Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Civil And Construction
Housekeeping Services
Eprocure
Opening Date26 Dec 2022
Closing Date5 Dec 2022
Tender Amount₹ 12,56,907
Costs
EMD
₹ 26,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPKDA_762459_1Bid Award Id
ViewTender No
70/UDYAN/22-23Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) PWD 22-23 SI No.4.1.3 CH-5
1.5
-
6643
Earth work: Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.5m lead upto 30m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. PWD 22-23 SI No.2.6(2.6.1) CH-4
8.5
-
155
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded Brick aggregate 40 mm nominal size)PWD 22-23 SI No.274 CH-4
12
-
5000
Class m-150 b/work in foundation with1:4 c/c, sand mortor with supply all material labour t & p etc all complete. PWD 22-23 SI No.6.1.1 CH-6
7
-
6366
Class m-150 brick work with 1:4 C/C. Sand in mortar in super structure above and plan 15 level including supply of all materials labour T&P complete. PWD 22-23 SI No.6.4.1 CH-6
28
-
7218
Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tie, rods, gratings etc., (when not included in an over all rates) wrought to required form, including supply of steel, bolts, nuts and wastage etc and their fixing required for proper completion of the work. PWD 22-23 SI No.10.2 CH-10
300
-
78
12mm Cement plaster in single coat on fair side of single or half brick wall 1;4 c/c, sand mortar PWD 22-23 SI No.13.4.1 CH-13
116.5
-
195
Finishing wall with water proofing cement paint of approved quality with two coat to given an even shade including supply of all materials labour T&P complete.PWD 22-23 SI No.(660+661) CH-15
116.5
-
85
Painting and warnishing to coat over priming coat on steel work including supply of all materials labour T&P complete PWD 22-23 SI No.(641+642+19.29) CH-15
8
-
103
P/L of 80mm thick rubber moulded interlocking tyles over 40mm thick local sand including supply of all material labour tnp required proper complition of work. PWD 22-23 SI No.22 MORD 1500/6.7 CH-26
92
-
870
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) PWD 22-23 SI No.4.1.3 CH-5
2.2
-
6643
P/Fixing RCC Bench with hand reset and back rest including all completion of work .
6
-
8888
Providing and Fixing 2 H.P. Pump Set with all accessories. Including Boring of 150mm dia up to 90 Meter in medium sand strata, C-sand or clay or both mixed including S/F of 100mm dia pvc pipe with developing of bore by compressor and also with S/F of MS clamp heavy type and S/F well cap for 110mm dia Pipe Bore etc. all Complete
1
-
86990.1
Supply & instalation at Site, Following type of swings as shown including all Complete.
-
-
-
Double Arc Swing
1
-
58321
Zig Zag Slide 5 feet
1
-
81013
Mother child Swing
1
-
42612
Straight open slide 5 feet
1
-
80808
Double circular swing
1
-
70335
Seating MGR
1
-
84710
Horticulture
-
-
-
Site Survey complete with measuring outer boundry of site and marking points for Plantation.
88
-
0.04
Digging of pits following size
-
-
-
0.60mx0.60mx0.60m
88
-
23.76
Supply and mixing of Local Sand(@0.01 CuM/Plant) including, cartage, loading, unloading all.
0.88
-
605
Supply and mixing of F.Y.M. (@0.01Cum/Plant) including, loading, unloading, cartage all.
0.88
-
425
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all.
3.52
-
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage all.
2.64
-
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage all.
2.64
-
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
0.35
-
356.8
Providing well developed Plants of below species.
-
-
-
Ficus blakeana/regenald/starlight.
25
-
210
Plumeria alba/rubra
20
-
840
Neem/Gulmohar/Kanji/Kachnar/Ashok etc. (8' average height - Spp may vary as per availability).
43
-
84
One time Irrigation with Labour Charge
88
-
3.89
One time Earth Work (Weeding & Cleaning)
88
-
1.98
Maintenance of Plants upto 6 months for 1st Years
88
-
62.84
Development of Lawn with grass selection no.1 carpet as per analysis.
320
-
153
Maintenance of Lawn upto 6 months for 1st Years. Same Quantity as above item no.13 as per analysis.
320
-
19
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements