Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Mar 2024
Closing Date14 Mar 2024
Tender Amount₹ 2,59,87,943
Costs
EMD
₹ 5,20,000Document Cost
₹ 8,260Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPKDA_911566_1Bid Award Id
ViewTender No
149/AA-3/KDA/22-23Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause Morth 401.
909
2931525
3225
... More
S/L Polyvinyl chloride sheet 400 micron thick including supply of all material labour T&P etc. All complete (DSR-2021 code N0 - 3002)
4325
194625
45
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). 5.33.1 All works upto plinth level(Chapter-5 SOR-2022 S.I.NO-5.33.1)
1363
12779488
9376
... More
Mild steel (Tor steel or plain) in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply in all complete. (PWD S.I No- 04)
161
1191400
7400
... More
Supply and mixing 3.5 Kg and or as specified by the manufacturer, hardener in tremix concrete per Sqm on Cement Concrete surface dewatering and finished including the cost of material, labour, equipment’s, tools and plants, loading and unloading, transportation as per the specification and directed by Engineer-in-charge with all lead and lift.
4325
830400
192
... More
Construction and expansion joint in C.C. road including all charges etc. required for proper completion of the work.
240
9120
38
... More
DRAIN WORK (PART-B)
-
-
-
... More
Earthwork: Excavation in foundation etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 50m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation as directed by Engineer- in- charge with lead of 50 m . (PWD SI No-251)
612
93024
152
... More
Providing and laying in position in position ready mixed plain cement cocrete with cement concrete as per approved design mix and manufactured in fully autoic batching plant and transported to site of work in transit mixer for all leads,having continous agitated mixer,manufactured as per design of specified grade for plain cement concrete work including pumping of R.M.C. from transit mixer to site of laying and curing excluding the cost of centering, shuttering, finishing including cost of curing admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). 5.33.1 All works upto plinth level(Chapter-5 SOR-2022 S.I.NO-4.20.1.2)
102
671262
6581
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). 5.33.1 All works upto plinth level(Chapter-5 SOR-2022 S.I.NO-5.33.1)
406
3806656
9376
... More
Mild steel (Tor steel or plain) in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply in all complete. (PWD S.I No- 5.22.6/2022/pwd)
255
1887000
7400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements