Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Eprocure
Opening Date11 Jun 2019
Closing Date26 Jun 2019
Tender Amount₹ 3,91,168 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_KESCO_352761_1Bid Award Id
ViewTender No
04/Const./2019-20Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Erection of Single S.T. Pole including fixing of 11 KV V type cross arm, top bracket and all hardware fittings.
42
-
-
Erection of Double pole from existing single pole.
1
-
-
Grouting of pole with cement brick ballast and coarse sand as per standard specification.
43
-
-
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
43
-
-
Painting of S.T. pole with one coat of red oxide and two coats of Alm. Paint above fuse set including cost of ISI mark Ist Class enamel paint.
43
-
-
Earthing of supports as per standard specifications.
43
-
-
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
12
-
-
Chopping of tree branches lying in the route of newly erected line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.
20
-
-
Laying of AB cable as L.T.O.H. line fixing of Clamp with Eye Hook & suspension Clamp etc.
2600
-
-
Mounting & Erection of single phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
40
-
-
Mounting & Erection of three phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
18
-
-
Opening and reconnection of consumer connections after replacement of line/ pole etc.
500
-
-
Construction of T/F Plinth size 1.2x1.2x1.2 Cubic Mtr including M.S. Angle size 65x65x6mm will be Solid with brick work 75mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast with step including cost of all material.
1.7
-
-
Dismentalling of existing 250 to 400 KVA distribution T/F and erection of the same newly construction plinth.
1
-
-
Erection of L.T. Distribution circuit 500V/500 Amp. on newly erected D/Pole after fitting L.T. brackets and all other accessories.
2
-
-
Dismentalling of existing distribution T/F Fencing and erection and grouting of T/F Fencing on shifted T/F plinth
1
-
-
Dismentalling of ACSR/AAC Conductor.
4800
-
-
Excavation of ST pole (Old & Used) from ground by digging the pit or by cutting with gas cutter and its proper stacking.
33
-
-
Loading carriage of M.S. Item, Channel/L.T. Bracket from work site to Store.
224
-
-
Loading carriage of old & used conductor from work site to Store.
450
-
-
Connecting of newly erected network with kesco mains including testing, commissioning and energization of the same completely.
1
-
-