Kanpur Electricity Supply Company Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Electricity Supply Company Limited - KESCO Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date25 Jan 2025
Closing Date12 Feb 2025
Tender AmountRefer Documents
Costs
EMD
₹ 24,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KESCO_998316_1Tender No
04/S.E.Tech/2024-25Tender Authority
Kanpur Electricity Supply Company Limited ViewPurchaser Address
-Website
http://https://kesco.co.in/wss/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Painting of pole including Cost of paint provided by contractor
10
-
-
... More
Laying, stringing, tensioning & final sagging of ACSR Dog Conductor for O.H. line.
300
-
-
... More
providing and Fixing of Danger board & Barbed wire by contractor
10
-
-
... More
Fixing of cross arm angle and top channel
2
-
-
... More
Earthing of pole
10
-
-
... More
Fixing of stay including civil materials as per requirement of site
3
-
-
... More
Making of indoor/outdoor cable box
20
-
-
... More
proper fixing of 3 mtr GI pipe with cable clamp for cable support
8
-
-
... More
Digging and restoration of trench (size 1X1 Mtr) with laying of 11kv
70
-
-
... More
Laying of HT XLPE cable (Size 3 x 185 Sq mm) in trench
180
-
-
... More
Loading carriage and unloading with installation of VCB from store
3
-
-
... More
Earthing of VCB Panel in control room with 50 x 5 mmsq GI Strip ( All materail Shall be provided by contractor)
3
-
-
... More
Highway crossing and underground laying cable work by HDD
540
-
-
... More
Making of restoration of trench on footpath side
260
-
-
... More
Pit for H.T. Cable Laying by HDD Method size 2X2X2 Meter
6
-
-
... More
H.T Cable Laying by IHDD Method
540
-
-
... More
Laying of HDPE Pipe for H.T Cable Highway Crossing
540
-
-
... More
Erection of Double pole structure as per standard specifications including fitting of all material for HT Metering .
2
-
-
... More
Erection of O/D type metering unit on D/P structure
1
-
-
... More
All electrical Connection of O/D unit and Metering cubical as per standard norms.
1
-
-
... More
Erection of H.T. metering cubical on plinth as per standard norms.
1
-
-
... More
Digging of pit and making of 300x300x450 mm chamber with brick & sand work covered with RCC surrounding the GI Pipe with Cover for Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia, Thickness minimum 3 mm, B-Class 60 feet long with socket cutter and connection of pipe to O/D unit and metering cubical Neutral or Body with 25x3mm G.I. Strip of length 60 feet inside the GI pipe, 100 Kg Salt and 100 Kg charcoal Powder for each earthing. all material shall be provided by contractor with cost of all material.
2
-
-
... More
loading carriage and unloading of all material from store to work site. (Except VCB’s)
1
-
-
... More
Connection of newly laid cable with network including
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements