Kanpur Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Development Authority - KDA Tender

Works
Eprocure
Opening Date12 Sep 2020
Closing Date21 Sep 2020
Tender Amount₹ 4,67,354 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
0.60mx0.60mx0.60m

64.36

-

225.35

... More
Fertilizers

-

-

-

... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all.

11.92

-

6.85

... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete

8.94

-

7.45

... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartageetc. all complete

8.94

-

12.1

... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant

2.38

-

356.8

... More
Maintenance of plants for first year (Chemical Manure & Insecticides)

-

-

-

... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.

11.92

-

6.85

... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete

8.94

-

7.45

... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc.

8.94

-

12.1

... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant

2.38

-

356.8

... More
Maintenance of plants for second year (Chemical Manure & Insecticides)

-

-

-

... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.

23.84

-

6.85

... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.

17.88

-

7.45

... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.

17.88

-

12.1

... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant

2.38

-

356.8

... More
Maintenance of plants for Third year (Chemical Manure & Insectivesides)

-

-

-

... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all.

23.84

-

6.85

... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage all.

17.88

-

7.45

... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc.

17.88

-

12.1

... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant

2.38

-

356.8

... More
Part B Non Taxable Item

-

-

-

... More
Site Survey complete with measuring outer boundry of site and marking points for Plantation.

596

-

0.04

... More
Digging of pits following size

-

-

-

... More
0.60mx0.60mx0.60m

596

-

23.76

... More
Supply and mixing of F.Y.M. (@0.03Cum/Plant) including, loading, unloading, cartage all.

17.88

-

425

... More
Providing well developed Plants of Species (Average height 4-6 ft)

-

-

-

... More
Ficus blakeana/regenald/starlight

350

-

210

... More
Gulmohar/Karanj/bottlebrush/

150

-

84

... More
Bauhinia blakeana

36

-

420

... More
Plumeria alba

60

-

840

... More
One time Irrigation with Labour Charge

596

-

3.89

... More
One time Earth Work (Weeding & Cleaning)

596

-

1.98

... More
Maintenance of plants for first year including taking responsibility of all types including hoeing, watering, manuring, weeding and casualty replacement of damaged plant including, all labour T & P as required for proper completion of work as per direction by engineer incharge.

596

-

125.68

... More
Same as above item no. 7 but for (2nd Year)

596

-

159.64

... More
Same as above item no. 7 but for (3rd Year)

596

-

151.24



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.