Kanpur Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Kanpur Development Authority - KDA Tender
Agriculture or Forestry Works
Eprocure
Opening Date29 Oct 2018
Closing Date13 Nov 2018
Tender Amount₹ 69,24,325
Costs
EMD
₹ 1,38,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPKDA_237311_2Bid Award Id
ViewTender No
14/Udyan/18-19Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
175.5
1307
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
175.5
2123
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
46.8
16698
356.8
Providing and fixing R.C.C Post of 0.15x0.10x1.80m size all complete. As per KDA design using 4 Nos of 8 mm dia 1.75 mm long bar 6 mm dia 8 Nos rings and 7 hooks for barded wire RCC Mix 1:2:4 (Cement : C sand : 20 mm stone grit) with letter Writing and grouting. (Distance Between 2 Post= 3M) (Without G.S.T.)
334
178356
534
Maintenance of plants for first year (Chemical Manure & Insectisides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
234
1602
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
175.5
1307
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
175.5
2123
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
46.8
16698
356.8
Maintenance of plants for second year (Chemical Manure & Insectisides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
468
3205
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
351
2614
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
351
4247
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
46.8
16698
356.8
Maintenance of plants for Third year (Chemical Manure & Insectisides)
-
-
-
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage etc. all complete.
468
3205
6.85
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage etc. all complete.
351
2614
7.45
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage etc. all complete.
351
4247
12.1
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
46.8
16698
356.8
Supply and fixing of two ply barbed wire fencing 7 rows straight and two diagonal with cost of material, labour T & P all complete. (Without G.S.T.)
912
62016
68
Part B Non Taxable Item
-
-
-
Site Survey complete with measuring outer boundry of site and marking points for Plantation.
11700
468
0.04
Digging of pits following size
-
-
-
0.60mx0.60mx0.60m
11700
277992
23.76
Supply and mixing of F.Y.M. (@0.03Cum/Plant) including, loading, unloading, cartage etc. all complete.
351
149175
425
Providing well developed Plants of below mentioned Species of 8 ft Average Height.
-
-
-
Teak/Delonix regia/Cassia siamea/Kanji/ Arjun/ Neem/Jamun/Bauhinia variegata
11700
982800
84
One time Irrigation with Labour Charge
11700
45513
3.89
One time Earth Work (Weeding & Cleaning)
11700
23166
1.98
Maintenance of plants for first year including taking responsibility of all types including hoeing, watering, manuring, weeding and casualty replacement of damaged plant including, all labour T & P as required for proper completion of work as per direction by engineer incharge.
11700
1470456
125.68
Same as above item no. 7 but for (2nd Year)
11700
1867788
159.64
Same as above item no. 7 but for (3rd Year)
11700
1769508
151.24
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements