If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date12 Mar 2024
Closing Date16 Apr 2024
Tender AmountRefer Documents
Costs
EMD
₹ 10,400Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KESCO_915586_1Bid Award Id
ViewTender No
57/Const./2023-24Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane
4
-
-
5/3/1.5 MVA, 33/11/6.6 KV T/F
4
-
-
Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking.
-
-
-
5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane
4
-
-
Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer.
-
-
-
10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane
4
-
-
5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane
4
-
-
Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance.
-
-
-
10/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane &trolla
4
-
-
5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane &trolla
4
-
-
Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work.
-
-
-
10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane
4
-
-
Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond.
4
-
-
Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish.
4
-
-
Supply of GI Pipe 40mm dia B-Class 80 feet long with socket cutter with loading unloading.
4
-
-
Construction of DELTA using MS round BAR 3 MTR long 40 MM dia along with supply and required fabrication work with interconnection between MS bar
4
-
-
Boring and lowering of 80 feet G.I. Pipe along with all coupling and jointing required for each power transformer
4
-
-
Connecting of deep bore earthing 80 feet deep GI pipe to transformer body/neutral/ switch gear panel and Delta arrangement with the help of MS strip 50x6 mm by cutting ,shaping and welding including cost of material.
4
-
-
L/c for Earthing of Existing Structure by extending the existing M.S. Flat with main earthmate by welding provided by contractor.
15
-
-
Digging of trench for laying of cable in different situations as per site requirement.
-
-
-
In Normal Soil.
240
-
-
In Kharanja Road.
60
-
-
Laying of 11 KV 3x300 sq.mm XLPE cable in above digged trench covering with bricks and back filling and proper ramming and also marking feeder name on cable with Paint at the interval of each 100 mtr.
300
-
-
Making indoor/outdoor joints of 33 KV 3x300 mm2. Cable where the cable is being laid. Jointing Kit will be provided by the Department.
12
-
-
Mounting of cable box on double pole/cable support structure.
6
-
-
Dismentalling of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
4
-
-
Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
4
-
-
Dismentalling of Neutral Support Structure
4
-
-
Dismentalling of Cable Support Structure
4
-
-
Transportation Charges of T/F oil from store to site or vice versa.
4000
-
-
Filling of OIL in Power Transformer
4
-
-
Fitting of CT/PT junction box
4
-
-
Making all control cable connection in C.T., VCB mechanism, C.T. Junction Box, Transformer Control relay panel D.C. Battery Charger, ACDB Transformer indication board 11KV switchgear including proper termination ferruling and dressing with related work whichever is required including T/F work.
2
-
-
Filling of soil for leveling of S/S Switch yard as per site requirement.
100
-
-
Final leveling of yard and removal of wastage material and soil from switch yard.
2
-
-
Painting of all existing/new MS structures on the concerned bay including gantry
4
-
-
Repairing/construction of plinths of all existing MS structures
4
-
-
Mounting of cable box on pole, Cable support structure or 11 kV panel with handling of concerning cable and its proper fixing. (Without Pipe)
6
-
-
T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening.
4
-
-
Providing and fabrication with fitting of copper busbar for making L connection for T/F Bushing .
28
-
-
Making jumpers from cable box to line, cable support switchgear panels, section poles of each phase.
18
-
-
Supply and erection of AC Distribution Box with complete wiring
1
-
-
Supply and erection of DC Distribution Box with complete wiring
1
-
-
Carriage of all concerning stock material except mentioned above in items from Kesco. Store to site or vice-versa.
1
-
-