Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Eprocure
Opening Date15 Jul 2021
Closing Date22 Jul 2021
Tender Amount₹ 34,34,000
Costs
EMD
₹ 35,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
Work Under Maintenance And Repair, System Improvement And Deposit Scheme Of 11/0.4 Kv O.h. /u.g. Line And Breakdown Work Of 11/0.4 Kv Lt Lines Under Jajmau And Harrisganj Division Under Eudc-iii Kesco Kanpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_KESCO_603877_1Bid Award Id
ViewTender No
06/EUDC-III/2021-22Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion.
160
-
-
Loading, Carriage and unloading of STP poles from store to work site.
220
-
-
Loading, Carriage and unloading of damaged poles from work site to store.
180
-
-
Loading, Carriage and unloading of PCC Poles from store to work site.
60
-
-
Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification.
220
-
-
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
220
-
-
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
220
-
-
Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.
8
-
-
Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.
8
-
-
Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)
8
-
-
Erection of Tri-Pole structure including fitting of channels etc. and proper alignment.
2
-
-
Excavation of foundation and taken out the damaged PCC pole to be replaced.
60
-
-
Grouting of PCC pole with cement brick ballast and coarse sand as per Standard Spacification.
60
-
-
Erection of new PCC pole for L.T. O.H. line and fitting of all related hardware
60
-
-
Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe with all Material
10
-
-
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.
60
-
-
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
40
-
-
Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
4000
-
-
Loading, carriage and unloading of conductor from store to work site and vice versa
1000
-
-
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
240
-
-
Laying, stringing, tensioning and binding of Old & New Weasal conductor for H.T./L.T. O.H.
4000
-
-
Laying, stringing, tensioning and binding of Old & New Dog conductor for H.T./L.T. O.H.
4000
-
-
Fixing of guarding angle/guarding channel for laying of guarding Old & New
80
-
-
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire Old & New
2400
-
-
Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span)
40
-
-
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
14
-
-
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
14
-
-
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.
2
-
-
Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.
2
-
-
Fabrication/modifications of M.S. Items as per requirement of site conditions.
70
-
-
Jumpering of H.T. Lines from the existing H.T.O.H. line.
20
-
-
Jumpering of L.T. Lines from the existing L.T.O.H. line.
20
-
-
Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.
460
-
-
Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.
20000
-
-
Loading, carriage and unloading of Aearial Bunched Cable from store to work site and vice versa.
7000
-
-
Laying of Old & New Aearial Bunched Cable for Erection of L.T. O/H Line.
7000
-
-
Mounting & Erection of single phase distribution box Old & New.
600
-
-
Mounting & Erection of three phase distribution box. Old & New
110
-
-
Opening and reconnection of consumer connections for shifted/replaced of pole.
1000
-
-
Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
60
-
-
Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends With pipe (3Mtr. Long MS pipe will be provided by KESCo)
10
-
-
Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends Without pipe
10
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line Single Core L.T. Cable
40
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 3 ½ Core L.T. Cable
40
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 11 KV H.T. Cable
40
-
-
Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa.
10
-
-
Erection of H.T. metering cubical on plinth as per standard norms.
10
-
-
Construction of plinth for H.T. pilffer metering cubical.
10
-
-
Dismentalling of H.T. pilffer metering cubical.
2
-
-
Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc.
10
-
-
Earthing of supports/ metering cubical/ HTPB etc. as per standard specifications.
40
-
-
Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa.
4
-
-
Erection of O/D type Metering unit on D/P Structure.
4
-
-
Connection of H.T. Jumper to HT Bushing of O/D type Metering unit.
4
-
-
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
24
-
-
Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.
20
-
-
Erection of Distribution T/F on plinth/D/pole structure.
20
-
-
Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.
20
-
-
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
20
-
-
Connection of L.T. cable from L.T.D.B to L.T.O.H.
20
-
-
To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
14
-
-
Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
40
-
-
Reparing of T/F plinth, Size of the plinth will be 1.2 x 1.2 x 1.2 Cubic Mtr including civil matrial will be solid with brick work 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast with step.
10
-
-
L/C for deep bore pipe earthing including (G.I. Pipe 40 mm. dia, B-Class, 40 feet, socket, cutter and earth wire size 7/14SWG with nut & bolt) with connecting the same with Distribution T/F Neutral & Body. All material will be provided by Contractor.
20
-
-
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.
20
-
-
Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.
20
-
-