-
-
Mounting & Erection of single phase distribution box old/new
300
-
-
Mounting & Erection of three phase distribution box old/new
50
-
-
Opening and reconnection of consumer connections for shifted/replaced of pole.
500
-
-
Repairing of Single Phase/Three Phase distribution Box (All material provided by contractor)
150
-
-
H.T. / L.T. Cable Work
-
-
-
(a) H.T. Cable
100
-
-
(b) L.T. Cable
25
-
-
Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable-
-
-
-
(a) Normal Soil
50
-
-
(b) Kharanja Road
20
-
-
(c) Metallic Road
20
-
-
Laying of cable in the above digging, trench, covering with bricks, sand and back filling.
-
-
-
(a) H.T. Cable
100
-
-
(b) L.T. Cable
10
-
-
Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling.
-
-
-
(a) H.T. Cable
50
-
-
(b) L.T. Cable
10
-
-
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.
-
-
-
(a) H.T. Cable
100
-
-
(b) L.T. Cable
10
-
-
Restoration of Metallic/RCC road after proper repairing with appropriate materials.
50
-
-
Making of cable box for 11 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
30
-
-
Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends.
-
-
-
(a) With pipe (3Mtr. Long MS pipe will be provided by KESCo)
4
-
-
(b) Without pipe
4
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line :
-
-
-
a) Single Core L.T. Cable
18
-
-
b) 3 ½ Core L.T. Cable
18
-
-
c) 11 KV H.T. Cable
18
-
-
Distribution T/F work
-
-
-
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 2.0 x 2.0 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
5
-
-
Shifting of Charged T/F on Trolly for Making plinth & then reshifting on T/F Plinth Indudy all Labour matenal & T&P reqund
2
-
-
For restoring Supply in come of T/F damiged Shifting of T/F Trolly upto site & vice versd.
5
-
-
Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.
5
-
-
Erection of Distribution T/F on plinth/D/pole structure.
5
-
-
Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.
5
-
-
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
5
-
-
Connection of L.T. cable from L.T.D.B to L.T.O.H.
5
-
-
To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
3
-
-
Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
8
-
-
Making proper earthing arrangement of T/F by deep bore pipe earthing including (G.I. Pipe 40 mm. dia, B-Class, 40 feet, socket, cutter and earth wire size 7/14SWG with nut & bolt) with connecting the same with Distribution T/F Neutral & Body. All material will be provided by Contractor.
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements