Kanpur Electricity Supply Company Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Cable and Wires
Eprocure
Opening Date9 Sep 2020
Closing Date22 Sep 2020
Tender Amount₹ 18,89,294 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 22,500Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KESCO_509352_1Bid Award Id
ViewTender No
25/Const./2020-21Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Loading Carriage and unloading of Jarjar AB Cable from work site to store.
1800
-
-
Loading, Carriage and unloading of all other items except mentioned above from store to site and vice versa.
1
-
-
Erection of Single S.T. Pole as per standard specifications
157
-
-
Repairing of damage S.T. Pole by providing 1 mtr. long 3 No. MS Angle 50x50x6 mm or round pipe in two peaces to round up damaged portion of pole alongwith clamping at two point and also strengthen the damaged pole by welding.
68
-
-
Grouting of pole with cement brick ballast and coarse sand as per standard specification.
157
-
-
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
225
-
-
Painting of S.T. pole with one coat of red oxide and two coats of Alm. Paint above fuse set including cost of ISI mark Ist Class enamel paint.
225
-
-
Earthing of supports as per standard specifications.
225
-
-
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.
49
-
-
Chopping of tree branches lying in the route of newly erected line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.
200
-
-
Laying of AB cable as L.T.O.H. line fixing of Clamp with Eye Hook & suspension Clamp etc.
19975
-
-
Mounting & Erection of single phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
350
-
-
Mounting & Erection of three phase distribution box with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.
52
-
-
Opening and reconnection of consumer connections after replacement of line/ pole etc.
2500
-
-
Dismentalling of existing LT O/H weasel conductor line making into bundle then transporting to kesco., store.
23336
-
-
Dismentalling of existing G.I.wire line
700
-
-
Dimsmentalling of existing Jarjar A.B. Cable line.
2000
-
-
Erection of LT Circuit of existing Double pole
10
-
-
Opening of L.T. Jumpers from the existing 3-Phase 4-Wire L.T. O.H. line for erection work.
150
-
-
Making of L.T. Jumpers from the existing 3-Phase 4-Wire L.T. O.H. line for erection work.
150
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements