Kanpur Electricity Supply Company Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date2 Jun 2023
Closing Date9 Jun 2023
Tender Amount₹ 15,49,716 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismentalling of Damaged S.T. Pole of very Critical Position with the help of crane after remaving all the accessories from damged pole and its all related wotk including digging of pit or by cutting with gas cutter.

18

-

-

... More
Grouting of pole with cement brick ballast and coarse sand as per standard specification.

39

-

-

... More
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.

39

-

-

... More
Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paint including cost of Ist Class enamel paint.

39

-

-

... More
Erection of four pole structure by digging of pit by hydra

1

-

-

... More
Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications.

39

-

-

... More
Fabrication/modification of MS Item as per requirement of site

1917

-

-

... More
Fixing of MS Channel (100x50x6 )mm 2.4 / 2.8/ 0.35 mtr. Long/T-off

61

-

-

... More
Making 33 KV Straight Through joint including digging of pit upto 1.1 Mtr. Depth.

12

-

-

... More
Taking out 33kv and 11 kV 3x70 to 3x300 XLPE Cable/LT Cable except service cable from cable drum before laying and transportation of the cables from store to work site or vice-versa.

882

-

-

... More
Laying of M.S. Pipe in above Digged Trench.

80

-

-

... More
Laying of cable through above laid M.S. Pipe.

80

-

-

... More
Laying of XLPE cables of all sizes except service cables in above digged trench covering with bricks and back filling or in RCC/RBC trench constructed by PWD/UPBCL as per standard specification and upto Pole.

710

-

-

... More
Laying of 33 KV/11 KV XLPE cable by H.D.D. method

100

-

-

... More
Making indoor/outdoor joints of 33KV/11KV 3x300 sqmm. Cable where the cable is being laid. Jointing Kit will be provided by the Department.

21

-

-

... More
Mounting of cable box on pole, cable support structure with handling of concerning cable and proper fixing (With G.I. pipe of 3 metre )

36

-

-

... More
Laying of G.I. Pipe of 40/50 mm dia along with digging of trench of suitable depth

35

-

-

... More
Chopping of tree branches lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site.

60

-

-

... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.

35

-

-

... More
Opening of L.T. Jumpers

20

-

-

... More
Making of H.T. Jumpers from 3 Phase 3 Wire H.T. O.H. line for erection work.

35

-

-

... More
Making of L.T. Jumpers from 3 Phase 3 Wire L.T. O.H. line for erection work.

20

-

-

... More
Mounting of 11 kV Pin Insulator/Disc Insulator

141

-

-

... More
Erection of 11 kV Disc Fitting

42

-

-

... More
Dismentalling & Shifting of transformers along with new plinth or foundation, fencing and two no of deep bore 40 feet earthing as per standard specification

2

-

-

... More
Supply and Fixing concrete Stone Route marker of 300 mm width x 150 mm thick x 650 mm height embedded in earth at least 300 mm below and 350 mm above ground level at every 100 m along the length of the cable with RCC concreting as per standard specification.

20

-

-

... More
Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixed conductor & rolling into bundles.

800

-

-

... More
Dismantling of M.S. Channel/X-arm/Guarding angle

40

-

-

... More
Dismantling of L.T. A.B. Cable and rolling into bundles

120

-

-

... More
Erection of Drop out fuse set as per standard specification.

2

-

-

... More
Erection of Earth Rod complete.

39

-

-

... More
Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc.

66

-

-

... More
Loading, Carriage and unloading of ACSR Dog/Panther Conductor from store to work site or vice-versa.

1263.8

-

-

... More
Laying, Stringing & Tensioning of ACSR Dog Conductor for making jumpers on riser.

2500

-

-

... More
Erection of Bracing set

13

-

-

... More
Loading, Carriage and unloading of earth wire/G.I. Wire from store to work site or vice-versa.

650

-

-

... More
Laying, Stringing, tensioning & final sagging of earth wire/G.I. Wire.

474

-

-

... More
Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span).

15

-

-

... More
Loading, carraiage and unloading of Aerial bunched cable from store to work site or vice-versa.

220

-

-

... More
Laying of L.T. Aerial bunched cable including fixing suspension clamp with Eye Hook, Dead End Clamp with Eye Hook on erected S.T. Pole etc.

100

-

-

... More
Mounting & Erection of Three Phase distribution box of A.B. Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc.

4

-

-

... More
Digging of cable trench for taking out old/damged XLPE/PILCA, 3x50 to 3x300 sq.mm 33/11 KV cable & taking out the above cable from digged trench and back filling of digged trench and relaying the same cable.

300

-

-

... More
Making riser from existing earth mate of control room for making earthing support to newly erected 33 KV D/P in control room.

2

-

-

... More
Making H.T. Section points by brackets, clamps & insulator, Tightening of Line, binding of conductor & proper connection.

15

-

-

... More
Dismentalling of jumpering from cable box to line, cable support switchgear panels.

15

-

-

... More
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.

10

-

-

... More
Restoration of metallic/RCC road after proper repairing with appropriate materials.

350

-

-

... More
Making L.T. Section point in L.T. New or existing line.

10

-

-

... More
Laying of L.T. XLPE cable with HDPE pipe and also marking feeder name on pipe with paint HDPE Pipe provided by contractor.

80

-

-

... More
Laying of L.T. XLPE cable without HDPE pipe and also marking feeder name on pipe with paint.

80

-

-

... More
Repairing of damged S.T. pole by providing M.S. Angle 50x50x6 mm, 3 Nos. each of 1 Mtr. Long by clamping at 2 points its welding including its all realted work.

10

-

-

... More
Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely.

4

-

-

... More
Carriage of all concerning stock material from KESCo Store to site or vice-versa.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.