Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Feb 2024
Closing Date15 Mar 2024
Tender Amount₹ 15,35,664
Costs
EMD
₹ 15,500Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KESCO_903494_1Bid Award Id
ViewTender No
33/EUDC-IV/2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion.
90
-
-
Loading, Carriage and unloading of poles from store to work site.
90
-
-
Loading, Carriage and unloading of damaged poles from work site to store.
90
-
-
Grouting of pole with cement brick ballast and coarse sand as per Standard Specification.
90
-
-
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
90
-
-
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
120
-
-
Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of red oxide on full length of pole and then two coat of Aluminum paint upto X-arm from top including cost of paint and red oxide paint used should be ISI mark Ist class enamel paint.
90
-
-
Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.
4
-
-
Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.
4
-
-
Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)
4
-
-
Erection of Tri-Pole structure including fitting of channels etc. and proper alignment.
1
-
-
Erection of four pole structure including fitting of channels etc. as well as proper alignment of structure.
1
-
-
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.
20
-
-
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
20
-
-
Line Work (Conductor)
-
-
-
Dismantling of binding wire from insulators and lessening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
3000
-
-
Loading, carriage and unloading of conductor from store to work site and vice versa
630
-
-
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
120
-
-
Laying, stringing, tensioning and binding of Weasel conductor for H.T./L.T. O.H.
2200
-
-
Laying, stringing, tensioning and binding of Dog conductor for H.T./L.T. O.H.
4000
-
-
Fixing of guarding angle/guarding channel for laying of guarding
30
-
-
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire
900
-
-
Cross laying of guarding by G.I. wire (approximate 5 lacing of each span)
20
-
-
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
30
-
-
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
20
-
-
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.
4
-
-
Making of L.T. Shackle point by brackets, clamps, G.I. Shackle strips and insulators, tightening of line, binding of conductors and proper connections.
5
-
-
Fabrication/modifications of M.S. Items as per requirement of site conditions.
100
-
-
Jumpering of H.T. Lines from the existing H.T.O.H. line.
20
-
-
Jumpering of L.T. Lines from the existing L.T.O.H. line.
30
-
-
Trimming of tree branches which are in range of line conductor to avoid breakdown, trimming due to tree branch (per tree) Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.
2000
-
-
Line Work (AB Cable)
-
-
-
Dismantling of Aerial Bunched Cable from L.T. O/H (damage) line.
3000
-
-
Loading, carriage and unloading of Aerial Bunched Cable from store to work site and vice versa.
3000
-
-
Laying of Aerial Bunched Cable for Erection of L.T. O/H Line.
5000
-
-
Taking out cable from drum.
5000
-
-
Mounting & Erection of single phase distribution box.
90
-
-
Mounting & Erection of three phase distribution box.
80
-
-
Opening and reconnection of consumer connections for shifted/replaced of pole.
600
-
-
H.T. / L.T. Cable Work
-
-
-
Taking out new/old cable from cable drum and then after transportation from store to work site or vice-versa.
-
-
-
(a) H.T. Cable
300
-
-
(b) L.T. Cable
100
-
-
Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable-
-
-
-
(a) Normal Soil
150
-
-
(b) Kharanja Road
80
-
-
(c) Metallic Road
60
-
-
Laying of cable in the above digging, trench, covering with bricks, sand and back filling.
-
-
-
(a) H.T. Cable
100
-
-
(b) L.T. Cable
30
-
-
Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling.
-
-
-
(a) H.T. Cable
70
-
-
(b) L.T. Cable
30
-
-
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.
-
-
-
(a) H.T. Cable
70
-
-
(b) L.T. Cable
30
-
-
Restoration of Metallic/RCC road after proper repairing with appropriate materials.
50
-
-
Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
35
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line :
-
-
-
a) Single Core L.T. Cable
20
-
-
b) 3 ½ Core L.T. Cable
20
-
-
c) 11 KV H.T. Cable
50
-
-
H.T. /L.T. P.B. & H.T./L.T. M.C. Work
-
-
-
Loading, Carriage and unloading of H.T.P.B. form store to work site and then after erection on the relay constructed plinth.
2
-
-
Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa.
2
-
-
Erection of H.T. metering cubical on plinth as per standard norms.
2
-
-
Construction of plinth for H.T. pilfer metering cubical.
2
-
-
Dismantling of H.T. pilfer metering cubical.
2
-
-
Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc.
4
-
-
Earthing of supports/ metering cubical/ HTPB etc. as per standard specifications.
13
-
-
Out Door Metering Unit Work
-
-
-
Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa.
5
-
-
Erection of O/D type Metering unit on D/P Structure.
5
-
-
Connection of H.T. Jumper to HT Bushing of O/D type Metering unit.
5
-
-
Distribution T/F work
-
-
-
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
10
-
-
Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.
3
-
-
Erection of Distribution T/F on plinth/D/pole structure.
3
-
-
Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.
3
-
-
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
10
-
-
Connection of L.T. cable from L.T.D.B to L.T.O.H.
10
-
-
To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.
10
-
-
Repairing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.
10
-
-
Supply of 40mm dia Class 'B' G.I. Pipe 40' long including M.S. flat 50x6 mm along with all related materials required for distribution T/F earthing work and Boring 39' deep & connection of neutral bushing with G.I. Pipe through M.S. flat/earth wire with proper connection arrangement.
6
-
-
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.
10
-
-
Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.
6
-
-