If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date5 Sep 2023
Closing Date25 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 44,400Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KESCO_835035_1Bid Award Id
ViewTender No
12/Const./2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Loading, carriage & unloading of distribution Transformers (Upto 400 KVA) from Store to site, site to site & vise-versa.
44
-
-
... More
Loading, Fabrication and modifications of M.S. Items as per site requirement.
2640
-
-
... More
Erection of Single S.T. Pole/Stud Pole including fixing of 11 KV V type cross arm/L.T. Brackets/suspension clamp with eye hook/ dead end clamp with eye hook etc. with hardware fittings
108
-
-
... More
Erection of double pole structure including fixing of top channel, fuse set on fuse set channel etc. as per standard specifications.
22
-
-
... More
Grouting of pole with cement brick ballast and coarse sand as per standard specification.
152
-
-
... More
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of Civil Material.
152
-
-
... More
Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of redoxide on full length of pole and then two coat of Aluminum paint upto X-arm from top incluidng cost of paint and redoxide paint used should be ISI mark 1st class enamel paint.
152
-
-
... More
Earthing of supports as per standard specifications.
152
-
-
... More
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
132
-
-
... More
Laying of LT Aerial Bunched Cable including fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Pole etc.
2.4
-
-
... More
Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
30
-
-
... More
Mounting & Erection of three phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
10
-
-
... More
Laying, stringing, tensioning and binding of ACSR Dog conductor for H.T. O.H. line
26.4
-
-
... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
22
-
-
... More
Opening of LT Jumpers from the existing L.T. O.H. line for erection work.
22
-
-
... More
Jumpering of H.T.Lines from the existing HT O.H. line.
22
-
-
... More
Jumpering of L.T. Lines from the existing LT O.H. line.
22
-
-
... More
Chopping of tree branches lying in the route of over head HT/LT line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.
220
-
-
... More
Digging of pit and making of 300x300x450mm chamber with brick work surrounding the G.I. Pipe with C.I Cover.
55
-
-
... More
Supply of G.I. Pipe 40 mm. dia, B-Class, 80 feet with cast iron conical structure having threads, sockets and nut & bolt and all other required materials
55
-
-
... More
Boring and lowering of 80 feet G.I. Pipe along with all coupling and jointing required for each distribution transformer
55
-
-
... More
Supply and Lowering of 25x3mm G.I. Strip of length 90 feet inside the G.I. pipe and making suitable connections including welding etc. with Transformer neutral and C.I. Cone
55
-
-
... More
Supply, filling and laying of 100 Kg salt and 100 Kg Charcoal Power for each earthing
55
-
-
... More
Erection of Distribution T/F on plinth/Double pole structure.
33
-
-
... More
Erection of Drop out fuse set on Double Pole structure
22
-
-
... More
Construction of T/F plinth, suitable for mounting of distribution transformer size of the plinth will be 1.2x1.2x1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
38.06
-
-
... More
Fabrication, erection & grouting of T/F fencing of frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting fo two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust.
633.6
-
-
... More
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
35
-
-
... More
Connection of L.T. cable from L.T.D.B to L.T.O.H.
35
-
-
... More
Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer.
35
-
-
... More
Dismentalling of existing distribution T/F (Upto 400 KVA)
11
-
-
... More
Dismentalling of existing distribution T/F Fencing and Re-erection and grouting of T/F Fencing .
11
-
-
... More
Energizing and shifting of load on newly installed transformer from near over loaded transformer after construction of necessary LT OH Line. (If required)
33
-
-
... More
Loading and Carriage of other itemsfor which loading charges not seperately covered
1
-
-
... More
Following Materials Provided by Contractor as per Site Requirements if required
-
-
-
... More
Nut & Bolts with washer off size
10
-
-
... More
M.S flat for making Clamps/E-bracket etc.
25
-
-
... More
Al. Lug 400/300 Sqmm Long barrel
5
-
-
... More
Al. Lug 70 Sqmm Long barrel
5
-
-
... More
Al. Lug 25 Sqmm Long barrel
5
-
-