Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Civil And Construction
Eprocure
Opening Date12 Mar 2024
Closing Date16 Apr 2024
Tender AmountRefer Documents
Costs
EMD
₹ 62,200Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KESCO_915578_1Bid Award Id
ViewTender No
56/Const./2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Grouting of pole with cement brick ballast and coarse sand as per standard specification.
26
-
-
... More
Making of pole plinth of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
26
-
-
... More
Painting of Steel Tubular Pole with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials.
26
-
-
... More
Earthing of supports as per standard specifications.
26
-
-
... More
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
52
-
-
... More
Fabrication/modifications of M.S. Items as per requirement of site conditions.
1529
-
-
... More
Taking out 11 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa.
8390
-
-
... More
Digging of Trench for laying of 11 KV and 33 KV cable in normal soil in size of 30 cm. wide and 1 to 1.5 meter deep.
500
-
-
... More
Digging of Trench for laying of 11 KV and 33 KV cable in kharanja soil in size of 30 cm. wide and 1 to 1.5 meter deep.
897
-
-
... More
Digging of Trench for laying of 11 KV and 33 KV cable in metallic road in size of 30 cm. wide and 1 to 1.5 meter deep.
3289
-
-
... More
Laying of 11 KV and 33 KV XLPE cable in above digged trench covering with bricks and back filling and proper ramming.
7990
-
-
... More
Laying of MS Pipe in digged trench.
100
-
-
... More
Laying of 11 KV and 33 KV XLPE Cable through M.S. pipe in digged trench.
100
-
-
... More
Making indoor/outdoor joints of 11 KV and 33 KV XLPE Cable where the cable is being laid.
302
-
-
... More
Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends with pipe provided by KESCo
302
-
-
... More
Making of Straight through joint
2
-
-
... More
Fixing of G.I. Pin and Pin Insulator on erected/existing double/tri/four pole.
24
-
-
... More
Making jumpers from cable box to line, cable support switchgear panels, section poles of each phase.
150
-
-
... More
Loading, Carriage of RMU
50
-
-
... More
Installation of RMU
50
-
-
... More
Making plinth and Grouting of RMU
50
-
-
... More
3 Ft chemical Earthing with material
100
-
-
... More
Energisation of RMU
50
-
-
... More
Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method.
20
-
-
... More
Laying of 33/11 KV 3x300/400/185 sq.mm XLPE through HDD Method and also marking feeder name on pipe with Paint at the interval of each 100 mtr.
300
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements