Kanpur Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Kanpur Development Authority - KDA Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date17 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 98,06,524 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Class m-150 brick work with 1:4 C/C. Sand in mortar in Foundation above and plinth 15 level including supply of all materials labour T&P complete. (SI No 305)

0.15

990

6600

... More
Class 150 B/W in S/S with 1:4 cement & csand

0.37

2775

7500

... More
P/L C.C. in 1:4:8 ( one cement : 4 fine sand & 8 Brick ballast 40 mm nominal size etc. all Complete. S.I. no. (4.1.8)

0.05

261

5220

... More
12 mm cement plaster with 1:4 cement & coarse sand mortarincluded in all materials, labours T&P etc all complete. S.I. no. 17.58

4.7

940

200

... More
providing and applying white cement based putty of average thickness of 1 mm of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth including cost of materials labour t&p etc complete Si. No. New S.No. 30 SOR 2023

4.7

634

135

... More
finishing wall with two coats of water proofing cement paint of appd. Quality etc all complete.660+661 pwd sor 2020

4.7

620

132

... More
M.S. Iron Work of small sizes and section such as holding down bolts, holdfast tie rods, grating etc. S.I. NOS.10.2

1

9000

9000

... More
Painting or Varnishing two coat with primer coat of readymixed priming paints & One Coat of appd. Superior Quality paint all complete(S.I. No. 641+642)

4.7

484

103

... More
P/F of Informatation Board and letter writing including painting Complete.

1

9430

9430

... More
Providing and fixing R.C.C Post of 0.15x0.10x1.80m size all complete. As per KDA design using 4 Nos of 8 mm dia 1.75 mm long bar 6 mm dia 8 Nos rings and 7 hooks for barded wire RCC Mix 1:2:4 (Cement : C sand : 20 mm stone grit) with letter Writing and grouting. (Distance Between 2 Post= 3M) (Without G.S.T.)

310

201500

650

... More
P/Fixing chain link fencing

891

516780

580

... More
Part-B Horticulture Work

-

-

-

... More
Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. 1x80 Bedx20mL x5m Wx.90mD = 7200 m3 (62 Bed Size=20mx5m = 100m2, 62 Bed = 100x62 = 6200 m2)

5580

970920

174

... More
Material that will be used for soil enrichment with cartage, loading, unloading and all complete of the work.-

-

-

-

... More
For water Retention material (Leaf Compost/sugar cane stalk/other retention material) with cartage, loading, unloading and all complete of the work.

558

279000

500

... More
Perforation Material (Rice Husk) with cartage, loading, unloading and all complete of the work.

496

322400

650

... More
Nourishment material (Farm Yard Manure) with cartage, loading, unloading and all complete of the work.

744

297600

400

... More
Mulching Material (Rice Straw) with cartage, loading, unloading and all complete of the work.

310

186000

600

... More
Soil Microbiology Enhancer 1 (Jeevamrit) with cartage, loading, unloading and all complete of the work.

6200

186000

30

... More
Soil Microbiology Enhancer 2 (Ghan Jeevamrit) with cartage, loading, unloading and all complete of the work.

31

80600

2600

... More
Marking Powder with cartage, loading, unloading and all complete of the work.

1.86

1860

1000

... More
Site Preparation for Forest creation

-

-

-

... More
Supply of Plants (Mehndi, Bael, Jamun, Aonla, Shahtut, Laung, Amaltas, Gulab Desi, Thevetia, Murraya koenigii, Murraya exotica, Melia azedarach, Paras Pipal, Thuja compacta, Bottlebrush, Calliandra, Champa, Parijat, Areca Palm, Kanji, Sita Ashok, Silver oak, Acacia auriculiformis, Chandni, Guava, Pomegranate, Tecoma, Cestrum diurnum, Cestrun nocturnum, China rose, Michelia champaca Ficus spp., Bamboo, Polyalthia longifolia, Cassia siamea, Jacranda, Delonix regia, Arjun, Chitwan, Palash, Kadamb, Sisam, Teak, Sal etc.)

24800

570400

23

... More
Plants Transportation casuality (10%)

2480

57040

23

... More
C.P. 5% on Item No - 13+14

1

31372

31372

... More
Vehicle for transportaion (Tractor with Tipper Trolley)

62

24800

400

... More
Supply and fixing of support stricks (18-20cm periphery, 90cm height)

24800

806000

32.5

... More
Manpower (for mixing Material & Plantation including local transportation)

2480

967200

390

... More
Installation of 1.5 Hp Submersible Pump

3

217326

72442

... More
Supply of Rain Gun

1

100000

100000

... More
FIRST YEAR MAINTENANCE

-

-

-

... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.

2976

1160640

390

... More
Guard for Chaukidari (12 Hour shift)

730

284700

390

... More
Mulching process two time in a year of total planting area.

49600

74400

1.5

... More
SECOND YEAR MAINTENANCE

-

-

-

... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.

2232

870480

390

... More
Guard for Chaukidari (12 Hour shift)

730

284700

390

... More
Mulching process two time in a year of total planting area.

49600

74400

1.5

... More
THIRD YEAR MAINTENANCE

-

-

-

... More
Maintenance of Plants upto One Year incuding irrigation by air gun, Hoeing, weeding and reparing of stack etc. all complete of the work as per I/C. & guide line of Miyawaki method.

1488

580320

390

... More
Guard for Chaukidari (12 Hour shift)

730

284700

390

... More
Mulching process two time in a year of total planting area.

49600

74400

1.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.