Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date9 Mar 2024
Closing Date27 Mar 2024
Tender Amount₹ 41,94,896 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairing of servo Moter (Material Supply By Contractor)

10

-

-

... More
Replacement of servo Moter (Material Supply By Contractor)

5

-

-

... More
Replacement of anti pumping relay (Material Supply By Contractor)

6

-

-

... More
Replacement of switch local /Remote relay (Material Supply By Contractor)

5

-

-

... More
Replacement of drum contect assembily (Material Supply By Contractor)

9

-

-

... More
Replacement of Tripping Coil (Material Supply By Contractor)

15

-

-

... More
Replacement of Closing Coil (Material Supply By Contractor)

15

-

-

... More
Overhauling of operating mechanism (Material Supply By Contractor)

15

-

-

... More
Repairing of foult display unit with Alarm. (Material Supply By Contractor)

9

-

-

... More
Repairing of Master/ Auxiliary of 33KV. Control Panel. (Material Supply By Contractor)

5

-

-

... More
Replacement of 33 KV Out Door CT (Material Supply By KESCo)

12

-

-

... More
Replacement of Power Transformer OTI (Material Supply By Contractor)

5

-

-

... More
Replacement of Power Transformer WTI (Material Supply By Contractor)

5

-

-

... More
Replacement of 33 KV CB on/off Switch (Material Supply By Contractor)

10

-

-

... More
Replacement of Ouxilary relay/Master Tripping relay (Material Supply By Contractor)

5

-

-

... More
Replacement of 33 KV PT Junction Box with Fuse Contact (Material Supply By Contractor)

5

-

-

... More
Replacement of 33 KV CT Junction Box with Open Close Contact (Material Supply By Contractor)

5

-

-

... More
Replacement of Breather Assembely With Silica Gel (Material Supply By Contractor)

5

-

-

... More
Replacement of Oil Level Meter of Conservator Tank (Material Supply By Contractor)

3

-

-

... More
Replacement of O/C and E/F relay of 33 KV CRP (Material Supply By Contractor)

3

-

-

... More
Repairing of Tripping & Close Circuit wise (T&C)

5

-

-

... More
Erection Work (11 KV VCB)

-

-

-

... More
General checking, Overhauling, Repairing of Damage Wiring of Operating Machanism and Tripping Circuit of Breakers at least once a Year.

140

-

-

... More
Overhauling of Trolly & Calibration of Male & Female Contect of Interrupter (Material Supply By Contractor)

140

-

-

... More
Attending Fault occurred in Machanism regarding or tripping along with the setting alignment trolly with panel (Material Supply By Contractor)

120

-

-

... More
Replacement of Spout (Material Supply By Contractor)

25

-

-

... More
Replacement of Spout Connection (Material Supply By Contractor)

20

-

-

... More
Replacement of Bushing /Rod (Material Supply By Contractor)

15

-

-

... More
Replacement of Complete Tripping Assembly (Material Supply By Contractor)

100

-

-

... More
Replacement of C.T. 400/200/5 (Set) (Material Supply By KESCo)

20

-

-

... More
Replacement of C.T. 600/300/5 (Set) (Material Supply By KESCo)

20

-

-

... More
Replacement of Tulip Contact (Material Supply By KESCo)

20

-

-

... More
Overhauling of Busbar including providing proper insulation using expire H.T. tape etc.

105

-

-

... More
Replacement of Vacuum Interrupter for 11KV. VCB's to different make in various place (Provided by KESCo.)

25

-

-

... More
Replacement of Clamp Interrupter (Material Supply By Contractor)

25

-

-

... More
Wiring of Pannels (Material Supply By KESCo)

30

-

-

... More
Testing of VCB's complete

90

-

-

... More
General Checking of 11 KV Breaker At least Once in a Year

200

-

-

... More
Replacement of 11 KV Amp. Selector Switch (Material Supply By Contractor)

40

-

-

... More
Replacement of 11 KV Over Current Earth Fault Digital Relay (Material Supply By Contractor)

3

-

-

... More
Replacement of 11 KV Pannel Indication Lamp (Material Supply By Contractor)

80

-

-

... More
Replacement of 11 KV Breaker Limit Switch (NO/NC) (Material Supply By Contractor)

50

-

-

... More
Replacement of 11 KV Pannel Digital Amp. Meter (Material Supply By Contractor)

5

-

-

... More
Replacement of 11 KV Pannel Digital Volt. Meter (Material Supply By Contractor)

5

-

-

... More
General Checking of 24 Volt DC Battery or Charger at least Once in a Year.

50

-

-

... More
Repairing of 24 Volt DC Battery Charger of Sub-Station (Material Supply By Contractor)

30

-

-

... More
Replacement of HRC Fuse of 11 KV PT (Set) (Material Supply By Contractor)

10

-

-

... More
MCB Four Pole 16 Amp. (Material Supply By Contractor)

5

-

-

... More
Replacement of Ouxilary relay/Master Tripping Relay (Material Supply By Contractor)

3

-

-

... More
Replacement of servo Moter (Material Supply By Contractor)

2

-

-

... More
Repairing of servo Moter (Material Supply By Contractor)

10

-

-

... More
Replacement of 11 KV drum Contact (Material Supply By Contractor)

3

-

-

... More
Replacement of 11 KV Pannel Amp Meter Slector Switch (Material Supply By Contractor)

30

-

-

... More
Replacement of 11 KV Breaker HRC Fuse 4 AMP/6AMP (Material Supply By Contractor)

25

-

-

... More
Replacement of 11 KV Breaker Closing & Tripping Switch (Material Supply By Contractor)

5

-

-

... More
Attending Fault occurred in regarding Closing & tripping Circuit along with panel wiring.

100

-

-

... More
Dismentelling Work

-

-

-

... More
Scrap Material

45

-

-

... More
Loading/Unloading & Carriage Work site to Sore

-

-

-

... More
Received Back Material (L/S) Mixed Scrape

45

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.