Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Electrical and Electronics
Eprocure
Opening Date14 Mar 2024
Closing Date20 Mar 2024
Tender Amount₹ 49,12,961
Costs
EMD
₹ 50,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KESCO_917070_1Bid Award Id
ViewTender No
56/EUDC-I/2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Strengthening of damaged pole by providing and welding of pipe or angle by over lapping in the place of damaged portion.
400
-
-
Loading, Carriage and unloding of poles from store to work site.
55
-
-
Loading, Carriage and unloding of damaged poles from work site to store
40
-
-
Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
250
-
-
Loading carriage and unloding of conductor from store to work site and vice versa.
250
-
-
Erection of Old/new Steel Tubular pole for H.T. O.H./L.T. O.H. line and fitting of X-arms/L.T. Brackets, Insulators and other hardware fittings.
52
-
-
Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.
2600
-
-
Laying of Aearial Bunched Cable of damage Line after laying stringing of LT Line
2500
-
-
Loading carriage and Aearial Bunched Cable from store to work site and vice versa.
250
-
-
Laying of Aearial Bunched Cable for Erection of L.T. O/H Line
250
-
-
Mounting & Erection of single phase distribution box
10
-
-
Mounting & Erection of three phase distribution box
6
-
-
Opening & reconnection of consumer connection for shifted/replaced of pole.
4500
-
-
Re-sagging of conductor, on old line after erection of pole binding of conductor etc.
400
-
-
Earthing of supports/metering cubical /HTPB etc. as per standard specifications.
7
-
-
Erection of stud pole fly stay and fixing of stay wire etc. for complete erection.
5
-
-
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
8
-
-
Laying stringing, tensioning and binding of Weassel conductor for H.T./L.T. O.H.
110
-
-
Laying stringing, tensioning and binding of Dog conductor for H.T./L.T. O.H.
260
-
-
Laying stringing, tensioning and binding of earth G.I. wire.
260
-
-
Fixing of guarding angle/guarding channel for laying of guarding
5
-
-
Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span)
7
-
-
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
200
-
-
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
300
-
-
Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of redoxide on full length of Pole and then two coat of Alumium Paint upto X-arm from top including cost of Paint and reoxide /paint used should be ISI Mark Ist Class enamel Paint.
120
-
-
Making plinth of Single Pole of 400 m dia, 600mm. Height (200mm underground) with C.C. in ratio 1:4:8 of cement sand including cost of material.
680
-
-
Fabrication and ercetion of distribution T/F fencing of frame size 3×2.4 Mtr. Including cost of M.S. angle size 40×40×5 and M.S. flat size 35×5, fixing of welded steel wire fabric on steel frams by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed Paint to give bus green shade including evening of oil & dust.
20
-
-
Repairing of Distribution Transformer Fencing with all material and painting.
400
-
-
Taking out new/old cable from cable drum and then after tranportation from store to work site or vice-versa.
-
-
-
H.T. Cable
105
-
-
L.T. Cable
130
-
-
Digging of cable trench in size of 30cm. Wide and 60 to 90 Cm. meter deep as per site requirement for laying of cable-
-
-
-
Normal Soil
30
-
-
Kharanja Road
30
-
-
Metallic Road
125
-
-
Laying of cable in the above digging, trench, covering with bricks, sand and back filling.
-
-
-
H.T. Cable
100
-
-
L.T. Cable
90
-
-
Laying of HT/LT XLPE Cables For HDD Method
100
-
-
Laying of cable H.T. cable through Hume/C.I./MS. Pipe in digged trench and back filling.
-
-
-
H.T. Cable
10
-
-
L.T. Cable
10
-
-
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.
-
-
-
H.T. Cable
30
-
-
L.T. Cable
30
-
-
Restoration of Metallic/RCC road after proper reparing with appropriate materials.
330
-
-
Making of cable box for 11 KV 3×50 to 3×300sqmm. For XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
7
-
-
Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work
-
-
-
With pipe (3Mtr. Longs M.S. Pipe will be provided by KESCo.)
2
-
-
Without pipe
2
-
-
Making Plinth for H.T.P.B. by brick work in size of 1.2×1.2×1.0 meter as well as plastering of 12mm. Thick on all the exposed sides of the plinth.
2
-
-
Loading, Carriage and Unloading of H.T.P.B. from store to work site and then after erection on the relay constructed plinth.
2
-
-
Repairing of H.T.P.B.
10
-
-
Painting of H.T.P.B.
10
-
-
Construction of plinth for H.T. pilffer metering cubical.
2
-
-
Loading, Carriage and Unloading of H.T.M.C. from store to site or vice-versa.
2
-
-
Erection of H.T. metering cubical on plinth as per standard norms .
2
-
-
Dismentalling of H.T. pilffer metering cubical.
2
-
-
Erection of L.T. metering cubical as per standard norms and connection of L.T. cable including crimping of Lugs etc.
2
-
-
Grouting of Pole with cement brick ballast and coarse sand as per standard Specification.
400
-
-
Erection of double pole structure including fixing of T.P.M.O. (if available) Top Channel, Fuse set on fuse set channel etc.as per standard Specification.
2
-
-
Making of a double pole structure by erection single pole with a Specific distence from existing sinle pole on a running H.T. line, fixing of T.P.M.O.(if available) (Top channel, Fuse set Channel etc. as per standard Specification.)
2
-
-
Painting of double pole structure with one coat of red oxide and two coats of Alm. Paint above fuse set including cost os Ist Class enamel paint.
2
-
-
Errection of Tri-Pole structure including fitting of channels etc. and proper alignment.
1
-
-
Errection of Tri-Pole structure with one coat of red oxide and two coats of Alm. Paint from X-Arm to above including cost of Ist Class enamel paint.
1
-
-
Erection of four pole structure including fitting of channels etc.well as proper alignment of structure.
1
-
-
Painting of four pole structure with one coat of red oxide and two coats of Alm.Paint from X-arm to above including cost of Ist Class enamel paint.
1
-
-
Distribution T/F work
-
-
-
Loading carriage & unlodings of distribution Transformers (Up to 630 K.V.A.) from store to site & visa-versa.
2
-
-
Loading of distribution Transformers of following capacities at KESCo. Store/site and transportation of same from KESCo. Store/site to various sites of Division, KESCo sites including unloading and proper mounting on ground/plinth/double pole, transporting back the damaged transformer upto KESCo store including unloading and proper stacking in store keeper. As above work will be executed with the help of Loader & Chain Pulling System :- From up to 630 KVA.
2
-
-
Erection of Distribution T/F on plinth/D/pole structure.
2
-
-
Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer.
2
-
-
Fitting of L.T.D.B. by brackets & clamps on double pole structure & L.t. Cable Connection from T/F Cable to L.T.D.B.
2
-
-
Erection of O/D type Metering unit:-
-
-
-
Loading carriage & unlodings of O/D type metering unit from store to site & visa-versa.
2
-
-
Loading carriage & unlodings of pilfer proof metering cubical box store to site and visa-versa.
30
-
-
Erection of O/D type metering unit on D/P structure.
2
-
-
Connection of H.T. Jumper to H.T. Bushing of O/D type Metering unit.
2
-
-
Making of H.T. section points by brackets, clamps, & Insulater, tightening of Line, binding of conductor & proper connection.
80
-
-
Making of L.T.Shackle points by brackets, clamps, G.I. Shakle strips & Insulater, tightening of Line, binding of conductor & proper connection.
30
-
-
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.
2
-
-
Shifting of T/F from ground to plinth and reconnection of H.T./L.T. Lines as well as earthing for proper completion.
2
-
-
The work of cutting and pruning of 11500 tree (all branches) branches standing near various HT and LT lines established under the division of Phoolbagh, Aaloomandi, Nawabganj, Zareebchowki and Electricity House.
10000
-
-
Work of lifting the tree branches on the road.
10000
-
-
Febrication /modifications of M.S. items as per requirment of site conditions.
75
-
-
Jumpering of H.T. Lines from existing H.T. O/H line.
160
-
-
Jumpering of L.T. Lines from existing L.T. O/H line.
160
-
-
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line:
-
-
-
Single Core L.T. Cable
30
-
-
3½ Core L.T. Cable
10
-
-
11KV. H.T. Cable
17
-
-
Supply of 40mm. Dia Class'B' G.I. Pipe 40' long including M.S. flat 50×6mm. Along with all related materials required for distribution T/F earthing work.
60
-
-
Boring 39' deep & connection of neutral busing with G.I. Pipe through M.S. flat/earth wire with proper connection arrangement.
60
-
-
Construction of T/F plinth, suitable for mounting of distribution transformer size of the plinth will be 1.2×1.2×1.2 meter solid with brick work. 75mm. Thick C.C. in ratioo 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75mm. Thick done on all the exposed sides to the plinth.
9
-
-
Repairing of transformer plinth size of plinth will be 1.2x1.2x1.2 mtr. solid with brick work. 75mm. Thick C.C. in ratioo 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75mm. Thick done on all the exposed sides to the plinth.
75
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements