Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date15 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 20,58,377 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion.

150

-

-

... More
Loading, Carriage and unloading of poles from store to work site.

150

-

-

... More
Loading, Carriage and unloading of damaged poles from work site to store.

150

-

-

... More
Loading, Carriage and unloading of damaged PCC poles from store to work site.

200

-

-

... More
Grouting of pole with cement brick ballast and coarse sand as per Standard Specification.

150

-

-

... More
Grouting of PCC pole with cement brick ballast and coarse sand as per Standard Specification.

200

-

-

... More
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.

150

-

-

... More
Erection of PCC pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.

200

-

-

... More
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.

150

-

-

... More
Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint upto X-arm from top including cost of paint and red oxide paint used should be ISI mark Ist class enamel paint.

2

-

-

... More
Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.

2

-

-

... More
Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.

2

-

-

... More
Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)

2

-

-

... More
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.

10

-

-

... More
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.

20

-

-

... More
Line Work (Conductor)

-

-

-

... More
Dismantling of binding wire from insulators and lessening of the conductor on each pole then lowering down the conductor & rolling in to bundles.

4000

-

-

... More
Loading, carriage and unloading of conductor from store to work site and vice versa

1125

-

-

... More
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.

110

-

-

... More
Laying, stringing, tensioning and binding of Weasel conductor for H.T./L.T. O.H.

4000

-

-

... More
Laying, stringing, tensioning and binding of Dog conductor for H.T./L.T. O.H.

9000

-

-

... More
Fixing of guarding angle/guarding channel for laying of guarding

25

-

-

... More
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire

1200

-

-

... More
Cross laying of guarding by G.I. wire (approximate 5 lacing of each span)

20

-

-

... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.

20

-

-

... More
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.

30

-

-

... More
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.

1

-

-

... More
Making of L.T. Shackle point by brackets, clamps, G.I. Shackle strips and insulators, tightening of line, binding of conductors and proper connections.

3

-

-

... More
Fabrication/modifications of M.S. Items as per requirement of site conditions.

35

-

-

... More
Jumpering of H.T. Lines from the existing H.T.O.H. line.

20

-

-

... More
Jumpering of L.T. Lines from the existing L.T.O.H. line.

30

-

-

... More
Trimming of tree branches which are in range of line conductor to avoid breakdown, trimming due to tree branch (per tree) Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.

25

-

-

... More
Line Work (AB Cable)

-

-

-

... More
Dismantling of Aerial Bunched Cable from L.T. O/H (damage) line.

6000

-

-

... More
Loading, carriage and unloading of Aerial Bunched Cable from store to work site and vice versa.

6000

-

-

... More
Laying of Aerial Bunched Cable for Erection of L.T. O/H Line.

6000

-

-

... More
Taking out cable from drum.

6000

-

-

... More
Mounting & Erection of single phase distribution box.

300

-

-

... More
Mounting & Erection of three phase distribution box.

30

-

-

... More
Opening and reconnection of consumer connections for shifted/replaced of pole.

2100

-

-

... More
H.T. / L.T. Cable Work

-

-

-

... More
Taking out new/old cable from cable drum and then after transportation from store to work site or vice-versa.

-

-

-

... More
(a) H.T. Cable

250

-

-

... More
(b) L.T. Cable

25

-

-

... More
Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable-

-

-

-

... More
(a) Normal Soil

150

-

-

... More
(b) Kharanja Road

50

-

-

... More
(c) Metallic Road

50

-

-

... More
Laying of cable in the above digging, trench, covering with bricks, sand and back filling.

-

-

-

... More
(a) H.T. Cable

100

-

-

... More
(b) L.T. Cable

10

-

-

... More
Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling.

-

-

-

... More
(a) H.T. Cable

50

-

-

... More
(b) L.T. Cable

10

-

-

... More
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.

-

-

-

... More
(a) H.T. Cable

65

-

-

... More
(b) L.T. Cable

10

-

-

... More
Restoration of Metallic/RCC road after proper repairing with appropriate materials.

50

-

-

... More
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line :

-

-

-

... More
a) Single Core L.T. Cable

500

-

-

... More
b) 3 ½ Core L.T. Cable

200

-

-

... More
c) 11 KV H.T. Cable

200

-

-

... More
H.T. /L.T. P.B. & H.T./L.T. M.C. Work

-

-

-

... More
Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa.

2

-

-

... More
Erection of H.T. metering cubical on plinth as per standard norms.

2

-

-

... More
Construction of plinth for H.T. pilfer metering cubical.

2

-

-

... More
Dismantling of H.T. pilfer metering cubical.

1

-

-

... More
Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc.

4

-

-

... More
Earthing of supports/ metering cubical/ HTPB etc. as per standard specifications.

5

-

-

... More
Out Door Metering Unit Work

-

-

-

... More
Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa.

10

-

-

... More
Erection of O/D type Metering unit on D/P Structure.

10

-

-

... More
Connection of H.T. Jumper to HT Bushing of O/D type Metering unit.

10

-

-

... More
Distribution T/F work

-

-

-

... More
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.

4

-

-

... More
Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.

3

-

-

... More
Erection of Distribution T/F on plinth/D/pole structure.

3

-

-

... More
Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.

3

-

-

... More
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.

10

-

-

... More
Connection of L.T. cable from L.T.D.B to L.T.O.H.

10

-

-

... More
To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.

8

-

-

... More
Repairing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.

141

-

-

... More
Supply of 40mm dia Class 'B' G.I. Pipe 40' long including M.S. flat 50x6 mm along with all related materials required for distribution T/F earthing work and Boring 39' deep & connection of neutral bushing with G.I. Pipe through M.S. flat/earth wire with proper connection arrangement.

3

-

-

... More
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.

3

-

-

... More
Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.