Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Eprocure
Opening Date23 Jul 2020
Closing Date28 Aug 2020
Tender Amount₹ 7,00,000
Costs
EMD
₹ 7,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KESCO_495582_1Bid Award Id
ViewTender No
20/Const./2020-21Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Taking out L.T. A.B. Cable from cable drum and then after transportation from store to work site or vice-versa.
5500
-
-
Loading, Carriage and unloading of all other items except mentioned above from store to site and vice versa
1
-
-
Erection of Single S.T. Pole as per standard specifications
70
-
-
Grouting of pole with cement brick ballast and coarse sand as per standard specification.
70
-
-
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
70
-
-
Painting of S.T. pole with one coat of red oxide and two coats of Alm. Paint above fuse set including cost of ISI mark Ist Class enamel paint.
70
-
-
Earthing of supports as per standard specifications.
70
-
-
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
20
-
-
Chopping of tree branches lying in the route of newly erected line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.
70
-
-
Laying of AB cable as L.T.O.H. line fixing of Clamp with Eye Hook & suspension Clamp etc.
5500
-
-
Mounting & Erection of single phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
30
-
-
Mounting & Erection of three phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
20
-
-
Opening and reconnection of consumer connections after replacement of line/ pole etc.
500
-
-
L/C for strengthening of damaged pole by providing and welding of pipe or angle by overlapping in the place of damaged portion.
20
-
-
Stringing, tensioning and sagging of ACSR Dog conductor
100
-
-
Excavation of ST pole (Old & Used) from ground by digging the pit or by cutting with gas cutter and its proper stacking.
10
-
-
Loading, carriage, fabrication and modification of M.S. Item from Store to work site
42
-
-
Opening of H.T. Jumpers from the existing 3-Phase 3-Wire H.T. O.H. line for erection work.
20
-
-
Making of H.T. Jumpers from the existing 3-Phase 3-Wire H.T. O.H. line for erection work.
20
-
-
Making of H.T. Section Point
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements