Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Agriculture or Forestry Works
Eprocure
Opening Date5 Nov 2018
Closing Date16 Nov 2018
Tender Amount₹ 12,86,715
Costs
EMD
₹ 26,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPKDA_237340_4Bid Award Id
ViewTender No
22/Udyan/18-19Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Fertilizers
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
37.76
258
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete
28.32
210
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
28.32
342
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
7.55
2693
356.8
Maintenance of plants for first year (Chemical Manure & Insectisides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
37.76
258
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
28.32
210
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
28.32
342
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
7.55
2693
356.8
Maintenance of plants for second year (Chemical Manure & Insectiesides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
75.52
517
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage aetc. all complete.
56.64
421
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
56.64
685
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
7.55
2693
356.8
Maintenance of plants for Third year (Chemical Manure & Insectivesides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
151.04
1034
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
113.28
843
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
56.64
685
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
7.55
2693
356.8
Supply and fixing of two ply barbed wire fencing 7 rows straight and two diagonal with cost of material, labour T & P all complete. (Without G.S.T.)
569.9
38753
68
Providing and fixing R.C.C Post of 0.15x0.10x1.80m size all complete. As per KDA design using 4 Nos of 8 mm dia 1.75 mm long bar 6 mm dia 8 Nos rings and 7 hooks for barded wire RCC Mix 1:2:4 (Cement : C sand : 20 mm stone grit) with letter Writing and grouting. (Distance Between 2 Post= 3M) (Without G.S.T.)
215
114810
534
Part B Non Taxable Item
-
-
-
Site Survey complete with measuring outer boundry of site and marking points for Plantation.
1888
75
0.04
Digging of pits following size
-
-
-
0.60mx0.60mx0.60m
1888
44858
23.76
Supply and mixing of F.Y.M. (@0.03Cum/Plant) including, loading, unloading, cartage etc. all complete.
56.64
24072
425
Providing well developed Plants of below mentioned Species of 8 ft Average Height
1888
158592
84
Delonix regia/Cassia siamea/Kanji/Arjun/ Neem/Jamun/Bauhinia variegata
-
-
-
One time Irrigation with Labour Charge
1888
7344
3.89
One time Earth Work (Weeding & Cleaning)
1888
3738
1.98
Maintenance of plants for first year including taking responsibility of all types including hoeing, watering, manuring, weeding and casualty replacement of damaged plant including, all labour T & P as required for proper completion of work as per direction by engineer incharge.
1888
237283
125.68
Same as above item no. 7 but for (2nd Year)
1888
301400
159.64
Same as above item no. 7 but for (3rd Year)
1888
285541
151.24
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements