Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Eprocure
Opening Date14 Jul 2020
Closing Date18 Aug 2020
Tender Amount₹ 8,94,662 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading, Carriage and unloading of poles from store to work site.

50

-

-

... More
Loading, Carriage and unloading of damaged poles from work site to store.

50

-

-

... More
Dismentalling of binding wire from insulators and loosening of the conductor on each pole then lowering down the conductor & rolling in to bundles.

160

-

-

... More
Loading, carriage and unloading of conductor from store to work site and vice versa

160

-

-

... More
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.

100

-

-

... More
Dismentalling of Aerial Bunched Cable from L.T./H.T. O/H (damage) line.

100

-

-

... More
Loading, carriage and unloading of Aearial Bunched Cable (HT/LT) from store to work site and vice versa.

100

-

-

... More
Laying of Aerial Bunched Cable for Erection of L.T./HT O/H Line.

100

-

-

... More
Mounting & Erection of single phase distribution box.

40

-

-

... More
Mounting & Erection of three phase distribution box.

20

-

-

... More
Opening and reconnection of consumer connections for shifted/replaced of pole.

40

-

-

... More
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.

10

-

-

... More
Earthing of supports/ metering cubical/ HTPB/ACB etc. as per standard specifications.

40

-

-

... More
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.

8

-

-

... More
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.

40

-

-

... More
Laying, stringing, tensioning and binding of Weasel conductor for H.T./L.T. O.H.

200

-

-

... More
Laying, stringing, tensioning and binding of Dog conductor for H.T./L.T. O.H.

200

-

-

... More
Fixing of guarding angle/guarding channel for laying of guarding

6

-

-

... More
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire

500

-

-

... More
Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span)

4

-

-

... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.

20

-

-

... More
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.

20

-

-

... More
Painting of Steel Tubular Poles after rubbing, cleaning with emery paper and coating one coat of redoxide on full length of pole and then two coat of Aluminum paint upto X-arm from top including cost of paint and redoxide paint used should be ISI mark Ist class enamel paint.

50

-

-

... More
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.

50

-

-

... More
Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.

4

-

-

... More
Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe.

4

-

-

... More
Fabrication and erection of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust.

4

-

-

... More
Taking out new/old cable from cable drum and then after transportation from store to work site or vice-versa.

-

-

-

... More
H.T. Cable

60

-

-

... More
L.T. Cable

40

-

-

... More
Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable-

-

-

-

... More
Normal Soil

20

-

-

... More
Kharanja Road

20

-

-

... More
Metallic Road

36

-

-

... More
Laying of cable in the above digging, trench, covering with bricks, sand and back filling.

-

-

-

... More
H.T. Cable

40

-

-

... More
L.T. Cable

40

-

-

... More
Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling.

-

-

-

... More
H.T. Cable

16

-

-

... More
L.T. Cable

16

-

-

... More
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.

-

-

-

... More
H.T. Cable

40

-

-

... More
L.T. Cable

40

-

-

... More
Laying, stringing, tensioning & final sagging of 11 kV XLPE Cable (Size 3x50 to 3x300 Sq.mm) pole to pole as O/H line.

40

-

-

... More
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.

2

-

-

... More
Laying of Cable through trench less method

20

-

-

... More
Restoration of Metallic/RCC road after proper repairing with appropriate materials.

20

-

-

... More
Making of HT AB Cable box/cable box for 11/6.6 kV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)

2

-

-

... More
Mounting of HT AB Cable box/cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends.

-

-

-

... More
With pipe (3Mtr. Long MS pipe will be provided by KESCo)

2

-

-

... More
Without pipe

2

-

-

... More
Making Plinth for H.T.P.B./A.C.B. By brick work in size of 1.2x1 .2x1.0 meter for HTPB and as per requirement for ACB as well as plastering of 12 mm thick on all the exposed sides of the plinth.

2

-

-

... More
Loading, Carriage and unloading of H.T.P.B./ACB form store to work site and then after erection on the relay constructed plinth.

2

-

-

... More
Making Plinth for L.T. P.B. By brick work in size of 1.2x0.75x1.0 meter as well as plastering of 12mm thick on all the exposed sides of the plinth.

2

-

-

... More
Loading, Carriage and unloading of L.T.P.B. form store to work site and then after erection on the relay constructed plinth.

2

-

-

... More
Construction of plinth for H.T. pilfer metering cubical.

2

-

-

... More
Loading, carriage and unloading of H.T.M.C. from store to site or vice-versa.

2

-

-

... More
Erection of H.T. metering cubical/ACB on plinth as per standard norms.

2

-

-

... More
Dismentalling of H.T. pilfer metering cubical/ACB

2

-

-

... More
Erection of L.T. metering cubical as per standard norms and connection of L.T. Cable including crimping of Lugs etc.

2

-

-

... More
Grouting of pole with cement brick ballast and coarse sand as per Standard Specification.

20

-

-

... More
Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.

4

-

-

... More
Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)

4

-

-

... More
Painting of double pole structure with one coat of red oxide and two coats of Alm. Paint above fuse set including cost of Ist Class enamel paint.

4

-

-

... More
Erection of Tri-Pole structure including fitting of channels etc. and proper alignment.

2

-

-

... More
Painting of Tri-Pole structure with one coat of red oxide and two coats of Alm. Paint from X-arm to above including cost of Ist Class enamel paint.

2

-

-

... More
Erection of four pole structure including fitting of channels etc. as well as proper alignment of structure.

2

-

-

... More
Painting of four pole structure with one coat of red oxide and two coats of Alm. Paint from X-arm to above including cost of Ist Class enamel paint.

2

-

-

... More
Distribution T/F work

-

-

-

... More
Loading, carriage & unloading of distribution Transformers (Up to 630 kVA.) from store to site & vise-versa.

4

-

-

... More
Erection of Distribution T/F on plinth/D/pole structure.

4

-

-

... More
Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer.

4

-

-

... More
Fitting of L.T. D.B./A.C. Breakers by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.

4

-

-

... More
Connection of L.T. cable from L.T.D.B/ A.C. Breakers to L.T.O.H.

4

-

-

... More
Erection of O/D type Metering unit :-

-

-

-

... More
Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa.

2

-

-

... More
Erection of O/D type Metering unit on D/P Structure.

2

-

-

... More
Connection of H.T. Jumper to HT Bushing of O/D type Metering unit.

2

-

-

... More
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.

4

-

-

... More
Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.

4

-

-

... More
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.

4

-

-

... More
Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.

4

-

-

... More
Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.

16

-

-

... More
Fabrication/modifications of M.S. Items as per requirement of site conditions.

80

-

-

... More
Jumpering of H.T. Lines from the existing H.T.O.H. line.

30

-

-

... More
Jumpering of L.T. Lines from the existing L.T.O.H. line.

30

-

-

... More
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line :

-

-

-

... More
Single Core L.T. Cable

40

-

-

... More
3 ½ Core L.T. Cable

40

-

-

... More
11 kV H.T. Cable

40

-

-

... More
Supply of 40mm dia Class 'B' G.I. Pipe 40' long including M.S. flat 50x6 mm along with all related materials required for distribution T/F earthing work.

4

-

-

... More
Boring 39' deep & connection of neutral bushing with G.I. Pipe through M.S. flat/earth wire with proper connection arrangement.

4

-

-

... More
Providing of one jeep gang with T & P on duty on special accessories.

3

-

-

... More
Providing one pedal gang with T & P on duty on special accessories.

3

-

-

... More
Digging by JCB for making straight through joint.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.