Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date19 Jan 2025
Closing Soon28 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of S.T. Single/Stud Pole including fitting of all material.

45

-

-

... More
Erection of Single PCC Pole including of all fitting.

60

-

-

... More
Erection of Double pole structure as per standard specifications including fitting of all material. (Cross bracings, Top Channel, Bottom Channel etc.)

15

-

-

... More
Erection of Double pole structure from existing Single Pole including fitting of M.S. Channel and other accessories etc.

5

-

-

... More
Grouting of ST pole with cement brick ballast and coarse sand as per standard specification including cost of all material.

80

-

-

... More
Grouting of PCC pole with cement brick ballast and coarse sand as per standard specification including cost of all material.

60

-

-

... More
Making of pole plinth of 400 mm dia, 400 mm height with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.

80

-

-

... More
Fabrication/modifications of M.S. Items as per requirement of site conditions.

800

-

-

... More
Painting of double pole including all fitting of M.S.structures with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials.

15

-

-

... More
Painting of Steel Tubular Pole including all fitting of M.S.structures with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials.

45

-

-

... More
Dismantling of ST Pole including all fitting such as V-Type X-arm/M.S Channel/ Guarding Angle/LT Bracket, insulators etc.

20

-

-

... More
Earthing of poles as per standard specifications.

35

-

-

... More
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.

25

-

-

... More
Loading, Carriage and unloading of ACSR Dog/Weasal Conductor from store to work site or vice-versa.

700

-

-

... More
Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa.

100

-

-

... More
Laying, stringing, tensioning & final sagging of 3 Phase 3 Wire H.T. O.H. line.

500

-

-

... More
Laying, stringing, tensioning & final sagging of 3 Phase 4 Wire L.T. O.H. line.

200

-

-

... More
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire including of cross lacing in every 2.5 mtr.

500

-

-

... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.

20

-

-

... More
Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work.

20

-

-

... More
Loading, Carriage and unloading of HT (3*70 sqmm to 3*300 sqmm) cable from store to work site or vice-versa.

300

-

-

... More
Loading, Carriage and unloading of LT (3.5*70 sqmm to 3.5*400 sqmm) cable from store to work site or vice-versa.

500

-

-

... More
Digging of Trench for laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable in normal soil in size of 30 cm. wide and 0.5 to 1.5 meter deep.

300

-

-

... More
Digging of Trench for laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable in kharanja soil in size of 30 cm. wide and 0.5 to 1.5 meter deep.

300

-

-

... More
Digging of Trench for laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable in metallic road in size of 30 cm. wide and 0.5 to 1.5 meter deep.

200

-

-

... More
Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable in digged trench covering with bricks and back filling and proper ramming.

250

-

-

... More
Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable through GI/MS/HDPE pipe in digged trench.

95

-

-

... More
Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE through HDD Method With GI/MS/HDPE Pipe (Pipe will be provided by Contrator)

100

-

-

... More
Laying of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE through HDD Method Without Pipe

450

-

-

... More
Laying of HT 3x70 mm2 Cable Over head (Pole to Pole) with Fixing of Holding Clamp on existing /newly erected ST Pole with stay wire

200

-

-

... More
Laying of HT 3x185 mm2 Cable Over head (Pole to Pole) with Fixing of Holding Clamp on existing /newly erected ST Pole with stay wire

100

-

-

... More
Laying of HT 3x300 mm2 Cable Over head (Pole to Pole) with Fixing of Holding Clamp on existing /newly erected ST Pole with stay wire

100

-

-

... More
Making indoor/outdoor joints of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable where the cable is being laid.

40

-

-

... More
Making straight through joint of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable where the cable is being laid.

7

-

-

... More
Mounting of LT/HT ((3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable on pole..

20

-

-

... More
Mounting of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) XLPE Cable through GI/MS/HDPE pipe

10

-

-

... More
Loading, carriage and unloading of Aearial Bunched Cable all size from store to work site or vice-versa.

1000

-

-

... More
Laying of LT Aerial Bunched Cable including fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Pole etc.

1000

-

-

... More
Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.

60

-

-

... More
Mounting & Erection of three phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.

30

-

-

... More
Opening and reconnection of consumer service connections after replacement of line/ poles etc.

350

-

-

... More
Loading, Carriage and unloading of Distribution T/F upto 630 KVA from store to site or vice-versa

7

-

-

... More
Erection of Distribution T/F upto 630 KVA on plinth/double pole structure.

7

-

-

... More
Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer.

7

-

-

... More
Fitting of L.T. D.B./LT CKT by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B./LT CKT.

7

-

-

... More
Connection of L.T. cable from L.T.D.B/LT CKT. to L.T.O.H.

7

-

-

... More
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.

5

-

-

... More
Making of H.T. Jumpers with 3 Phase 3 Wire H.T. O.H. line after erection of work.

20

-

-

... More
Making of L.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.

6

-

-

... More
Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.

5

-

-

... More
Dismantling of LT/HT (3*70 sqmm/3.5*70 sqmm to 3*400 sqmm/3.5*400 sqmm) cable on each pole then lowering down the cable & rolling into bundles.

200

-

-

... More
Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work.

20

-

-

... More
Chopping of tree branches lying in the route of HT/LT line touching the tree branches to the phase line conductor making fault to the feeder, for 75mm dia to 450mm dia or as per requirement of site.

200

-

-

... More
Digging of pit and making of 300x300x450 mm chamber with brick & sand work covered with RCC surrounding the GI Pipe with Cover. all material shall be provided by contractor with cost of all material.

14

-

-

... More
Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia, Thickness minimum 3 mm, B-Class 80 feet long with socket cutter and connection of pipe to distribution T/F Neutral or Body with 25x3mm G.I. Strip of length 80 feet inside the GI pipe, 100 Kg Salt and 100 Kg charcoal Powder for each earthing. all material shall be provided by contractor with cost of all material.

14

-

-

... More
Fabrication, erection & grouting of T/F fencing of frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting fo two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust.

210

-

-

... More
Connecting of newly erected network with Kesco mains including testing, commissioning and energization of the same completely.

15

-

-

... More
Stringing of Single Core L.T. Cable

500

-

-

... More
Stringing of 3 ½ Core L.T. Cable

500

-

-

... More
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:3:6 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.

8

-

-

... More
Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method.

15

-

-

... More
Fixing of danger board on erected poles including fitting of all material.

50

-

-

... More
Construction of plinth for H.T. pilfer metering cubical.

8

-

-

... More
Loading, Carriage and unloading of H.T. metering cubical from store to site or vice-versa

8

-

-

... More
Loading, Carriage and unloading of H.T. O/D type metering unit all range from store to site or vice-versa

8

-

-

... More
Erection of O/D type metering unit on D/P structure

8

-

-

... More
All electrical Connection of O/D unit and Metering cubical as per standard norms.

8

-

-

... More
Erection of H.T. metering cubical on plinth as per standard norms.

8

-

-

... More
Digging of pit and making of 300x300x450 mm chamber with brick & sand work covered with RCC surrounding the GI Pipe with Cover for Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia, Thickness minimum 3 mm, B-Class 60 feet long with socket cutter and connection of pipe to distribution Transformer or O/D unit and metering cubical Neutral or Body with 25x3mm G.I. Strip of length 60 feet inside the GI pipe, 100 Kg Salt and 100 Kg charcoal Powder for each earthing. all material shall be provided by contractor with cost of all material.

16

-

-

... More
Fixing of T.P.M.O on D/P structure.

17

-

-

... More
Making and Fixing of D.O. fuse set/ H.T. fuse on D/P structure.

17

-

-

... More
Loading, Carriage and unloading of 11 KV VCB Panel from store to work site

8

-

-

... More
Erection & Installation of 11 KV VCB Panel in control room including construction of Plinth.

8

-

-

... More
Earthing of VCB Panel in control room with 50 x 5 mmsq GI Strip ( All materail Shall be provided by contractor)

8

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.