Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Agriculture or Forestry Works
Eprocure
Opening Date16 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 1,11,41,921
Costs
EMD
₹ 2,23,000Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPKDA_946745_1Bid Award Id
ViewTender No
15/UDYAN/KDA/2024-25Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
P/L C.C. in 1:4:8 ( one cement : 4 fine sand & 8 Brick ballast 40 mm nominal size etc. all Complete. S.I. no. (4.1.8)
0.03
156
5220
... More
12 mm cement plaster with 1:4 cement & coarse sand mortarincluded in all materials, labours T&P etc all complete. S.I. no. 17.58
4.2
840
200
... More
finishing wall with two coats of water proofing cement paint of appd. Quality etc all complete.660+661 pwd sor 2020
4.2
554
132
... More
M.S. Iron Work of small sizes and section such as holding down bolts, holdfast tie rods, grating etc. S.I. NOS.10.2
1
9000
9000
... More
Painting or Varnishing two coat with primer coat of readymixed priming paints & One Coat of appd. Superior Quality paint all complete(S.I. No. 641+642)
4.48
461
103
... More
P/F of Informatation Board and letter writing including painting Complete.
1
9430
9430
... More
Providing and fixing R.C.C Post of 0.15x0.10x1.80m size all complete. As per KDA design using 4 Nos of 8 mm dia 1.75 mm long bar 6 mm dia 8 Nos rings and 7 hooks for barded wire RCC Mix 1:2:4 (Cement : C sand : 20 mm stone grit) with letter Writing and grouting. (Distance Between 2 Post= 3M) (Without G.S.T.)
206
133900
650
... More
Supply and fixing of two ply barbed wire fencing 7 rows straight and two diagonal with cost of material, labour T & P all complete. (Without G.S.T.)
3908.8
34006
8.7
... More
Part-B Horticulture Work
-
-
-
... More
Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. 1x80 Bedx20mL x5m Wx.90mD = 7200 m3 (80Bed Size=20mx5m = 100m2, 80 Bed = 100x80 = 8000 m2)
7200
1252800
174
... More
Material that will be used for soil enrichment with cartage, loading, unloading and all complete of the work.-
-
-
-
... More
For water Retention material (Leaf Compost/sugar cane stalk/other retention material) with cartage, loading, unloading and all complete of the work.
720
360000
500
... More
Perforation Material (Rice Husk) with cartage, loading, unloading and all complete of the work.
640
416000
650
... More
Nourishment material (Farm Yard Manure) with cartage, loading, unloading and all complete of the work.
960
384000
400
... More
Mulching Material (Rice Straw) with cartage, loading, unloading and all complete of the work.
400
240000
600
... More
Soil Microbiology Enhancer 1 (Jeevamrit) with cartage, loading, unloading and all complete of the work.
6400
192000
30
... More
Soil Microbiology Enhancer 2 (Ghan Jeevamrit) with cartage, loading, unloading and all complete of the work.
40
104000
2600
... More
Marking Powder with cartage, loading, unloading and all complete of the work.
2.4
2400
1000
... More
Site Preparation for Forest creation
-
-
-
... More
Supply of Plants (Mehndi, Bael, Jamun, Aonla, Shahtut, Laung, Amaltas, Gulab Desi, Thevetia, Murraya koenigii, Murraya exotica, Melia azedarach, Paras Pipal, Thuja compacta, Bottlebrush, Calliandra, Champa, Parijat, Areca Palm, Kanji, Sita Ashok, Silver oak, Acacia auriculiformis, Chandni, Guava, Pomegranate, Tecoma, Cestrum diurnum, Cestrun nocturnum, China rose, Michelia champaca Ficus spp., Bamboo, Polyalthia longifolia, Cassia siamea, Jacranda, Delonix regia, Arjun, Chitwan, Palash, Kadamb, Sisam, Teak, Sal etc.)
32000
736000
23
... More
Plants Transportation casuality (10%)
3200
73600
23
... More
C.P. 5% on Item No - 13+14
1
40480
40480
... More
Vehicle for transportaion (Tractor with Tipper Trolley)
80
32000
400
... More
Supply and fixing of support stricks (18-20cm periphery, 90cm height)
32000
1040000
32.5
... More
Manpower (for mixing Material & Plantation including local transportation)
3200
1248000
390
... More
Installation of 1.5 Hp Submersible Pump
3
217326
72442
... More
Supply of Rain Gun
1
100000
100000
... More
FIRST YEAR MAINTENANCE
-
-
-
... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.
3840
1497600
390
... More
Guard for Chaukidari (12 Hour shift)
730
284700
390
... More
Mulching process two time in a year of total planting area.
64000
96000
1.5
... More
SECOND YEAR MAINTENANCE
-
-
-
... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.
2880
1123200
390
... More
Guard for Chaukidari (12 Hour shift)
730
284700
390
... More
Mulching process two time in a year of total planting area.
64000
96000
1.5
... More
THIRD YEAR MAINTENANCE
-
-
-
... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.
1920
748800
390
... More
Guard for Chaukidari (12 Hour shift)
730
284700
390
... More
Mulching process two time in a year of total planting area.
64000
96000
1.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements