Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Eprocure
Opening Date11 May 2021
Closing Date25 May 2021
Tender Amount₹ 1,45,56,364 
Notes
Download

Costs

Summary

Extension Of Load From 900 Kva To 3900 Kva Of Alimco Work Of 33 Kv Underground Cable Laying Through Hdd Method In Kalyanpur Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Advertisement (Publication in News Papers)
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading Carriage and unloading of M.S. Pipe & G.I. Pipe from store to work site.

428

-

-

... More
Loading, Carriage & Unloading of pilfer proof metering cubicle from store to work site & vice versa.

1

-

-

... More
Loading , unloading and Carriage of other materials except as described in Point No. 1, 2, 3 & 4

1

-

-

... More
Erection of 33 KV Pilfer proof metering cubicle.

1

-

-

... More
Supply of 40mm. Dia, Class"B" G.I. Pipe 60' long including M.S. flat 50x6mm. Along with all related materials required for earthing work.

1

-

-

... More
Boring 60' deep & earthing with G.I. Pipe through M.S. flat with proper connection arrangement.

1

-

-

... More
Erection of Four pole Structure including M.S. Channel and other accessories etc.

1

-

-

... More
Grouting of Pole with Cement, ballast, sand and coarse, etc.

4

-

-

... More
Making of Four Pole Plinth 400 mm dia, 600 mm height & 200 mm Under Ground with CC in ratio of 1:4:8, Cement, ballast, sand and coarse, etc.

4

-

-

... More
Painting of ST Pole with One coat of red oxide and Two coat of Aluminum Paint including cost of First class of enamel paint.

4

-

-

... More
Erection of Pole including all accessories as per standard specification

36

-

-

... More
Grouting of Pole with Cement, ballast, sand and coarse, etc.

36

-

-

... More
Making Pole Plinth on Single pole of 400 mm dia, 600 mm height & 200 mm Under Ground with CC in ratio of 1:4:8, Cement, ballast, sand and coarse, etc.

36

-

-

... More
Earthing of Pole as per standard specification.

36

-

-

... More
Painting of ST Pole with One coat of red oxide and Two coat of Aluminum Paint including cost of First class of enamel paint.

36

-

-

... More
Digging of suitable Pit for laying of 33 KV 3x300 sq.mm. XLPE cable and related work and covering that pit with bricks and back filling.

20

-

-

... More
Laying of 33 KV 3x300 sq.mm. XLPE Cable through HDD Method- Horizontal Directional Drilling, Laying of HDPE Pipe, Laying of 33 KV 3x300 sq.mm. XLPE cable in HDPE Pipes. (HDPE Pipe to be provided by contractor)

7779

-

-

... More
Laying of 33 KV 3x300 sq.mm. XLPE Cable through HDD Method with M.S. Pipe

320

-

-

... More
Mounting of 33 KV 3x300 sq.mm. XLPE Cable on pole.

700

-

-

... More
Digging of Trench for laying of 33 KV 3x300 XLPE Cable in size 30cm wide & 1 to 1.3 mtr. deep

100

-

-

... More
Laying of 33 KV 3x300 XPLE Cable in above digged trench covering with bricks and back filling & proper ramming.

100

-

-

... More
Making of Outdoor Joint of 33 KV 3x300 sq.mm., XLPE Cable.

74

-

-

... More
Making of Indoor Joint of 33KV 3x300 sq.mm., XLPE Cable.

2

-

-

... More
Making of Straight through 33 KV joints.

4

-

-

... More
Making of Namastay on Double Pole

36

-

-

... More
Making of H.T. Section Point as per standard specification.

1

-

-

... More
Fitting of Cross bracing upon Four Pole and Double Pole

38

-

-

... More
Fixing of G.I. Pipe for Cable Support on each Namastay.

108

-

-

... More
Fixing of Top Channel & Guard Channel on Four pole structure.

10

-

-

... More
Fabrication/Modication of M.S. Item as per site requirement

200

-

-

... More
Fixing of Danger board with clamp provided by the Contractor at his own cost.

40

-

-

... More
Binding of barbed wire on pole. Barbed wire provided by the Contractor.

80

-

-

... More
Grouting of stay set with concrete

39

-

-

... More
Fixing of Stay set

39

-

-

... More
Fixing of Drop out fuse set for 33 KV

1

-

-

... More
Loading, Carriage of 33 KV CT/PT unit

2

-

-

... More
Mounting of 33KV CT/PT unit on Double pole.

2

-

-

... More
Loading, Carriage & unloading of pole from store to work site for double metering work.

2

-

-

... More
Erection of Double Pole structure for Double Metering.

1

-

-

... More
Loading, Carriage & unloading 33 KV 3x300 sq.mm. Cable from store to work site for double metering work.

30

-

-

... More
Making of outdoor cable joint box for double metering work.

4

-

-

... More
Grouting of Pole for double metering work.

2

-

-

... More
Making Pole Plinth on pole of 400 mm dia, 600 mm height & 200 mm Under Ground with CC in ratio of 1:4:8, Cement, ballast, sand and coarse, etc.

2

-

-

... More
Jumpering work for double metering work.

4

-

-

... More
Earthing for 33KV CT/PT unit.

1

-

-

... More
Earthing of Pole for double metering work.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.