Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Housekeeping Services
Eprocure
Opening Date26 Dec 2022
Closing Date5 Jan 2023
Tender Amount₹ 9,88,124
Costs
EMD
₹ 20,000Document Cost
₹ 1,121Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPKDA_762443_1Bid Award Id
ViewTender No
50/UDYAN/21-22Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Class m-150 b/work in foundation with1:4 c/c, sand mortor with supply all material labour t & p etc all complete. PWD 22-23 SI No.6.1.1 CH-6
14
-
6366
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) PWD 22-23 SI No.4.1.3 CH-5
2.04
-
6643
... More
Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tie, rods, gratings etc., (when not included in an over all rates) wrought to required form, including supply of steel, bolts, nuts and wastage etc and their fixing required for proper completion of the work. PWD 22-23 SI No.10.2 CH-10
1080
-
78
... More
12mm Cement plaster in single coat on fair side of single or half brick wall 1;4 c/c, sand mortar PWD 22-23 SI No.13.4.1 CH-13
256.5
-
195
... More
Finishing wall with water proofing cement paint of approved quality with two coat to given an even shade including supply of all materials labour T&P complete.PWD 22-23 SI No.(660+661) CH-15
256.5
-
85
... More
Painting and warnishing to coat over priming coat on steel work including supply of all materials labour T&P complete PWD 22-23 SI No.(641+642+19.29) CH-15
43
-
103
... More
P/L of 80mm thick rubber moulded interlocking tyles over 40mm thick local sand including supply of all material labour tnp required proper complition of work. PWD 22-23 SI No.22 MORD 1500/6.7 CH-26
128
-
870
... More
P/Fixing RCC Bench with hand reset and back rest including all completion of work .
10
-
8888
... More
Providing and Fixing 2 H.P. Pump Set with all accessories. Including Boring of 150mm dia up to 90 Meter in medium sand strata, C-sand or clay or both mixed including S/F of 100mm dia pvc pipe with developing of bore by compressor and also with S/F of MS clamp heavy type and S/F well cap for 110mm dia Pipe Bore etc. all Complete
1
-
86990.1
... More
P/F Play appartus Open Gym
-
-
-
... More
Shoulder Press
1
-
65100
... More
Chest Press
1
-
65500
... More
Pendulam cum Twister
1
-
55200
... More
Leg lift Post
1
-
32800
... More
Horticulture
-
-
-
... More
Site Survey complete with measuring outer boundry of site and marking points for Plantation.
100
-
0.04
... More
Digging of pits following size
-
-
-
... More
0.60mx0.60mx0.60m
100
-
23.76
... More
Supply and mixing of Local Sand(@0.01 CuM/Plant) including, cartage, loading, unloading all.
1
-
605
... More
Supply and mixing of F.Y.M. (@0.01Cum/Plant) including, loading, unloading, cartage all.
1
-
425
... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all.
4
-
6.85
... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage all.
3
-
7.45
... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage all.
3
-
12.1
... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
0.4
-
356.8
... More
Providing well developed Plants of below species.
-
-
-
... More
Ficus blakeana/regenald/starlight.
29
-
210
... More
Plumeria alba/rubra
25
-
840
... More
Neem/Gulmohar/Kanji/Kachnar/Ashok etc. (8' average height - Spp may vary as per availability).
46
-
84
... More
One time Irrigation with Labour Charge
100
-
3.89
... More
One time Earth Work (Weeding & Cleaning)
100
-
1.98
... More
Maintenance of Plants for 1st Years
100
-
125.68
... More
Development of Hedge.
170
-
135
... More
Maintenance of hadge for 1st Years. Same Quantity as above item no.13
170
-
65
... More
Development of Lawn with grass selection no.1 carpet.
203
-
153
... More
Maintenance of Lawn 1st Years. Same Quantity as above item no.15
203
-
38
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements